Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-90-184, Documents Written & Verbal Request for Temporary Waiver of Compliance from Tech Spec 3.4.5.b.2 Re Intake Cooling Water Pump 4B Replacement,Based on 900513 Reduction of Flow from Pump.Waiver Should Extend Until 900522 + (15:13:29, 7 January 2025)
- L-90-178, Monthly Operating Repts for Apr 1990 for Turkey Point,Units 2 & 3 + (15:13:33, 7 January 2025)
- ML17348A245 + (15:13:35, 7 January 2025)
- ML17348A244 + (15:13:37, 7 January 2025)
- ML17348A243 + (15:13:37, 7 January 2025)
- ML17348A241 + (15:13:38, 7 January 2025)
- L-90-163, Forwards Thimble Tube Eddy Current Insp Rept Re NRC Bulletin 88-009, Thimble Tube Thinning in Westinghouse Reactors. Insp Conducted at End of Cycle Xi.One Thimble Required to Be Isolated Until Wear Rate Determined + (15:13:39, 7 January 2025)
- 05000251/LER-1990-003-02, :on 900409,reactor Protection Sys Actuation Occurred Due to Failure of Reactor Coolant Pump Underfrequency Relay Power Supply Capacitor.Caused by Open Supply Breakers.Relay Replaced + (15:13:44, 7 January 2025)
- ML17348A237 + (15:13:46, 7 January 2025)
- L-90-164, Requests M Wagner Take Generic Fundamentals Exam Section of Operator Licensing Exam to Be Administered on 900606 + (15:13:47, 7 January 2025)
- 05000250/LER-1990-006, :on 900406,control Room Ventilation Sys for Common Control Room of Units Tripped While Performing Procedure TP-584.Caused by Personnel Error.Individual Counseled + (15:13:49, 7 January 2025)
- ML17348A232 + (15:13:50, 7 January 2025)
- ML17348A231 + (15:13:52, 7 January 2025)
- L-90-160, Provides Revised Response to Emergency Power Sys Enhancement Project,Per 900426 Discussion + (15:13:53, 7 January 2025)
- ML17348A228 + (15:13:53, 7 January 2025)
- 05000250/LER-1990-007, :on 900408,CCW Pump 3B Automatically Started Due to Low Pump Discharge Header Pressure.Caused by Inadequate Procedural Controls in Operating Surveillance Procedure 3-OSP-030.7.Procedures Changed + (15:13:56, 7 January 2025)
- ML17348A219 + (15:13:57, 7 January 2025)
- ML17348A218 + (15:13:59, 7 January 2025)
- ML17348A217 + (15:13:59, 7 January 2025)
- ML17348A215 + (15:14:00, 7 January 2025)
- IR 05000250/1990010 + (15:14:02, 7 January 2025)
- ML17348A212 + (15:14:03, 7 January 2025)
- ML17348A211 + (15:14:04, 7 January 2025)
- ML17348A210 + (15:14:05, 7 January 2025)
- L-90-137, Forwards Select Sys Assessment Progress Summary for Mar 1990,per 860812 Order + (15:14:06, 7 January 2025)
- 05000250/LER-1989-014, :on 890912,discovered That Component Cooling Water Flow Rate to Emergency Containment Coolers Below DBA Requirements.Caused by Inadequate Administrative Controls. Mechanical Stops Readjusted to Prior Setting + (15:14:08, 7 January 2025)
- ML17348A207 + (15:14:10, 7 January 2025)
- L-90-124, Application for Amends to Licenses DPR-31 & DPR-41, Modifying Tech Specs to Delete Specific Composition List for Nuclear Review Board & Specifying Requisite Level of Technical Expertise for Nuclear Review Board + (15:14:11, 7 January 2025)
- ML17348A205 + (15:14:11, 7 January 2025)
- L-90-139, Special Rept Re Breached Fire Barriers & Other Fire Protection Sys Impairments.Fire Protection Impairments 3306 Issued for Repair of Fireproofing Impaired by Removal of Conduits.Compensatory Measures Still Underway + (15:14:13, 7 January 2025)
- IR 05000250/1990006 + (15:14:21, 7 January 2025)
- ML17348A198 + (15:14:26, 7 January 2025)
- ML17348A197 + (15:14:27, 7 January 2025)
- IR 05000250/1989203 + (15:14:28, 7 January 2025)
- IR 05000250/1990007 + (15:14:30, 7 January 2025)
- ML17348A192 + (15:14:32, 7 January 2025)
- L-90-123, Informs That Procedures for Supplemental Fracture Toughness Testing Submitted to NRC Via B&W Owners Group Which Transmitted BAW-2086, B&W J-R Test Procedure for Wedge Opening Loaded Fracture Toughness Specimens + (15:14:33, 7 January 2025)
- L-90-140, Forwards Response to 900316 Request for Addl Info Re Emergency Power Sys Enhancement project,specifically,1986 Edition of ANSI B31.1 Code Design Basis Code for Diesel Generator Piping + (15:14:35, 7 January 2025)
- ML17348A189 + (15:14:37, 7 January 2025)
- IR 05000250/1989048 + (15:14:38, 7 January 2025)
- ML17348A187 + (15:14:40, 7 January 2025)
- 05000250/LER-1990-005, :on 900316,health Physics Shift Supervisor Found to Be Contaminated While Exiting Containment Bldg. Cause Not Yet Identified.Frequency of Hot Particle Surveys for Check Valve Tent Increased + (15:14:41, 7 January 2025)
- ML17348A185 + (15:14:43, 7 January 2025)
- ML17348A183 + (15:14:43, 7 January 2025)
- L-90-126, Forwards, 1989 Annual Radiological Environ Operating Rept & State of Fl Radiological Surveillance of Florida Power & Light Co Turkey Point Site + (15:14:44, 7 January 2025)
- L-90-136, Responds to NRC Re Violations Noted in Insp Repts 50-250/89-53 & 50-251/89-53.Corrective Actions:Existing Administrative Procedures Revised & New Procedures Developed to Provide Detailed Mgt Controls + (15:14:46, 7 January 2025)
- L-90-135, Monthly Operating Repts for Mar 1990 for Turkey Point Units 3 & 4 + (15:14:48, 7 January 2025)
- L-90-134, Responds to Violations Noted in Insp Repts 50-250/90-04 & 50-251/90-04.Corrective Actions:Individuals Counseled Re Adherence to Clearance tag-out &/Or Tag Removal Procedures & Event Discussed W/Personnel During Shift Crew Meetings + (15:14:50, 7 January 2025)
- ML17348A176 + (15:14:51, 7 January 2025)
- ML17348A174 + (15:14:52, 7 January 2025)
- ML17348A175 + (15:14:52, 7 January 2025)