ML17345A328

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-250/88-17 & 50-251/88-17 on 880705-08.No Violations or Deviations Noted
ML17345A328
Person / Time
Site: Turkey Point  
Issue date: 08/10/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17345A329 List:
References
NUDOCS 8808230279
Download: ML17345A328 (4)


See also: IR 05000250/1988017

Text

AUG 10 1988

~ Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida Power

and Light Company

ATTN:

Mr.

W.

F.

Conway

Senior Vice President

Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-250/88-17

AND 50"251/88-17

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by J. J.

Lenahan

on July 5-8,

1988.

The

inhpection

included

a

review of

activities authorized for your Turkey Point facility.

At the conclusion

of

the inspection,

the findings were discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the inspection,

no violations or deviations

were identi-

fied.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page 2)

A an

R.

erdt, Chief

Engineering

Branch

Division of Reactor Safety

8808230279

880810

PDR

ADOCK 05000250

6

~ kt44

I

1

AUB 10 1988

Florida Power and Light Company

cc w/encl:

J.

S.

Odom, Vice President

Turkey Point Nuclear Plant

J.

E. Cross,

Plant Manager

Turkey Point Nuclear Plant

L. W. Bladow, Plant

gA Superintendent

J. Arias, Jr.,

Regulatory

and Compliance

Supervisor

'cc w/encl:

G.

E. Edison, Project Manager,

Project

Directorate II-2, Division of Reactor

Projects,

NRR

NRC Resident

Inspector

DRS Technical Assistant

Document Control

Desk

State of Florida

RII

JLenahan:ser

07/i( /88

RII~g,

FJa et

/~/88

/

/88

4