Text
CATEGORY 2
REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9810300013
DOC.DATE: 98/09/22
NOTARIZED: NO
ACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
SO-2Sl Tuikey Point Plant, Unit 4, Florida Power and Light C
AUTH.NAME
AUTHOR AFFILIATXON
LANDXS,K.D.
Region
2
(Post
820201)
RECXP.NAME
RECIPIENT AFFILIATION
PLUNKETT,T.F.
Florida Power
& Light Co.
DOCKET I
05000250
050002S1
SUBJECT:
Forwards insp repts 50-250/98-09
&. 50-251/98-09
on 980727-31
&. 0810-14.No violations noted.
DISTRIBUTION CODE:
1E01F
COPIES
RECEIVED:LTR $ ENCL
(
SIZE: 3
7 2g
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD2-3
INTERNAL: AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DXR
RGN2
FILE
0 1
COPIES
LTTR ENCL
1
1.
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
JABBOUR,K
I
CENTE
PECB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
1
'
1
1
1
1
1
1
1
1
1
1
RNAL: LXTCO, BRYCE,J H
NRC PDR
1
1
1
1
NOAC
I
NUDOCS FULLTEXT
1
1
1
Lv"XEQ PHQa]
~jQg+llljljig p}~Q
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIST.
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
17
ENCL
17
4
September
22,
1998
Power
and Light Company
ATTN: Hr . T. F. Plunkett
President
- Nuclear Division
P.
O.
Box 14000
Juno Beach,
FL
33408-0420
SUBJECT:
NRC INSPECTION REPORT
NOS. 50-250/98-09
AND 50-251/98-09
Dear
Nr . Plunkett:
An NRC'inspection
was conducted July 27 - 31,
and August
10 - 14,
1998, at
your Turkey Point Units 3 and 4 reactor tacilities.
This was
a Safety System
Engineering Inspection
(SSEI).
The primary objective of this SSEI was to
determine if the Auxiliary Feedwater
(AFW) System was designed,
operated,
and
maintained consistent with the design
and licensing bases.
Overall, the inspection determined that the
AFW system
was designed,
operated
and maintained consistent with the design
and licensing bases.
The
calculations to support
system performance,
although considered
numerous,
were
adequate.
The team found that modifications to the system met design
and
licensing basis
requirements
and no unreviewed safety questions
had been
introduced.
The team found that the quality of the later plant modification
pa'ckages
had improved over ear lier packages.
Your pre-inspection. self
assessment
on the system
was very thorough
and is considered
a strength.
In
addition, the team also considered
the detail of the design basis
documentation to be
a strength.
The team also found that your corrective
actions for AFW system related
problems were applied in, an effective'manner.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this l'etter and its enclosures will be placed in the
NRC Public Document
Room.
Sincerely,
Original signed
by.
Kerry D. Landis
Kerry D. Landis, Chief
Engineering
Branch
Division of Reactor
Safety
Docket Nos. 50-250,
50-251
License
Nos.
Enclosure:
NRC Inspection Report
~
cc w/encl:
(See
page 2)
pop
9810300013
980922
ADOCK 05000250
Q
~
~
4
FPII L
cc w/encl:
Plant General
Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760
SW 344th Street
Florida City. FL
33035
R. J.
Hovey
Site Vice President
Turkey Point Nuclear
Plant
Florida Power and Light Company
9760
SW 344th Street
Florida City, FL
33035
G.
E. Hollinger
Licensing Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760
SW 344th Street
Florida City,
FL
33035
John Gianfrancesco,
Manager
Administrative Support
5 Special
Projects
Florida Power 5 Light Company
P.
0
Box 14000
Juno Beach,
FL
33408-0420
Rajiv S. Kundalkar
Vice President
- Nuclear Engineering
Florida Power
8 Light Company
P. 0.
Box 14000
Juno Beach.
FL
33408-0420
M. S.
Ross, Attorney
Florida Power
& Light
P. 0.
Box 14000
Juno Beach,
FL
33408-0420
John T. Butler,
Esq.
Steel,
Hector and Davis
4000 Southeast
Financial
Center
Miami, FL
33131-2398
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee.
FL
32304
(cc w/encl cont'd
-See
page 3)
FPInL
(cc wiencl cont'd)
William A. Passetti
Bureau of Radiation Control
Department of Health and
Rehabi 1itatiye Services
2020 Capital Circle SE,
Bin gC21
Tallahassee,
FL
32399-1741
County Manager
Metropolitan Dade County
. 111
NW 1st'Street,
29th Floor
Miami,
FL
33128
Joe Myers, Director
.
Division of Emergency
Preparedness
Department of Community Affairs
21740 Centerview Drive
Tallahassee,
FL
32399-2100
Distributi on wlencl:
L. Plisco.
RII
J.
Lieberman,
B.
Summers,
OE (2)
K. Jabbour.
G. Hopper,
RII
PUBLIC
Senior
Resident
Inspector
U. S. Nuclear Regulatory Commission
P. 0.
Box 1448
Homestead,
FL
33090
/3 Alc~
OFFTCE
8 lONATURE
DATE
Rl l:DRS
,n~
KKerrlMeothertpd
8/ ~
/98
Rl 1:DRS
RKoore
8/
/98
Rll:DR
KLandi
Rl1:DRP
LMert
/98
8/ '98
8/
/9&
ES'O
OFF
RECORD
COPY
YES
NO
S
NO
YES
NO
KAKE:
S:U)RS~EBXTPT9809D.NXK
KO
YES
NO
YES
NO
0