IIIAGE DAILY URIT PDRER LEYEL ~

DOCKET N0..50-250 UNIT Turke Point Unit 3

DATE August 15, 1988 CONPLETED BY S.

D. Ferre11 TELEPNNE (407) 694-4433

Ju1y, 1988 DAY AVERAGE DAILY POMER LEVEL (N W-Net)

?/ 1/88 7/ 2/88 7/ 3/88 7/ 4/88 7/ 5/88 7/ 6/88 7/ 7/88 7/ 8/88 7/ 9/88 7/10/88 7/11/88 7/12/88 7/13/88 7/14/88 7/15/88 7/16/88 7/17/88 7/18/88 7'/19/88 7/20/88 7/21/88 7/22/88 7/23/88

'7/24/88 7/25/88 7/26/88 7/27/88 7/28/88 7/29/SS 7/30/88 7/31/88 674 678 676 673 671 673 o73 676 677 675 672 673 673 674 673 667 668 672 678 677 675 671 670 667 668 666 663 664 637 473 676 8308230138 880815 PDR ADOCK 0500025

It

QPEF:ArIHG SrArUS QF ERA1XHG DAI A REF QRT DOCKET HQ 50 250 DATE 8/10/88 COMPLETED BY Hi M.

GRANT TELEF'HONE 305/694/4432 1.

UNIT NAMEl TURI(EY F'OINT UHXT 3 2.

REF'QRTIHG PERIOD; JULY r 1988 3o LICENSED THERMAL POHER (MWT):

'72PP NAMEPLATE RATING (GROSS MHE) I 760 5.

DESXGN ELECTRICAL RATING (HET MME) l 693 6.

MAXIMUM DEF'ENDABLE CAF'ACXTY (GROSS MME):

699 7.

MAXIMUM DEPENDABLE CAF'ACITY (NET MME):

666 8.

XF CHAHGES OCCUR IH CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REF'QRTr G'IVE REASONS'OHER LEVEL TO WHICH RESTRICTED'F ANY (NET MHE) 10'EASOHS FOR RESTRICTIOHSr IF AHY'ONTHLY

-YTD-CUMULATIVE 11.

HOURS IN REF'ORT PERIOD I 12.

HUME:ER OF HOURS REACTOR HAS CRITICAL 13, REACTOR RESERVE SHUTDOHH HOURS 14.

HOURS GENERATOR ON-LINE 15.

UNIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GENERATED (MHH) 17, GROSS ELECTRICAL ENERGY GENERATED (MHH) 18.

HET ELECTRXCAL ENERGY GENERATED (MkfH) 19.

UNIT SERVICE FACTOR 20.

LINIT AVAILABILITYFACTOR 21.

CAF'ACITY FACTOR (USING MDC NET) 22.

CAPACITY FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE 24, SHLJTDOWHS 'SCI-IEDULED OVER NEXT 6 MONTHS 744 744.0 0.0 744.0 0.0 1625539 518910 494465 1,00. 0 100.0 99o8 95o9 OoO 5111 3922.4 0 ~ 0 3836o9 0.0 8146711 2635370 249'745'7 75ii 75.1 73 '

70.4 24.9 137240e6 91898.1 844o4 90672.1 844.4 187950974 60233371 56971238 66.1 66.2 63 '

59

~

9'i.i 25 IF SHUT DOHH AT EHD OF REPORT F'ERIOD ESTIMATED DATE OF STARTUF':

~

~

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Jul y, 1988 DOCKET NO.

UNn NAME Turke Point Unit 3

~5.

988 COMPLETED BY S.

D. Ferre 1 1 TELEPHONE 407 694 4433 Date Type'uration (Hours)

Reason~

Method of Shutting Down Reactor Ucensee Event Report¹ System Code~

Component Codes Cause 8 Corrective Actionto PreventRecurrence 07 880729 S

0.0 HA VALVOP Unit 83 was reduced to approximately 40K power to perform turbine valve testing.

F Forced S Scheduled Reason A - Equipment Failure (Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

ExhibitG-Instructions forPreparation ofData EntryScheetsLicensee Event Report(LER) File (NUREG4161)

Exhibit1-Same Source 001 5s7

Qi

MMARYOF OPERATING EXPER CE DOCKET NO.

UNIT DATE COMPL'ETED BY TELEPHONE 50-'250 Turkey Point Unit 3 August 15,

1988, S.

D. Ferre11 (407);

694-4433'EPORT MONTH

Ju1y, 1988 See the "Unit Shutdowns and Power. Reduction Report".

