Forwards Audit Rept on Y2K Contingency Planning Program for Plant Conducted on 990518-20,as follow-up to NRC GL 98-01
ML17355A378
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/12/1999
From: Jabbour K
NRC (Affiliation Not Assigned)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
Shared Package
ML17355A379 List:
References
GL-98-01, GL-98-1, TAC-MA1900, TAC-MA1901, NUDOCS 9907150063
Download: ML17355A378 (5)


Text

Mr. Thomas F. Plunkett President, Nuclear Division Florida Power & Light Company 700 Universe Boulevard P.O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

AUDITREPORT ON THE YEAR 2000 CONTINGENCY PLANNING PROGRAM, TURKEY POINT PLANT, U'UIITS 3 AND 4 (TAC NOS. MA1900 AND MA1901)

Dear Mr. Plunkett:

On May 18-20, 1999, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an audit of the Year 2000 (Y2K) contingency planning program at the Turkey Point Plant, Units 3 and 4, as a followup to NRC Generic Letter 98-01, 'Year 2000 Readiness of Computer Systems at Nuclear Power Plants," issued on May 11, 1998., The enclosed report presents the results of the audit. The results of this audit and subsequent audits at other selected nuclear power plants willbe used by the staff to determine the need for additional action, if any, on Y2K readiness for nuclear power plants.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure willbe placed in the NRC Public Document Room. Please contact me at 301-415-1496 if you have any questions or comments on the enclosed audit report.

Sincerely, Docket Nos. 50-250, 50-251

Enclosure:

As stated cc w/encl: See next page original signed by:

Kahtan N. Jabbour, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation DISTRIBUTION:

Docket File

~ PUBLIC Turkey R/F BClayton KJabbour S Peterson MWaterman BMarcus OGC ACRS LWert, Rll 9907$.50063 990712 PDR ADOCK 05000250 P

PDR DOCUMENT NAME: GAPDII-2iTURKEYttFINALTPA.WPD

~II,Py eSI7R CfIII'o receive a co of this document. indicate in the box:

C

~ Cop without attachment/enclosure "E" ~ Co with attachment/enclosure "N

~ No co OFFICE NAME PDII-2tPM PDII-ALA KJabbour c

BCla one~

PDII-2ts SPeterso DATE 07/$/99 07/8/99 07/P$ 9 OFFICIAL RECORD COPY 07/ /99 07/ /99

t 4

t

e@~ REGS

~4

~o

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 Ouly 12, 1999 Mr. Thomas F. Plunkett President, Nuclear Division Florida Power 8 Light Company 700 Universe Boulevard P.O.'ox 14000 Juno Beach, FL 33408-0420

SUBJECT:

AUDITREPORT ON THE YEAR 2000 CONTINGENCY PLANNING PROGRAM, TURKEY POINT PLANT, UNITS 3 AND 4 (TAC NOS. MA1900 AND MA1901)

Dear Mr. Plunkett:

On May 18-20, 1999, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an audit of the Year 2000 (Y2K) contingency planning program at the Turkey Point Plant, Units 3 and 4, as a foilowup to.NRC Generic'Letter 98-01, 'Year 2000 Readiness of Computer Systems at Nuclear Power Plants," issued on May 11, 1998.. The enclosed report presents the results of the audit. The results of this,audit and subsequent audits at other selected nuclear power plants willbe used by the staff to determine the need for additional action, ifany, on Y2K readiness for nuclear power plants.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure willbe placed in the'NRC Public Document Room.

Please contact me at 301-415-1496 if you have any questions or comments on the enclosed audit report.

Sincerely, J

Kahtan N. Jabbour, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.'50-250, 50-251

Enclosure:

As stated cc w/encl: See next page

Mr. T. F. Plunkett Florida Power and Light Company C

TURKEYPOINT PLANT CC:

M. S. Ross, Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Robert J. Hovey, Site Vice, President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 County Manager Miami-Dade County 111 NW 1 Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 1448 Homestead, Florida 33090 Mr. WilliamA. Passetti, Chief Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin ¹C21 Tallahassee, Florida 32399-1741 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Attorney General Department of Legal Affairs, The Capitol Tallahassee, Florida 32304 Plant Manager

, Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035 Mr. Steve Franzone Licensing Manager Turkey Point Nuclear Plant 9760 SW. 344th Street Florida City, FL 33035 Mr. John Gianfrancesco Manager, Administrative Support and Special Projects P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President-Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420