ML18012A322
| ML18012A322 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/07/1996 |
| From: | Imbro E Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML18012A323 | List: |
| References | |
| NPF-63-A-066 NUDOCS 9608130132 | |
| Download: ML18012A322 (8) | |
Text
~fl R50(
~p A,pp I
P r
'+n gO
+w*w+
t t
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 CAROLINA POWER 8
LIGHT COMPANY et al.
DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1
AMENDM NT TO FACILITY OPERATING LICENSE Amendment No. 66 License No. NPF-63 2.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power 3 Light Company, (the licensee),
dated May 31,
- 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended'(the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commissjon; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and.safety of the public; and f.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No.
NPF-63 is hereby amended to read as follows:
9608i30i32 960807 PDR ADQCK 05000400 P
, PDR
3.
c S ecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto,-
as revised through Amendment No. 66, a'e hereby incorporated into this license.
Carolina Power
- 5. Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 7, 1996 1
R>~ ~<w Eugene V. Imbro, Director Project Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AM NDMENT NO.
66 FACILITY OPERATING LICENSE NO.
NPF-63 DOCKET NO. 50-400 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised areas are indicated by marginal lines.
~R 3/4 3-58 3/4 3-59 3/4 3-58 3/4 3-59
V
t TABLE 3.3-7 S I MIC MON T RING INSTR MENTAT ON INSTRUMENTS AND SENSOR LOCATIONS
- 1. Triaxial Time-History Accelerographs a.
Containment Mat (El 221 ft)
- b. Containment (El 286 ft)
- c. Diesel Fuel Oil Storage Tank Building (El 242 ft)
- 2. Triaxial Peak Accelerograph Recorders
- a. Reactor Coolant Pipe (Loop B) b.
Steam Generator 1A Pedestal (El 238 ft)
- c. Reactor Auxiliary Building (El 236 ft)
- 3. Triaxial Seismic Switches
- a. Starter Unit for Time History Accelerograph System--Containment Mat (El 221 ft)
MEA)UREMENT RANGE 0.01-1.0 g
0.01-1.0 g
0.01-1.0 g
+ 10 g
+ 2g
+10 g 0.005
- 0.05 MINIMUM INSTRUMENTS OPERABLE
- b. Triaxial Seismic Switch--Containment 0.025
- 0.25 Mat (El 221 ft)
- 4. Triaxi al Response-Spectrum Recorders a.
Steam Generator 1B Pedestal (El 238 ft)
- b. Reactor Auxiliary Building (El 216 ft)
+2g
+ 2 g
+2g
- c. Diesel Fuel Oil Storage Tank Building
+ 2 g (E1 242 ft)
- d. Containment Building (El 221 ft)
With main control room indication.
"With main control room recording.
SHEARON HARRIS
-, UNIT 1 3/4 3-58 Amendment No.
66
INSTRUMENTS AND SENSOR LOCATIONS t
TABLE 4.3-4 t SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE RE UIREMENTS ANALOG CHANNEL CHANNEL CHANNEL OPERATIONAL CHECK CALIBRATION TEST
- 1. Triaxial Time-History Accelerographs
- a. Containment Mat (El 221 ft)
- b. Containment (El 286 ft)
- c. Diesel Fuel Oil Storage Tank Building M
(El 242 ft)
- 2. Triaxial Peak Accelerograph Recorders a.
Reactor Coolant Pipe (Loop B) b.
Steam Generator 1A Pedestal (El 238 ft)
N.A.
- c. Reactor Auxiliary Building (El 236 ft)
N.A.
- 3. Triaxial Seismic Switches
- a. Starter Unit for Time History Accelerograph System--Containment Mat (El 221 ft)
- b. Triaxial Seismic Switch--Containment M
Mat (El 221 ft)"
- 4. Triaxial Response-Spectrum Recorders a.
Containment Building (Active)
(El 221 ft) b.
Steam Generator (Passive) 1B Pedestal N.A.
- c. Reactor Auxiliary Building (Passive)
N.A.
(El 216 ft)
- d. Diesel Fuel Oil Storage Tank Building N.A.
(Passive)
(El 242 ft)
SA"*
SA"*
SA N.A, N.A'.
N.A.
N.A.
"Except seismic starter unit.
With main control room alarms.
The bistable trip setpoint need not be determined during the performance of a channel operational test.
SHEARON HARRIS - UNIT 1 3/4 3-59 Amendment No. 66
'