FEB 14 190 Docket Nos. 50-250 and 50-251 Dr. Robert E. Uhrig, Yice President.
Advanced Systems, and Technology Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152
Dear Dr. Uhrig:
DISTRIBUTION Docket NRC PDR L PDR
,NSIC
-ORB¹1 Rdg DEisenhut OELD JMTaylor ELJor dan ACRS-10 DMcDonald CParrish HLeFave DNotley BFerguson RE:
Turkey Point Plant, Units 3 5 4 - 'Fire protection (Safe Shutdown Capability Your letter dated July 1, 1982, provided information to demonstrate by a combination of compliance and exemptions from the specific provisions of Appendix R, the objective of assuring safe shutdown capability in the event of a fire will be met for Turkey Point Units 3 and 4.
The subnittal proposed no modifications which constitute alternative oF dedi'cated shut-down capability.
Therefore, until staff action is completed relating to your exemption requests, no further actions by the staff will be taken relating to alternative or dedicated'hutdown capability.
We.will initiate our review of alternative or dedicated.
shutdown capability if the exemptdbh requests are denied and upon receipt of your proposals for this capabi>lity.
He have enclosed a Technical Evaluation Report (TER) from our consultants, Brookhaven National Laboratory, vihich sutmnarizes the result of our review-to date.. The TER identifies the. safe shutdown methods and'quipment to be used. at Turkey Point Units 3 and 4 in the event of a fire.
The TER also identifies areas of. concern where we believe your proposed safe shutdown methods or equipment in the evept of a fire deviate from Appendix R, Sections III.G.3 and III.L.
This TER is being provided for your information; In addition< the TER identifies potential problem areas which exist if your exemption requests are denied and alternative or dedicated shutdown capability is required."
,'. 8303020203 8302i4 PDR ADOCK 05000250
.F PDR
Enclosure:
As stated Sincerely, OPJQIKLXiSZC55 Daniel G. McDonald, project Manager Operating Rbactors Branch ¹1 Division of Licensing OFFICES SURNAME$
nage
~ o O o ~ o es e ~ o ~\\ ~ o s ~ ~ o ~ o ~ s ~
cc w/enclos re:
See nex 0
)
~ e ~ ~ ~ e e
~
~
DM DATE P
~ ~ ~ ~ ~ eso ~
se
~ so
~ ~ ~ ~ ~.
~
~ oo ~ eooooeooooooo NRC FORM 318 u0.80) NRCM 0240 02/ 0/83:dra 0 /
~ o ~ o eoooAo
~ oe
~ oes
~
~ ~ ~ e
~
~
OFF IClALR ECO R 0 COPY 83 USGPO: 1981~960
0 "h
S lk-I' P
Robert E. Uhrfg Florida Power and Light Company cc:
Harold F. Reis, Esquire Lowenstein, Newman, Reis and Axelrad 1025 Connecticut
- Avenue, N.W.
Suite 1214 Washington, D. C.
20036 Norman A. Coll, Esquire
- Steel, Hector and Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0.
Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304
'Administrator Department of Enbironmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station
'U. S. Nuclear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303