CATEGORY 2
REGULATORY XNFORMATION DZSTRIBUTION SYSTEM {RIDS)
ACCESSION NBR:9810300158
DOC DATE: 98/10/01
NOTARIZED: NO
FACIL:50-250 Turkey Point Plant,'Unit 3, Florida Power and Light C
50-251 Turkey Point Plant, Unit 4, Florida Power and Light C
AUTH.NAME
AUTHOR AFFILXAT1ON
REYES,L.A.
Region
2 {Post 820201)
RECIP . NAME
RECIPIENT AFFILIATION
PLUNKETT,T.F.
Florida Power
E Light Co.
DOCKET
0'5000250
05000251
SUBJECT:
Forwards
SALP repts 50-250/98-99
& 50-251/98-99 for period
of 960818-980822.Repts will be discussed
at 981022 meeting.
Safety performance
continued to be assessed
as superior in
all SALP functional areas for third consecutive
SALP period.
DISTRIBUTION CODE: IE40D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: Systematic
Assessment
of Licensee
Performance
{SALP) Report
NOTES:
G
RECIPIENT
ZD CODE/NAME
PD2-3 LA
JABBOUR,K
INTERNAL-
COMMISSION .
CENT
NUDOCS -ABSTRACT
OGC/HDS3
EXTERNAL: L ST LOBBY WARD
NOAC
COPXES
LTTR ENCL
1
1
1
1'"
5
5
1
1
1
1
1
1
1
1,
1
1
1
1
. RECIPIENT
ID CODE/NAME
PD2-3
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERH
OE DIR
RGN2
FILE
01
LXTCO BRYCE,J H
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROl
DESK
(DCD)
ON EXTENSION 415-2082
TOTAL NUMBER OF COPIES
REQUIRED.
LTTR
21
ENCL
21
October 1,
1998
Florida Power and Light Company
ATTN:
Mr. T. F. Plunkett
President
- Nuclear Division
P.
O.
Box 14000
Juno Beach,
FL
33408-0420
.SUBJECT:
SYSTEMATIC ASSESSMENT
OF LICENSEE
PERFORMANCE
(NRC INSPECTION REPORT NOS.'50-250/98-99
AND 50-251/98-99)
Dear Mr. Plunkett:
The Nuclear Regulatory
Commission
(NRC) Systematic
Assessment
of Licensee
Performance
(SALP) has
been completed for your Turkey Point Nuclear
Plant.
The facility was assessed f'r the period of August 18,
1996, through
August 22,
1998.
The results of the assessment
are documented
in the enclosed
SALP report.
This report will be discussed
with you at
a public meeting to be
held at the Turkey Point site, on October 22,
1998,. at 1:30 p.m.
(EDT).
The SALP Board members
evaluated your performance in four functional areas:
Plant Operations,
Maintenance.
Engineering
and Plant Support.
The safety
performance at your Turkey Point plant continued to be assessed
as superior in
all SALP functional areas
for the third consecutive
SALP period.
Contributors
to this performance
were your conservative
decisions relative to the
- probability of risk in the plant's operation.
selt-assessment
and quality
assurance
processes
effective in identifying and resolving problems,
and your
effective use of lessons
learned to prevent repetitive problems.
The SALP Board members
noted plant operational
performance
ear ly in the
SAI P
period that was not at the superior level;
however
. Operations
Management
reversed the negative trend,
and you were effective in changing the
performance level to superior for the last twelve months of the period.
In accordance with Section 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosure will be placed in the
NRC Public Document
Room.
eaaoaooS5S
ea<00S
ADQCK 05000250
8
~
~
FP8L
Sincerely,
( Origina3. signed by L. Heyes
) .
2
'o reply"to this letter is required;
however,"should you have any questions
or
comments,
I would be'pleased
to discuss
them with you.
I look forward to
discussing this assessment
wi'th you on October 22,
1998.
Docket Nos. 50-250,
50-251
License
Nos.
Enclosure:
SAI P Report
cc w/encl:
(See
page 3)
Luis A. Reyes
Regional Administrator
FPKL
cc w/encl:
Plant General
Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760
SW 344th Street
Florida City.
FL
33035
R. J.
Hovey
Site Vice President
Turkey Point Nuclear Plant
Florida Power and Light Company
9760'SW 344th Street
Florida City,
FL
33035
G.
E. Hollinger
Licensing Manager
Turkey Point Nuclear
Plant
Florida Power and Light Company
9760
SW 344th Street
Florida City, FL
33035
John Gianfrancesco,
Manager
Administrative Support
8 Special
Projects
Florida Power 5 Light Company
P. 0.
Box 14000
Juno Beach,
FL
33408-0420
Rajiv S.-Kundalkar
Vice President
- Nuclear Engineering
Florida Power
8 Light Company
P. 0.
Box 14000
Juno Beach,
FL
33408-0420
M. S.
Ross. Attorney
Florida Power
& Light
'. 0.
Box 14000
Juno Beach.
FL
33408-0420
John T. Butler,
Esq.
Steel,
Hector and Davis
4000 Southeast
Financial
Center
Miami, FL
33131-2398
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
FL
32304
William A. Passetti
Bureau of, Radiation Control
Department of Health and
Rehabilitative Services
2020 Capital Circle SE,
Bin I:21
Tallahassee.
FL
32399-1741
I
County Mana'ger
Metropolitan Dade County
111
NW 1st Street.
29th Floor
Miami. FL
33128
Joe Myers, Director
Division of Emergency
Preparedness
Department of Community Affairs
21740 Centerview Drive
Tallahassee.
FL
32399-2100