Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HNP-96-168, Responds to NRC Re Violations Noted in Insp Rept 50-400/96-06.Corrective Actions:Completed 10CFR50.59 Safety Evaluation Without Interlocks,Placed Clearance Tags on CCW Pump Breakers & Revised OP-145, Component Cooling Water + (11:12:52, 7 January 2025)
- ML18012A389 + (11:12:54, 7 January 2025)
- ML18012A386 + (11:12:55, 7 January 2025)
- ML18012A384 + (11:12:56, 7 January 2025)
- 05000400/LER-1996-010-02, :on 960628,identified Surveillance Testing Deficiencies That Caused Past Entries Into TS 3.0.3.Caused by Personnel Error.Surveillance Test Procedures OST-1008 & OST-1092 Revised + (11:12:58, 7 January 2025)
- HNP-96-156, Informs NRC That Schedule Change for Util Conversion to Improved Std TS for Plant Has Changed to Oct 1997 + (11:12:58, 7 January 2025)
- NL-18-0033, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis + (11:13:00, 7 January 2025)
- ML18012A378 + (11:13:02, 7 January 2025)
- ML18012A377 + (11:13:05, 7 January 2025)
- ML18012A375 + (11:13:06, 7 January 2025)
- ML18012A372 + (11:13:08, 7 January 2025)
- HNP-96-143, Application for Amend to License NPF-63,requesting Change in Diesel Fuel Oil Sys Pressure Testing + (11:13:09, 7 January 2025)
- HNP-96-161, Requests Removal of JW Dohanue & B Clark from NRC Service/ Distribution List for Correspondence Containing Safeguards Info.Both Should Remain on Service/Distribution Lists for All Other Correspondence + (11:13:11, 7 January 2025)
- ML18012A364 + (11:13:13, 7 January 2025)
- HNP-96-153, Forwards Rev 2 to Harris Unit 1 Cycle 7 COLR, Incorporating Requirements of TS 3.3.3.2 Re Movable Incore Detectors,Relocated from TS Amend 65 to Facility Operating Licensed by NRC on 960724 + (11:13:14, 7 January 2025)
- NMP2L2664, Supplemental Information No. 2 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 + (11:13:15, 7 January 2025)
- HNP-96-151, Monthly Operating Rept for Aug 1996 for Shearon Harris Nuclear Power Plant + (11:13:16, 7 January 2025)
- ML18012A359 + (11:13:19, 7 January 2025)
- 05000400/LER-1996-016, :on 960814,reactor Trip Bypass Breaker Surveillance Test,Required by TSs Not Performed.Caused by Inadequate Procedures Not Ensuring Testing Done Prior to Placing Them in Svc.Procedures Revised + (11:13:20, 7 January 2025)
- 05000400/LER-1996-015, :on 960812,partial ESF Actuation of Main Steam Isolation Signal Occurred During Surveillance Testing Due to Operator Error.Sta Counseled + (11:13:22, 7 January 2025)
- HNP-96-106, Requests Approval for Plant to Use Alternative to ASME Boiler & Pressure Vessel Code Requirements for Performing Certain Pressure Testing on Containment Penetration Piping + (11:13:23, 7 January 2025)
- 05000400/LER-1996-014, :on 891127,identified Condition of Two Charging/Safety Injection Pumps Connected to Same Emergency Electrical Bus.Caused by Failure to Follow Operating Procedures.Racked Out 6.9 Kv Breaker + (11:13:25, 7 January 2025)
- ML18012A352 + (11:13:27, 7 January 2025)
- HNP-96-148, Forwards Revised NPDES Permit NC0039586,effective 960901 + (11:13:29, 7 January 2025)
- ML18012A350 + (11:13:31, 7 January 2025)
- ML18012A348 + (11:13:32, 7 January 2025)
- EPID:000091 + (11:13:35, 7 January 2025)
- ML18012A339 + (11:13:36, 7 January 2025)
- ML18012A338 + (11:13:37, 7 January 2025)
- ML18012A335 + (11:13:41, 7 January 2025)
- HNP-96-140, Forwards Response to RAI Needed to Complete Review of GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power-Operated Gate Valves + (11:13:42, 7 January 2025)
- HNP-96-131, Informs That Spent Fuel Survey Commitments & Revised HNP FSAR Will Be Completed Concurrently Prior to Commencement of Fuel off-load for Next Refueling Outage in March 1997 + (11:13:43, 7 January 2025)
- HNP-96-133, Monthly Operating Rept for Jul 1996 for Shearon Harris Nuclear Power Plant + (11:13:45, 7 January 2025)
- TAC:M92682 + (11:13:47, 7 January 2025)
- ML18012A331 + (11:13:48, 7 January 2025)
- ML18012A330 + (11:13:49, 7 January 2025)
- ML18012A328 + (11:13:50, 7 January 2025)
- ML18012A327 + (11:13:51, 7 January 2025)
- TAC:M91733 + (11:13:52, 7 January 2025)
- ML18012A325 + (11:13:53, 7 January 2025)
- ML18012A324 + (11:13:54, 7 January 2025)
- HNP-96-129, Informs NRC That Addl Time Needed to Review & Validate Conclusions of Preliminary Evaluations Performed to Respond to 960702 RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (11:13:55, 7 January 2025)
- ML18012A322 + (11:13:55, 7 January 2025)
- HNP-96-122, Withdraws Request for License Amend Re Elimination of Response Time Testing for Selected Pressure & Differential Pressure Sensors + (11:13:57, 7 January 2025)
- 05000400/LER-1996-011, :on 960629,failed to Perform Surveillance of Containment Isolation Valves.Caused by Incorrect Interpretation of TS Surveillance Requirements.Issued Operations Re TS 4.6.1.1 + (11:14:01, 7 January 2025)
- 05000400/LER-1996-010, :on 960628,surveillance Test Deficiencies Identified in Quarterly RHR Sys.Caused by Inadequate Test Procedures Resulting from Personnel Errors.Scheduled Tests on Administrative Hold & Procedures Revised + (11:14:02, 7 January 2025)
- ML18012A310 + (11:14:04, 7 January 2025)
- ML18012A307 + (11:14:05, 7 January 2025)
- ML18012A308 + (11:14:05, 7 January 2025)
- HNP-96-094, Application for Amend to License NPF-63,TS 3/4.6.2, Containment Spray Sys,Extending Surveillance Interval for Performance of Air or Smoke Flow Test Through CS Nozzles from Once Every 5 Years,To Once Every 10 Years + (11:14:06, 7 January 2025)
- ML18012A305 + (11:14:06, 7 January 2025)