Forwards Reactor Containment Bldg Integrated Leak Rate Test (ILRT) - 1991 Turkey Point,Unit 4,ILRT - Date of Test Completion:911020
ML17348B358
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 01/28/1992
From: Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17348B359 List:
References
L-92-21, NUDOCS 9202050095
Download: ML17348B358 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9202050095 DOC.DATE: 92/01/28 NOTARIZED:

NO FACIL:50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PLUNKETT,T.F.

Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

COPIES LTTR ENCL 1

1 RECIPIENT ID CODE/NAME PD2-2 'PD

SUBJECT:

Forwards "Reactor Containment Bldg Integrated Leak Rate Test (ILRT) 1991 Turkey Point, Unit 4,ILRT Date of Test Completion:911020."

DISTRIBUTION CODE:

R017D COPIES RECEIVED:LTR X ENCL

/ SIZE:

TITLE: OR Submittal:

Append J Containment Leak Rate Testing NOTES:P~ /~l~

RECIPIENT COPIES ID CODE/NAME LTTR ENCL PD2-2 LA 1

0 AULUCK,R 2

2 DOCKET g

05000251 R

D A

D D

INTERNAL: NRR/DST/SPLB 8D OGC/HDS3 RES/DE/SEB RES/DSR/RPSB EXTERNAL: NRC PDR 1

1 1

1 1

1 1

1 1

1 OS<.

EG FILE 01 ES TR7SAIB NSIC 1

0 1

1 1

1 1

1 D

NOTE TO ALL"RIDS" RECIPIENTS' D

PLEASE HELP US TO REDUCE WASIEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISIRlBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL 11

Cl 41 a

r at P

an~~

gw gpss<<y w~

5E f~~ <i

JAM 28 t992 L-92-21 10 CFR 50 Appendix J U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 Reactor Containment Building Inte rated Leak Rate Test Enclosed please find the summary technical report of the Reactor Containment Building Integrated Leak Rate Test for Turkey Point Unit 4 as required by 10 CFR 50, Appendix J.

Should there be any questions, please contact us.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/OIH enclosure cc:

Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector,

USNRC, Turkey Point Plant DQCg 05000251 50095 920128 PDR AD PDR P