<~

i

cRAGE DAILY.UNIT PtIER LEVEL DOCKET NO.

50-251 UNIT Turke Point Unit 4 August 15, 1988 CNPLETED BY S.

D. Ferrell TELEPHONE (407) 694-4433

July, 1988 DAY AVERAGE DAILY'POMER LEVEL (N Qa-Nt) 7/ 1/88 7/ 2/88 7/ 3/88 7/ 4/88 7/ 5/SS 7/ 6/88 7/ ?/88 7/ 8/88 7/ 9/SS 7/io/88 7/11/88 7/12/88 7/i3/SS 7/14/88 7/15/88 7/16/88 7/17/88 7/18/88 7/19/SS 7/20/88 7/21/88 7/22/88 7/23/88

,7/24'/88 7/25/88 7/26/88 7/27/88 7/28/88 7/29/88 7/30/88.

7/31/88 677 680 680 674 674 6?5 677 676 680 678 674 673 675 674 675 669 670 674 680 683 679 674 673 670 672 669 666 666 668 65 279

QF'ERATXHG STATUS OPERATING DATA REPORT DOCKET NQ 50 a ~g DATE 8/10/86 COMPLETED BY HE HE GRAH('ELEPHONE 305/694/443 1.

UNIT NAML": TURVEY POINT UNIT 2

~

REF'QRTING PERIOD t JULY r 1988 3.

LICENSFD THERMAL POWER

( MAT):

~200 HAMEF'LATE RATING

<GROSS MME) t 760 5.

DESIGN ELECTRICAL RATING (NET MME):

693 6

~

MAXIMUM DEF'ENDABLE CAF'ACITY (GROSS MME):

699 7t MAXIMUM DEPENDABLE CAF'ACITY <NET MHE):

666 8,

X~

CHANGES OCCUR IN CAFACITY RATINGS

<ITEMS NUMBER 3 THROUGH 7>

SINCE LAST REP(3l 'T, GIVE REAS(3HS l P t POWER LEVEL TO HHICH RESTRICTED r IF AHY (NET MHE) 10.

REASONS FOR RESTRICTIONS~ IF ANY'QNTHI Y

-YTD-CUMULATIVE ill J.3 t 15

'6'.

17t lent 19

~

e

~

'7 1 a ~ t PP 3

".> 4 HOURS IH REPORT F'ERIODt HUMBER QF l-lauRS REACTOR HAS CRITICAL REACTOR RESERVE SHUTDOHN HOURS HOURS GENERATOR ON-LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GENERATED

<MHH)

GROSS ELECTRICAL ENERGY GENERATED (MHH)

HET ELECTRICAL ENERGY GENERATED (MMH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR CAPACITY FACTOR (USING MDC NET >

CAF'ACITY FACTOR

<USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELXHG 9/17/88 x

105 DAYS 744 744.0 0 ~ 0 744.0 0 ~ 0 1613332 516005 491703 100.0 100.0 99 '

95t4 0.0 5111 3989 '

0 ~ 0 3935.3 0.0 8448855 2758110 2616173 77to 77 '

76 '

73.9 23 '0 130972.0 89176 '

166.6 86141.4 166.6 181904478 5eo 787 5493495.

65te 65 '

64.3 60.5 lith

25. IF SHUT DQHN AT EHD OF REPORT F'ERIOD ~

ESTIMATED DATE OF STARTUF'

Qi

REPORT MONTH

July, 1988 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.

50-251 Turkey Point Unit 4 DATE August 15, 1988 COMPLETED BY S.

D.

Fe rre 1 l TELEPHONE (407) 694-4433 No.

Date Type'uration (Hours)

Reason~

Method of Shutting Down Reactor'icensee Event Reporti'ystem Code4 Component Codes Cause &Corrective Actionto PreventRecurrence 09 880730 0.0 HA VALVOP Unit ini4 was reduced to approximately 50'A power to perform turbine valve testing.

While the unit was at reduced

power, a leak in the 4A condenser waterbox was repaired.

F Forced S Scheduled 2

Reason A - Equipment Failure (Exphin)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)

ExhibitG-Instructions forPreparation ofData EntryScheets Ucensee Event Report (LER) File (NUREG4161)

Exhibit1-Same Source

Oi

<Q

OIMMARY'OFOPERATING EXPElICE DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-251 Turke Point Unit 4 Au ust 15, 1988 S.

D. Ferrell (407) 694-4433 REPORT MONTH

July, 1988 See the "Unit Shutdowns,and Power Reduction Report".