Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17354B172 + (13:08:46, 7 January 2025)
- TAC:M83687 + (13:08:47, 7 January 2025)
- ML17354B169 + (13:08:49, 7 January 2025)
- L-98-259, Submits Addl Info on Classification of Cb Roof for NRC Consideration in Granting 961212 Request for Exemption from Certain Requirements of 10CFR50,App R Re Fire Rating of Raceway Fire Barriers on Cb Roof + (13:08:50, 7 January 2025)
- L-98-255, Forwards Drawings (Figures A,B,C & D) Showing Fire Zones Included in 961212 & s Requesting Exemption Re Fire Rating of Raceway Fire Barriers in Outdoor Areas,Based on Discussions at 980914 Meeting + (13:08:55, 7 January 2025)
- ML17354B164 + (13:08:57, 7 January 2025)
- TAC:M98606 + (13:09:01, 7 January 2025)
- ML17354B160 + (13:09:03, 7 January 2025)
- ML17354B159 + (13:09:03, 7 January 2025)
- L-98-260, Forwards COLR for Turkey Point Unit 3 Cycle 17, Per TS 6.9.1.7 + (13:09:04, 7 January 2025)
- IR 05000250/1998099 + (13:09:07, 7 January 2025)
- ML17354B152 + (13:09:09, 7 January 2025)
- ML17354B151 + (13:09:16, 7 January 2025)
- IR 05000250/1998009 + (13:09:29, 7 January 2025)
- ML17354B148 + (13:09:31, 7 January 2025)
- IR 05000250/1998301 + (13:09:33, 7 January 2025)
- ML17354B143 + (13:09:34, 7 January 2025)
- ML17354B142 + (13:09:36, 7 January 2025)
- ML17354B141 + (13:09:37, 7 January 2025)
- 05000250/LER-1998-004-02, :on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With + (13:09:42, 7 January 2025)
- L-98-256, Submits SG Tube Plugging 15-day Rept,Per TS 4.4.5.5.a.Unit 3 SGs Inspected from 981005-08.One SG Tube Located in Row 42, Column 55 Plugged in SG 3B as Result of Insp + (13:09:43, 7 January 2025)
- L-98-262, Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With + (13:09:45, 7 January 2025)
- ML17354B128 + (13:09:50, 7 January 2025)
- L-98-246, Requests That Jt Butler Be Removed from Official Svc Lists for Turkey Point & St Lucie Plants + (13:09:51, 7 January 2025)
- IR 05000250/1998008 + (13:09:59, 7 January 2025)
- ML17354B124 + (13:10:01, 7 January 2025)
- TAC:M97422 + (13:10:02, 7 January 2025)
- ML17354B123 + (13:10:04, 7 January 2025)
- ML17354B122 + (13:10:05, 7 January 2025)
- L-98-240, Forwards Response to NRC 980716 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions + (13:10:06, 7 January 2025)
- ML17354B119 + (13:10:11, 7 January 2025)
- ML17354B117 + (13:10:14, 7 January 2025)
- PNO-II-98-042B, on 980925,update on Hurricane Georges Made. Initial Plant Walkdowns Identified No Significant Damage to Plant Equipment.Licensee No Longer Manning Their EOF for Hurricane Monitoring.Normal Security Patrols Restored + (13:10:16, 7 January 2025)
- PNO-II-98-042A, on 980925,update on Hurricane Georges Made. FP&L Remains in Unusual Event Due to Hurricane Warning for Area.Four Region II Inspectors Remain Onsite Monitoring Licensee Activities + (13:10:18, 7 January 2025)
- ML17354B114 + (13:10:19, 7 January 2025)
- ML17354B112 + (13:10:20, 7 January 2025)
- ML17354B113 + (13:10:20, 7 January 2025)
- ML17354B111 + (13:10:21, 7 January 2025)
- ML17354B109 + (13:10:23, 7 January 2025)
- ML17354B110 + (13:10:23, 7 January 2025)
- ML17354B107 + (13:10:25, 7 January 2025)
- ML17354B108 + (13:10:25, 7 January 2025)
- ML17354B106 + (13:10:26, 7 January 2025)
- ML17354B104 + (13:10:27, 7 January 2025)
- PNO-II-98-042, on 980924,licensee Prepared for Approach of Hurricane George & Implemented Procedures for Severe Weather Preparations.Local Officials Instituted Evacuation of Monroe County + (13:10:29, 7 January 2025)
- TAC:MA1470 + (13:10:31, 7 January 2025)
- ML17354B102 + (13:10:31, 7 January 2025)
- L-98-236, Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With + (13:10:33, 7 January 2025)
- ML17354B100 + (13:10:33, 7 January 2025)
- ML17354B097 + (13:10:43, 7 January 2025)
- TAC:MA0504 + (13:10:48, 7 January 2025)