- ML17348B362 + (14:51:36, 7 January 2025)
- L-92-016, Responds to Violations Noted in Insp Repts 50-250/91-45 & 50-251/91-45.Corrective Actions:Parameters Used in Eagle 21 Portion of RPS Verified,Consolidation Matrix & Training Program Prepared + (14:51:37, 7 January 2025)
- ML17348B360 + (14:51:40, 7 January 2025)
- ML17348B358 + (14:51:41, 7 January 2025)
- ML17348B357 + (14:51:43, 7 January 2025)
- ML17348B356 + (14:51:44, 7 January 2025)
- L-92-012, Forwards ISI Summary Rept,Second Interval,Third Period, First Outage (1991) + (14:51:45, 7 January 2025)
- ML17348B353 + (14:51:47, 7 January 2025)
- L-91-267, Responds to Generic Ltr 91-11, Resolution of Generic Issues 48, LCOs for Class 1E Vital Buses & 49, Interlocks & LCOs for Class 1E Tie Breakers + (14:51:48, 7 January 2025)
- ML17348B351 + (14:51:52, 7 January 2025)
- ML17348B350 + (14:51:53, 7 January 2025)
- L-92-006, Cycle XIII Startup Rept + (14:52:00, 7 January 2025)
- IR 05000250/1991051 + (14:52:04, 7 January 2025)
- ML17348B346 + (14:52:06, 7 January 2025)
- ML17348B345 + (14:52:09, 7 January 2025)
- ML17348B344 + (14:52:10, 7 January 2025)
- ML17348B342 + (14:52:12, 7 January 2025)
- IR 05000250/1991035 + (14:52:13, 7 January 2025)
- ML17348B340 + (14:52:14, 7 January 2025)
- IR 05000250/1991042 + (14:52:15, 7 January 2025)
- IR 05000250/1991049 + (14:52:26, 7 January 2025)
- ML17348B336 + (14:52:28, 7 January 2025)
- L-92-009, Monthly Operating Repts for Dec 1991 for Turkey Point Units 3 & 4 + (14:52:29, 7 January 2025)
- ML17348B329 + (14:52:35, 7 January 2025)
- IR 05000250/1991046 + (14:52:58, 7 January 2025)
- ML17348B326 + (14:53:00, 7 January 2025)
- 05000251/LER-1991-007-02, :on 911210,completion of TS Required Shutdown Due to Failure of 4A Load Sequencer.Caused by Auto Test Output Card.Unit Shut Down on 911210 & Output Contact Card Replaced + (14:53:02, 7 January 2025)
- 05000250/LER-1991-011, :on 911011,Appendix R Safe Shutdown Analysis Design Inadequacy Identified Due to Failure to Recognize Potential for Spurious Actuation of Auxiliary Relay.Manual Action List in Safe Shutdown Analysis Revised + (14:53:04, 7 January 2025)
- ML17348B318 + (14:53:05, 7 January 2025)
- ML17348B320 + (14:53:05, 7 January 2025)
- L-91-349, Forwards Revised Relief Requests VR-2,VR-6,VR-9,VR-11,VR-12, VR-13,VR-14,VR-22 (Withdrawn) & New Relief Requests VR-29 Through VR-32 for Inservice Testing Program + (14:53:06, 7 January 2025)
- L-91-348, Forwards Listed Inservice Insp Repts,Per ASME Code,Section XI,(IWA-6230) + (14:53:11, 7 January 2025)
- ML17348B315 + (14:53:14, 7 January 2025)
- L-91-350, Forwards Most Recent Annual Financial Rept,Us Securities & Exchange Commission Form 10-K & Most Recent Quarterly Financial Rept,Form 10-Q.Internal Cash Flow Excluding Retained Earnings Rept Also Encl + (14:53:15, 7 January 2025)
- IR 05000250/1991037 + (14:53:17, 7 January 2025)
- IR 05000250/1991041 + (14:53:33, 7 January 2025)
- ML17348B309 + (14:53:34, 7 January 2025)
- L-91-336, Forwards Individual Plant Exams of External Events for Severe Accident Vulnerabilities,As Requested Per Generic Ltr 88-20,Suppl 4 + (14:53:35, 7 January 2025)
- ML17348B307 + (14:53:39, 7 January 2025)
- 05000250/LER-1991-012, :on 911007,delta-T Factor in Overpower Delta-T & Overtemp Delta-T Found Set at Design Value of 56.1 F Instead of TS Value.Caused by Procedure Error.Values Changed & Plant Procedures Developed + (14:53:43, 7 January 2025)
- ML17348B305 + (14:53:47, 7 January 2025)
- ML17348B303 + (14:53:49, 7 January 2025)
- TAC:M72176 + (14:53:49, 7 January 2025)
- L-91-316, Forwards Nonproprietary WCAP-12960 & Proprietary WCAP-12959, Structural Evaluation of Turkey Point,Units 3 & 4, Pressurizer Surge Lines,Considering Effects of Thermal Stratification, Per Response to NRC Bulletin 88-011 + (14:53:51, 7 January 2025)
- L-91-323, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/91-39 & 50-251/91-39.Corrective Actions:Tested Dropout Timing of 162/TDDO Relays on 910919.Procedure 0-PMR-005.10, HGA 162/TDDO Relay Calibr, Approved + (14:53:52, 7 January 2025)
- L-91-329, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-250/91-42 & 50-251/91-42.Corrective Actions:Reactor Power Was Reduced Below 90 Percent & Indicated Axial Flux Was Returned to within Target Band on 911018 + (14:53:54, 7 January 2025)
- L-91-322, Responds to Violations Noted in Insp Repts 50-250/91-35 & 50-251/91-35.Corrective Actions:Cited Document Packages Updated to Reflect Installed Configuration & Package Will Be Revised to Include Vendor Model Number Changes + (14:53:55, 7 January 2025)
- IR 05000250/1991038 + (14:53:57, 7 January 2025)
- ML17348B296 + (14:53:59, 7 January 2025)
- ML17348B294 + (14:54:01, 7 January 2025)
- ML17348B292 + (14:54:01, 7 January 2025)