Forwards Insp Repts 50-250/88-19 & 50-251/88-19 on 880718-22.Violation Not Cited
ML17345A344
Person / Time
Site: Turkey Point  
Issue date: 08/19/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17345A345 List:
References
NUDOCS 8809010038
Download: ML17345A344 (4)


See also: IR 05000250/1988019

Text

ACCELERATED

DISI'RIBUTION

DEMONS~PON

SYSTE jul

h

ACCESSION NBR:8809010038

DOC.DATE: 88/08/19

NOTARIZED:

NO

DOCKET

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power

and Light C

05000250

50-251 Turkey Point Plant, Unit 4, Florida Power

and Light

C

05000251

AUTH.NAME

AUTHOR AFFILIATION

OLLINS,D.M.

Region

2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

Florida Power

6 Light Co.

SUBJECT:

Forwards

Insp Repts

50-250/88-19

& 50-251/88-19

on

880718-22.Violation not being cited.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR l

ENCL J

SIZE:

4

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD2-2

PD

INTERNAL: AEOD

NRR MORISSEAUgD

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS

DZR 9A

NUDOCS-ABSTRACT

e

OGC/HDS2

RES/DSIR

DEPY

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

'1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

EDZSONiG

DEDRO

NRR/DLPQ/PEB

11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE LIEBERMANiJ

G~XGE~

02

GN2

FILE

01

4

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

0

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

23

ENCL

23

Docket Nos.

50-250,

50-251

License

Nos.

DPR-31,

DPR-41

Florida

Power

and Light Company

~N:

Yir. W. F.

Conway

Senior Vice President - Nuclear

P. 0.

Box 14000

Juno Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT

NOS. 50-250/88-19

AND 50-251/88-19

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

B.

Kuzo on July 18-22,

1988.

The inspection

included

a review of activities

authorized

for your

Turkey

Point facility.

At the

conclusion

of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

~

~

~

~

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

The inspection

findings indicate that certain activities appeared

to violate

NRC requirements.

However,

because all of the criteria for categorization of

licensee

identified violations

were met,

the violation is not being cited.

The details pertaining to the licensee identified violation are described

in the

inspection report.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

'itle 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

gr(g( nal z'@nkvd

/gg

/

. Deck.e-

Douglas

M., Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

Enclosure:

(See

page

2)

8809010038

880819

PDR

ADQCK 05000250

G

PNU

Florida Power and Light Company

Enclosure:

Inspection

Report

cc w/encl:

V. S.

Odom, Vice President

Turkey Point Nuclear Plant

LJ ~E. Cross,

Plant Manager

Turkey Point Nuclear Plant

M W. Bladow, Plant

gA Superintendent

g. Arias, Jr., Regulatory

and Compliance

Supervisor

bcc w/encl:

~ E. Edison, Project Manager, Project

Directorate II-2, Division of Reactor

Projects,

HRR

WC Resident

Inspector

DRS Technical Assistant

Document Control

Desk

State of Florida

8/(-'88

8/i. /88

8/g /8

8/(Q /88