Forwards Insp Repts 50-250/99-03 & 50-251/99-03 on 990502-0612.One Violation of NRC Requirements Occurred & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy
ML17355A374
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/02/1999
From: Wert L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
Shared Package
ML17355A375 List:
References
50-250-99-03, 50-250-99-3, 50-251-99-03, 50-251-99-3, NUDOCS 9907150053
Download: ML17355A374 (4)


See also: IR 05000250/1999003

Text

July 2,

1999

Florida Power and Light Company

ATTN:

Mr. T. F. Plunkett

President - Nuclear Division

P. O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-250/99-03, 50-251/99-03

Dear Mr. Plunkett:

This refers to the inspection conducted on May 2 through June 12, 1999, at the Turkey Point 3

and 4 reactor facilities. The enclosed report presents the results of this inspection.

During the inspection period, your conduct of activities was generally characterized

by safety

conscious operations.

Maintenance activities were well supported and maintenance

rule reports

were detailed.

Preparations forthe hurricane season were thorough.

Based on the results of the inspection, the NRC has determined that one violation of NRC

requirements occurred.

This violation is being treated as a Non-Cited Violation (NCV),

consistent with Appendix C of the Enforcement Policy. The NCV is described in the inspection

report. Ifyou contest the violation or severity level of the NCV, you should provide a response

within 30 days ofthe date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

copies to the Regional Administrator, Region II, the Resident Inspector at your facility and the

Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington DC

20555-0001.

In accordance with 10'CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure willbe placed in the NRC Public Document Room (PDR).

Sincerely,

( Original signed by L. Wert

)

-'-canard

D. Wert, Chief

Reactor Projects Branch 3

Division of Reactor Projects

Docket Nos. 50-250, 50-251

License Nos. DPR-31, DPRQ1

Enclosure: Inspection Report No. 50-250/99-03, 50-251/99-03

cc w/encl: (See page 2)

'F907i 50053 99'0702

PDR

ADOCK 05000250

6

PGR

%Ed'

0

FPL

cc w/encl:

Plant General Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

9760 SW 344th Street

Florida City, FL 33035

R. J. Hovey

Site Vice President

Turkey Point Nuclear Plant

Florida Power and Light Company

9760 SW 344th Street

Florida City, FL 33035

Steve Franzone

Licensing Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

9760 SW 344th Street

Florida City, FL 33035

John Gianfrancesco,

Manager

Administrative Support 8 Special Projects

Florida Power 8 Light Company

P. O. Box 14000

Juno Beach, FL 33408-0420

Rajiv S. Kundalkar

Vice President - Nuclear Engineering

Florida Power 8 Light Company

P. O. Box 14000

Juno Beach, FL 33408-0420

M. S. Ross, Attorney

Florida Power 8 Light

P. O. Box 14000

Juno Beach, FL 33408-0420

William A. Passetti

Bureau of Radiation Control

Department of Health and

Rehabilitative Services

'020 Capital Circle SE, Bin ¹C21

Tallahassee,

FL 32399-1741

County Manager

Metropolitan Dade County

111 NW 1st Street, 29th Floor

Miami, FL 33128

Joe Myers, Director

Division of Emergency Preparedness

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL 32399-2100

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee,

FL 32304

0

FPL

Distribution w/encl:

L. Plisco, Rll

L. Wert, Rll

K. Jabbour, NRR

S. Rudisail, Rll

G. Hopper, Rll

PUBLIC

Senior Resident Inspector

U. S. Nuclear Regulatory Commission

9762 Southwest 344~ Street

Florida City, FL 33035

S G ATUR

NAME

DATE

r disa l

/99

Cpatterson

I I /99

Rreyes

6 Q/99

landis

6I

/9

Lha

6/

/99

6I

/99

6/

/99

COPY'

E

N

YE

Y S

Es

No

YES

No

OF

IALRECORD

DOCUMENTN: GATURKEYP

ORTSLlr-99-03.wpd