Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17348B399 + (14:50:48, 7 January 2025)
- IR 05000250/1992002 + (14:50:52, 7 January 2025)
- ML17348B396 + (14:50:54, 7 January 2025)
- L-92-035, Monthly Operating Repts for Jan 1992 for Turkey Point,Units 3 & 4 + (14:50:56, 7 January 2025)
- ML17348B390 + (14:50:59, 7 January 2025)
- ML17348B386 + (14:51:01, 7 January 2025)
- ML17348B389 + (14:51:01, 7 January 2025)
- ML17348B385 + (14:51:03, 7 January 2025)
- IR 05000250/1991050 + (14:51:17, 7 January 2025)
- ML17348B382 + (14:51:19, 7 January 2025)
- ML17348B381 + (14:51:20, 7 January 2025)
- TAC:M82480 + (14:51:21, 7 January 2025)
- ML17348B380 + (14:51:24, 7 January 2025)
- ML17348B378 + (14:51:25, 7 January 2025)
- ML17348B376 + (14:51:27, 7 January 2025)
- ML17348B371 + (14:51:28, 7 January 2025)
- ML17348B370 + (14:51:30, 7 January 2025)
- TAC:M81230 + (14:51:31, 7 January 2025)
- ML17348B368 + (14:51:33, 7 January 2025)
- ML17348B364 + (14:51:34, 7 January 2025)
- TAC:M81671 + (14:51:34, 7 January 2025)
- ML17348B362 + (14:51:36, 7 January 2025)
- L-92-016, Responds to Violations Noted in Insp Repts 50-250/91-45 & 50-251/91-45.Corrective Actions:Parameters Used in Eagle 21 Portion of RPS Verified,Consolidation Matrix & Training Program Prepared + (14:51:37, 7 January 2025)
- ML17348B360 + (14:51:40, 7 January 2025)
- ML17348B358 + (14:51:41, 7 January 2025)
- ML17348B357 + (14:51:43, 7 January 2025)
- ML17348B356 + (14:51:44, 7 January 2025)
- L-92-012, Forwards ISI Summary Rept,Second Interval,Third Period, First Outage (1991) + (14:51:45, 7 January 2025)
- ML17348B353 + (14:51:47, 7 January 2025)
- L-91-267, Responds to Generic Ltr 91-11, Resolution of Generic Issues 48, LCOs for Class 1E Vital Buses & 49, Interlocks & LCOs for Class 1E Tie Breakers + (14:51:48, 7 January 2025)
- ML17348B351 + (14:51:52, 7 January 2025)
- ML17348B350 + (14:51:53, 7 January 2025)
- L-92-006, Cycle XIII Startup Rept + (14:52:00, 7 January 2025)
- IR 05000250/1991051 + (14:52:04, 7 January 2025)
- ML17348B346 + (14:52:06, 7 January 2025)
- ML17348B345 + (14:52:09, 7 January 2025)
- ML17348B344 + (14:52:10, 7 January 2025)
- ML17348B342 + (14:52:12, 7 January 2025)
- IR 05000250/1991035 + (14:52:13, 7 January 2025)
- ML17348B340 + (14:52:14, 7 January 2025)
- IR 05000250/1991042 + (14:52:15, 7 January 2025)
- IR 05000250/1991049 + (14:52:26, 7 January 2025)
- ML17348B336 + (14:52:28, 7 January 2025)
- L-92-009, Monthly Operating Repts for Dec 1991 for Turkey Point Units 3 & 4 + (14:52:29, 7 January 2025)
- ML17348B329 + (14:52:35, 7 January 2025)
- IR 05000250/1991046 + (14:52:58, 7 January 2025)
- ML17348B326 + (14:53:00, 7 January 2025)
- 05000251/LER-1991-007-02, :on 911210,completion of TS Required Shutdown Due to Failure of 4A Load Sequencer.Caused by Auto Test Output Card.Unit Shut Down on 911210 & Output Contact Card Replaced + (14:53:02, 7 January 2025)
- 05000250/LER-1991-011, :on 911011,Appendix R Safe Shutdown Analysis Design Inadequacy Identified Due to Failure to Recognize Potential for Spurious Actuation of Auxiliary Relay.Manual Action List in Safe Shutdown Analysis Revised + (14:53:04, 7 January 2025)
- ML17348B318 + (14:53:05, 7 January 2025)
- ML17348B320 + (14:53:05, 7 January 2025)