ML17345A354

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/88-20 & 50-251/88-20 on 880801-05 & Notice of Violation.Insp Repts & Notice of Violation Withheld (Ref 10CFR2.790 & 73.21)
ML17345A354
Person / Time
Site: Turkey Point  
Issue date: 09/01/1988
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Conway W
Florida Power & Light Co
References
NUDOCS 8809080048
Download: ML17345A354 (5)


See also: IR 05000250/1988020

Text

ACC<~~~ut,a~RViX@K oxKKNNVt4X@(Rzog~~~

~4< P~ ESSION NBR:8809080048

DOC.DATE: 88/09/01

NOTARIZED:

NO

.

DOCKET

IL:50-250 Turkey Point Plant, Unit 3, Florida Power

and Light

C

05000250

50-251 Turkey Point Plant, Unit 4, Florida Power

and Light C

05000251

AUTH.NAME

AUTHOR AFFILIATION

CLINE,W.E.

Region

2, Ofc of the Director

RECZP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

Florida Power

6 Light Co.

SUBJECT:

Forwards

Insp Repts

50-250/88-20

6 50-251/88-20

on

880801-05.Violations

noted. Encl withheld (ref 10CFR2.790).

DISTRIBUTION CODE:

ZE04D

COPIES

RECEIVED:LTR /

ENCL Q

SIZE:

TITLE: Safeguards

Inspection

Rpt/NOV Response

(50 DKT)-Publicly Available

NOTES'ECIPIENT

ID CODE/NAME

PD2-2

LA

EDISON,G

INTERNAL: AEOD/DOA

NRR/DRIS/SIB 9A

NUDOCS-ABSTRACT

RGN2

FILE

01

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

~ 1

1

1

RECIPIENT

ID CODE/NAME

PD2-2

PD

NRR/DRIS/SGB

9D

NR /

ILRB12

~FLE

02

NRC

PDR

COPIES

LTTR ENCL

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

13

ENCL

~i';FEGUARDS INFORMATION

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Mr.

W.

F.

Conway

Senior Vice President

- Nuclear

P.

0.

Bog,140QOi

"

.

~ ..

. gunp Beach; .FL'33408-0420

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NOS. 50-250/88-20

AND 50-251/88-20)

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

A. Tillman on August 1-5,

1988.

The inspection

included

a review of activities

authorized

for your Turkey Point nuclear plant.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

The inspection

findings indicate that certain activities

appeared

to violate

NRC requirements.

The violation, references

to pertinent

requirements,

and

elements

to

be included in your response

are described

in the enclosed

Notice

of Violation.

The violation described

in the

enclosed

Notice is similar to

a violation

contained

in the Notice sent to you by our letter dated

February ll, 1988.

Because

"similar violations,"

as

described

in the

NRC Enforcement Policy, are

of significant concern

to the

NRC,

please

give particular attention

in your

response

to the identification of the root cause'f

this problem

and your

corrective action to prevent recurrence".

In accordance

with 10

CFR 2.790(d)

and

10

CFR 73.21,

safeguards

activities and

security measures

are

exempt: from public disclosure.

Therefore,

the enclosures

to this letter with the exception of the report cover page,

which presents

a

nonexempt

summary,

wi 11 not be placed in the

NRC Public Document

Room.

i=GUAROS INFORMATION;'.;*,.*"*';,-- '"""

rrna ien. Shen ~para~ tra

~

~ 4 )

~

The responses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork Reduction Act of 1980,

Pub.

L.

No.96-511.

8809080048

880901

PDR

ADOCK 05000250

9

PNU

..:iiFEGUARDS INFORMATION

Florida Power and Light Company

SEP

<$88

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Enclosures:

1.

Notice of Violation

'Safeguards

Information)

2.

NRC Inspection

Report

(Safeguards

Information)

William E. Cline, Chief

Nuclear Materials Safety

and

Safeguards

Branch

Division of Radiation Safety

and Safeguards

cc w/encls:

J.

ST

Odom, Vice President

Turkey Point Nuclear Plant

J.

E.

Cross,

Plant Manager

Turkey Point Nuclear Plant

L.

W. Bladow, Plant

gA Superintendent

J. Arias, Jr.,

Regulatory

and Compliance

Supervisor

bcc w/encls:

NRR/DRIS/SB

bcc w/Inspection

Summary:

Document Control

Desk (RIDS IE04),

016

State of Florida

RII

5.A illman:er

r 08/i$ /88

DMcGuire

OS]/8S

> te

rlenjak

/

/ss

RG'

CJ~R~g

n

os/gt

jhow

',":="-iJARDS INFORMATION

Oo:ument transmitted herewith

ccnto!ns sensitive unclassified

Informetlon. When separated from

en"tosuros, this document ts decontroiled.