Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17354A330 + (13:27:35, 7 January 2025)
- L-96-279, Forwards Results of Use of Revised ECCS Evaluation Models to Support Implementation of TS Amendments 191/185 + (13:27:37, 7 January 2025)
- 05000250/LER-1996-011-01, :on 961009,potential for Overpressurizing Post Accident Containment Vent Filter Housings Occurred.Caused by Improper Change Mgt.Monitoring Sys Operating Procedures Revised + (13:27:40, 7 January 2025)
- L-96-286, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves + (13:27:41, 7 January 2025)
- L-96-282, Informs That Several Plant Mods Have Been Completed to Support Thermal Power Uprate.Revised Descriptions in ERDS Data Point Library Encl + (13:27:42, 7 January 2025)
- TAC:M96715 + (13:27:44, 7 January 2025)
- ML17354A319 + (13:27:45, 7 January 2025)
- L-96-268, Forwards Response to NRC Bulletin 96-001, CR Insertion Problems + (13:27:46, 7 January 2025)
- ML17354A314 + (13:27:48, 7 January 2025)
- ML17354A312 + (13:27:49, 7 January 2025)
- ML17354A310 + (13:27:50, 7 January 2025)
- L-96-270, Forwards Response to GL 96-06, Assurance of Equipment Ooperability & Containment Integrity During Design Basis Accident Conditions + (13:27:51, 7 January 2025)
- 05000250/LER-1996-010-01, :on 960924,manual Reactor Shutdown Occurred. Caused by Failed Rod Control Sys Regulation Card in 2AC Power cabinet.2AC Power Cabinet DC Power Supplies,Cabling & Connectors Checked + (13:27:57, 7 January 2025)
- L-96-258, Forwards Response to GL 96-04, Boraflex Degradation in Spent Fuel Pool Storage Racks + (13:27:58, 7 January 2025)
- ML17354A304 + (13:28:01, 7 January 2025)
- TAC:M93994 + (13:28:02, 7 January 2025)
- ML17354A303 + (13:28:02, 7 January 2025)
- ML17354A301 + (13:28:04, 7 January 2025)
- L-96-266, Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4 + (13:28:05, 7 January 2025)
- ML17354A299 + (13:28:05, 7 January 2025)
- ML17354A297 + (13:28:07, 7 January 2025)
- L-96-262, Forwards Uprated COLR for Turkey Point Unit 3 + (13:28:08, 7 January 2025)
- ML17354A296 + (13:28:08, 7 January 2025)
- PNO-II-96-073A, on 961018,Hurricane Lili Update Made.Tropical Storm Warning Discontinued for Fl Keys & Bay.Region II Continues to Monitor Hurricane Lili & Resident Inspectors Onsite to Monitor Licensee Activities + (13:28:11, 7 January 2025)
- PNO-II-96-073, on 961018,Hurricane Lili Was Located in Vicinity of Plant.Licensee Has Completed Preparations for Hurricane.State of Fl Has Been Informed + (13:28:13, 7 January 2025)
- ML17354A290 + (13:28:14, 7 January 2025)
- ML17354A287 + (13:28:15, 7 January 2025)
- L-96-200, Application for Amend to Licenses DPR-31 & DPR-41 to Modify Plants Units 3 & 4 to Revise TS Allowing Deferral for One Cycle of Reactor Coolant Pump Flywheel Ultrasonic Exams Required by Reg Guide 1.14 + (13:28:16, 7 January 2025)
- ML17354A284 + (13:28:17, 7 January 2025)
- L-96-235, Forwards Util Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval, for Period from 941114 to 960407.Reload SE Summaries for Unit 3 Cycle 15,dtd 951013 & Unit 4 Cycle 16,dtd 960520 Also Provided + (13:28:18, 7 January 2025)
- ML17354A275 + (13:28:20, 7 January 2025)
- IR 05000250/1989053 + (13:28:21, 7 January 2025)
- ML17354A273 + (13:28:22, 7 January 2025)
- ML17354A272 + (13:28:23, 7 January 2025)
- IR 05000250/1989029 + (13:28:26, 7 January 2025)
- L-83-115, Responds to 830106,14 & 0218 Ltrs by Confirming Agreements of 830223 Meeting That Util Will Suppl Fire Protection Proposals to Reflect Recent Work Showing Addl Compliance W/App R Requirements.Suppls to Be Submitted by 830408 + (13:28:34, 7 January 2025)
- ML17354A256 + (13:28:39, 7 January 2025)
- ML17354A253 + (13:28:40, 7 January 2025)
- ML17354A252 + (13:28:41, 7 January 2025)
- ML17354A251 + (13:28:42, 7 January 2025)
- CNL-17-138, Plants Seventh Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (13:28:43, 7 January 2025)
- BSEP 17-0110, Seventh Six-Month Status Report in Response to June 6, 2013, Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (13:28:51, 7 January 2025)
- ML17354A249 + (13:28:51, 7 January 2025)
- ML17354A247 + (13:28:53, 7 January 2025)
- ML17354A245 + (13:28:54, 7 January 2025)
- ML17354A243 + (13:28:55, 7 January 2025)
- ML17354A244 + (13:28:55, 7 January 2025)
- ML17354A242 + (13:28:56, 7 January 2025)
- ML17354A241 + (13:28:56, 7 January 2025)
- ML17354A240 + (13:28:57, 7 January 2025)
- ML17354A238 + (13:28:58, 7 January 2025)