Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:MA1900 + (13:00:33, 7 January 2025)
- ML17355A427 + (13:00:36, 7 January 2025)
- L-99-197, Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 + (13:00:37, 7 January 2025)
- TAC:MA6249 + (13:00:39, 7 January 2025)
- ML17355A422 + (13:00:41, 7 January 2025)
- PNO-II-99-037C, on 990914,Hurricane Floyd Was Located Approx 200 Miles east-southeast of St Lucie Nuclear Plant & with Ctr Estimated Near Latitude 26.5 North & Longitude 77.4 West.Storm Moving Northwest at 12 Mph + (13:00:43, 7 January 2025)
- PNO-II-99-037B, on 990914,Hurricane Floyd Was Located Approx 200 Miles east-southeast of St Lucie Nuclear Plant & with Ctr Estimated Near Latitude 26.0 North & Longitude 77.0 West.Licensee Continuing to Monitor Progress of Hurricane + (13:00:45, 7 January 2025)
- PNO-II-99-037A, on 990914,preparations for Hurricane Floyd Were Made.Fp&L Is Continuing to Prepare for Approach of Hurricane,Including Implementation of Procedures for Severe Weather Preparations.Nrc Entered Monitoring Mode + (13:00:47, 7 January 2025)
- PNO-II-99-037, on 990914,Hurricane Floyd Was Located Approx 255 Miles Due East of Turkey Point Nuclear Plant & with Ctr Estimated Near Latitude 25.4 North & Longitude 76.2 West. FEMA Region IV Regional Operations Ctr Fully Activated + (13:00:56, 7 January 2025)
- ML17355A415 + (13:00:58, 7 January 2025)
- L-99-198, Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 + (13:00:59, 7 January 2025)
- L-99-187, Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC + (13:01:01, 7 January 2025)
- L-99-202, Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With + (13:01:03, 7 January 2025)
- L-99-196, Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 + (13:01:05, 7 January 2025)
- IR 05000250/1999004 + (13:01:09, 7 January 2025)
- ML17355A408 + (13:01:11, 7 January 2025)
- L-99-174, Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity + (13:01:12, 7 January 2025)
- L-99-178, Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included + (13:01:14, 7 January 2025)
- ML17355A405 + (13:01:16, 7 January 2025)
- ML17355A404 + (13:01:17, 7 January 2025)
- L-99-173, Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance + (13:01:18, 7 January 2025)
- TAC:M96878 + (13:01:20, 7 January 2025)
- ML17355A399 + (13:01:21, 7 January 2025)
- L-99-179, Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With + (13:01:22, 7 January 2025)
- ML17355A397 + (13:01:24, 7 January 2025)
- L-99-172, Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 + (13:01:25, 7 January 2025)
- ML17355A392 + (13:01:27, 7 January 2025)
- L-99-162, Application for Amend to License DPR-31,modifying TSs 3.8.1.1,3.4.3 & 3.5.2 to Extend AOT for Inoperable EDG from 72 Hours to 7 Days on one-time Basis + (13:01:31, 7 January 2025)
- 05000250/LER-1999-001-02, :on 990623,manual RT from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With + (13:01:33, 7 January 2025)
- L-99-165, Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants + (13:01:34, 7 January 2025)
- L-99-163, Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With + (13:01:38, 7 January 2025)
- ML17355A380 + (13:01:41, 7 January 2025)
- ML17355A378 + (13:01:42, 7 January 2025)
- IR 05000250/1999003 + (13:01:54, 7 January 2025)
- ML17355A374 + (13:01:56, 7 January 2025)
- ML17355A373 + (13:01:58, 7 January 2025)
- ML17355A372 + (13:01:59, 7 January 2025)
- ML17355A368 + (13:02:02, 7 January 2025)
- ML17355A361 + (13:02:05, 7 January 2025)
- L-99-117, Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions + (13:02:25, 7 January 2025)
- TAC:M402029 + (13:02:27, 7 January 2025)
- ML17355A347 + (13:02:29, 7 January 2025)
- L-99-115, Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley + (13:02:30, 7 January 2025)
- IR 05000250/1999002 + (13:02:46, 7 January 2025)
- ML17355A341 + (13:02:47, 7 January 2025)
- ML17355A335 + (13:02:48, 7 January 2025)
- ML17355A334 + (13:02:49, 7 January 2025)
- ML17355A332 + (13:02:53, 7 January 2025)
- ML17355A331 + (13:02:54, 7 January 2025)
- ML17355A329 + (13:02:57, 7 January 2025)
- ML17355A322 + (13:03:01, 7 January 2025)