Notice of Violation from Insp on 911028-1108.Violation Noted:Adequate Controls Not in Place During Exchange of Engineering Data Between Vendor & Licensee Personnel to Ensure Accurate Programmable Constants & Components
ML17348B344
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/02/1992
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17348B343 List:
References
50-250-91-45, 50-251-91-45, NUDOCS 9201280125
Download: ML17348B344 (2)


Text

ENCLOSURE 1

NOTICE'P VIOLATION r

.Florida Power and Light Company Docket Nos, 50-250, 50-251 Turkey Point, Units 3 and 4

License Nos.,DPR-31, DPR-41

'uring the Nuclear Regulatory Commission (NRC) inspection conducted on October 28 through November 8,

1991,- violations of NRC requirements were identified.

Zn accordance with the

>>General Statement of Policy and Procedure for NRC Enforcement Actions,>>.

10 CFR Part 2, Appendix C (1991), the violations are listed below:

A.

B ~

10 CFR Part 50'ppendix Bi Criterion ZIZZ Design Control,

. states in part, that design control measures shall provide for verifying or checking the adequacy of design,...be established for the identification and control of design interfaces and for coordination among participating organizations.

Florida Power and Light Company>s implementing Quality Znstruction, QZ 3-PTN-1, Design Control, requires that design control measures shall provide for verifying or checking the adequacy of

design, such as by performance of design
reviews, or by performance of a suitable testing program.

Contra~ to the above, adequate controls were not in place during the exchange of engineering data between the vendor and the Florida Power and. Light Company staff to insure that complete and accurate programmable constants and programmable components were installed.in the Eagle 21 system.

Between September 27 and October 5, 1991, the-licensee identified that the Eagle 21 portion of the Reactor Protection System (Tuning Constants, Resistance Temperature Device constants, and Scaling Factor) contained non>>plant specific settings that were not acceptable for proper operation of Overpower Delta T, and Overtemperature Delta T.

This is a Severity Level ZV violation (Supplement 1).

~

Technical Specification 2.2.1 requires reactor trip system instrumentation and interlock setpoints be set consistent with

~ the trip setpoint values shown in Table 2.2-1.

Zn TS Table 2 '

lg Overtemperature Delta T refers to Note 1, and Overpower

'Delta T refers to Note 3.

Table -2.2-1 Note 1 and Note 3, both define Delta T Subzero as the indicated Delta T at rated thermal power.

Contrary to the'bove, on October 7,

1991, the licensee identified that the design Delta T Subzero (56.1.degrees F) was being used in lieu of the indicated Delta T Subzero for computing the Overpower Delta T and Overtemperature Delta T

setpoints.

This is a Severity Level ZV violation (Supplement 1).

'9201280125 920102 PDR ADOCK 05000250 8

PDR

-Florida Power and Light Company Turkey Point, Units 3 and 4

Docket Nos. 50-250'0-251 Xicense Nos.

DPR-31~ DPR-41 Pursuant to the provisions'of 10 CPR 2 ~ 201@ Florida Power and Light Company is hereby required. to submit a written statement or explanation to the U.8.

Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, D.C. 20555, with a copy to the Regional Administrator@ Region IZ> and a copy to the NRC Resident Inspector, within'0 days of the date of the letter transmitting this Notice of Violation '(Notice).

This reply should be clearly marked as a <<Reply to a Notice of Violation<< and should include for each violation:

(1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been'taken and the results achieved<

(3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance willbe achieved.

Zf an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken.

Where good cause is shown~ consideration will be given to extending the response time.

FOR TEE NUCLEAR REGULATORY COMMISSION is A. Re es-, Director Division of Reactor Pro]sets Dated at Atlanta, Georgia this 2nd day of January, 1992