Text
CATEGORY 2
REGULATORY INFORMATION DZSTRXBUTXON SYSTEM (RIDS)
ACCESSION NBR:9908310323
DOC.DATE- 99/08/23
NOTARIZED: NO
DOCKET ¹ .
PACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C
05000250
50-251 Turkey Point Plant, Unit 4, Plorida Power and Light C
05000251
AUTH.NAME
AUTHOR APPILIATION
BOLAND,A.T.
Region
2
(Post
820201)
RECZP.NAME
RECXPIENT APPZLIATION
PLUNKETT,T.P.
Plorida Power 6 Light Co.
SUBJECT:
Porwards insp repts 50-250/99-04
&, 50-251/99-04
on
990613-0724.Two violations occurred
6 being treated
as
DISTRIBUTION CODE: IEOIP
COPIES
RECEIVED:LTR J
ENCL g
SIZE:
TITLE: General
(50 Dkt)-Znsp Rept/Notice of Violation Response
NOTES:
NCV.
E
RECIPIENT
ID CODE/NAME
LPD2-2
INTBRNRL: REODl~C
ILE CENTER
" DZPM/OKHP
NUDOCS-ABSTRACT
OGC/RP
EXTERNAL: LMITCO MARSHALL
NRC PDR
COPXES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPXENT
~
1D CODE/NAME
JABBOUR,K
DEDRO
NRR/DIPM/IXPB
NRR/DRXP/REXB
RGN2
PILE
01
NOAC
NUDOCS PULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
D
LOADED FaOWN
ELaeraOZ~t: ~t.e
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE TliE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
August 23, 1999
EA 99-147
Florida Power and Light Company
ATTN:
Mr. T. F. Plunkett
President - Nuclear Division
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT:
NRC INTEGRATED'INSPECTION REPORT NOS. 50-250/99-04, 50-251/99-04
Dear Mr. Plunkett:
This refers to the inspection conducted on June 13,through July 24, 1999, at the Turkey Point 3
and 4 reactor facilities. The enclosed report presents the results of that inspection.
During the inspection period, your conduct of activities was generally characterized by safety
conscious operations.
Operator response and recovery from a control rod power supply failure
were excellent.
Quality assurance
audits were balanced and thorough.
Based on the results of the inspection, the NRC has determined that two violations of NRC
requirements occurred.
These violations are being treated as nonsked violations (NCVj,
consistent with Appendix C ofthe Enforcement Policy.. The NCVs are described in'the subject
inspection report. Ifyou contest the violation or severity level of these NCVs, you should
provide a response within 30 days of the date of this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATMDocument Control Desk, Washington DC
20555-0001, with copies to the Regional Administrator, Region II, the Resident Inspector at your
facility, and the Director, Office of Enforcement, United States Nuclear Regulatory Commission,
Washington DC 20555-0001.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure willbe placed in the NRC Public Document Room.
Sincerely,
( Original signed by A. Eoland
)
Anne T. Boland, Acting Chief
Reactor Projects Branch 3
Division of Reactor Projects
Docket Nos. 50-250, 50-251
Enclosure: Inspection Report Nos. 50-250/99-04, 50-251/99-04
cc w/encl: (See page 2)
9'Ii08310323 990823
ADQCK 05000250
8
cc w encl:
Plant General Manager*
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
R. J. Hovey
Site Vice President
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
Steve Franzone*
Licensing Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
9760 SW 344th Street
Florida City, FL 33035
Joh
ianfrancesco, Manager
A
rative Support & Special Projects
Fl
ower & Light Company
P. O. Box 14000
Juno Beach, FL 33408-0420
Rajiv S. Kundalkar
Vice President - Nuclear Engineering
Florida Power & Light Company
P. O. Box 14000
Juno Beach, FL 33408-0420
M. S, Ross, Attorney"
Florida Power & Light
P. O. Box 14000
Juno Beach, FL 33408-0420
Attorney General
Department of Legal Affairs
The Capitol
Tallahassee,
FL 32304
WilliamA. Passetti*
Bureau of Radiation Control
Department of Health and
Rehabilitative Services
2020 Capital Circle SE, Bin ¹C21
Tallahassee,
FL 32399-1741
County Manager
Metropolitan Dade County
111 NW 1st Street, 29th Floor
Miami, FL 33128
Joe Myers, Director*
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL 32399-2100
- Electronic Distribution Only
0
Distribution w/encl
L. Plisco, Rll
K. Jabbour, NRR
R. Borchadt, OE
B. Summers, OE (2)
G. Hopper, Rll
PUBLIC
Senior Resident Inspector
U. S. Nuclear Regulatory Commission
9762 Southwest 344~ Street
Florida City, FL 33035
- (See previous concurrence)
OFFICE
SIGNATURE
NAME
DATE
COPY7
RI:DRP
r
basal
/
/
HO
RI I:DRP
Cpatterson
/
/
YES
NO
II
rey s
/qQ /
YES
HO
RI I:DRP
Ssanc
ez
/
/
YES
HO
II
S
L
yes
YES
HO
RI I:D
KLa
>s
/
/
YES
NO
RI I:EICS
SSpar
s
/
/
YES
NO
OFFI
L RECORD
COPY
DOCUMENT NAME:
I:iRPB3iTURKEYPTiREPOR
.wpd
AUG-19-1999
15: 57
CRYSTAL RIVER RI OFFICE
352 795 7664
P.82
Distribution w/encl
L Pllsco, Rll
K. Jabbour, NRR
R. Borchadt, OE
B. Summers, OE (2)
G. Hopper, Rll
PUBLIC
Senior Resident Inspector
U. S. Nuclear Regulatory Commission
9762 Southwest 344'treet
Florida City, FL 33035
OFFICE
SZGRLTU
RII:DRP
RII:PRP
RS
RII=DRS
RII:EXCS
Scudisai1
Cput
xso
Rrayas
Ss
ax
OPPICZAL RECO
PY
P: XMKZLX9904.wpd