Discusses USI-46, Seismic Qualification of Equipment in Operating Plants, & Audit at Plant During Wk of 961204-08. SER Encl
ML17354A299
Person / Time
Site: Turkey Point, Saint Lucie  
Issue date: 10/22/1996
From: Hebdon F
NRC (Affiliation Not Assigned)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
Shared Package
ML17354A300 List:
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR GL-87-02, GL-87-2, TAC-M68303, TAC-M68304, TAC-M69483, NUDOCS 9610240200
Download: ML17354A299 (5)


Text

.t4'. T: F..olunke.tt President = Nuclear Division Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420 October 22 996

SUBJECT:

SUPPLEMENTAL SAFETY EVALUATION ON ST.

LUCIE UNIT 1, UNITS 3 AND 4, RESOLUTION OF UNRESOLVED SAFETY ISSU SUPPLEMENT NO.

1 TO GENERIC LETTER 87-02 (TAC NOS.

H68304)

Dear Hr. Plunkett:

AN URKEY POINT USI) A-46,

69483, H68303, By letter dated February 9,
1995, we notified you that we had found your scaled-back program was, in general, adequate to resolve the primary concern of USI A-46, "Seismic gualification of Equipment in Operating Plants."
However, several areas of concern were also identified which required our further evaluation.

To evaluate your USI A-46 program implementation and our areas of concern, we conducted an audit at the Turkey Point site and your Juno office during the week of December 4-8, 1995.

Based on the information reviewed during, the audit, we have concluded that you have implemented an adequate seismic'rogram to address our 'previous concerns and this issue is closed.

However, several items were identified during the audit which, although they were not significant enough to change our" overall conclusion about the acceptability of your program, require additional action.

Your staff agreed to take corrective actions regarding the specific findings identified during the audit and documented thedeficiencies in several Condition Reports.

These findings are described in the, enclosed Supplemental Safety Evaluation.

The corrective actions will be insp'ected by the NRC's resident inspectors at St.

Lucie Unit 1 and Turkey Point.

Finally, based on the results of the Turkey Point Units 3 and, 4 inspection, we have determined that a separate audit of St.

Lucie Unit 1 is not warranted.

This completes our actions on these TACs and TAC Nos.

H68303, H68304, and H69483 are considered closed.

~siooaoooo ssiooo PDR ADOCK 05000250 P

PDR Docket Nos. 50-335, 50-250"and 50-251

Enclosure:

As stated p(~ O063.

cc:

Supp.

Safety Evaluatio6

'incerely, iainal siqned by reaerick 2 Hebaon, Director Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Distribution Docket File

'UBLIC SVarga JZwolinski HAshar PYChen Document Name:

G:TURKEY TP68303.LTR Turkey Rdg.

St. Lucie Rdg.

ACRS THarris [TLH3]

OGC

  • see revious concurrence OFFICE PH:PDII-3 LA:PDI I-3 PH:PDII-D: PDI I-3 Re ionII NAME DATE COPY RCroteau

/O 96 Ye~s No FHebdon LWiens BCla ton b 996 96 n

F 96 es/No es No es No OFF ICIA ECORD COPY KLandis

/0 Z.

96 Yes o

~

~

~

I r

H

/

~

~

Florida Power and Light Company Page 1 of 2 cco Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature ill West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 Senior Resident Inspector St.

Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.

Hwy AlA Jensen

Beach, Florida 34957 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 J.

R.

Newman, Esquire
Morgan, Lewis E Bockius 1800 M Street, N.W.

Washington, DC 20036 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398

~

Robert J.

Hovey, Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Thomas R.L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Ft. Pierce, Florida 34982 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. J. Scarola Plant General Manager St. Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, Florida 34954-0128 Mr. Gary E. Hollinger Licensing Manager Turkey Point Nuclear Plant P.O.

Box 4332 Princeton, Florida 33032-4332 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Regional Administrator, RII U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. H.

N. Paduano, Manager Licensing 5 Special Programs Florida Power and Light Company P.O.

Box 14000 Juno

Beach, Florida 33408-0420.

J.

A. Stall Site Vice President St. Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, Florida 34954-0218

Page 2 of 2 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Senior Res'ident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission P.O.

Box 1448 Homestead, Florida 33090 Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Armando Vidal County Manager Metropolitan Dade County ill NW 1 Street, 29th Floor Hiami, Florida 33128 Hr. Kerry Landis U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323-0199 E. J.

Weinkam Licensing Manager St. Lucie Nuclear Plant P.O.

Box 128 Fort Pierce, Florida 34954-0128

4