Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:M98207 + (11:08:42, 7 January 2025)
- HNP-97-094, Forwards Proprietary Info Re Name,Docket Number & License Number of SRO That Has Been Reassigned within CP&L from Position Which CP&L Previously Certified Need for SRO License.Encl Withheld,Per 10CFR2.790(a)(6) + (11:08:44, 7 January 2025)
- ML18012A623 + (11:08:44, 7 January 2025)
- HNP-97-081, Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1 + (11:08:46, 7 January 2025)
- ML18012A617 + (11:08:49, 7 January 2025)
- HNP-97-079, Forwards Response to Violations Noted in Insp Rept 50-400/97-01.Corrective Actions:Operations Night Order Issued on 970205 to Inform Personnel of Intent to Withdraw TS Bases Change for Rated Thermal Power + (11:08:50, 7 January 2025)
- HNP-97-072, Clarifies Commitment Made to NRC for Util Implementation of GL 88-17, Loss of Decay Heat Removal Response Mod + (11:08:52, 7 January 2025)
- HNP-97-078, Submits Supplement to Response to Violations Noted in Insp Rept 50-400/96-06.Rev to Paragraph Re Fire Protection Sys, Provided + (11:08:54, 7 January 2025)
- ML18012A613 + (11:08:57, 7 January 2025)
- ML18012A612 + (11:08:58, 7 January 2025)
- ML18012A610 + (11:08:59, 7 January 2025)
- ML18012A607 + (11:09:00, 7 January 2025)
- HNP-97-073, Informs of Intention to Extend First ten-yr Interval for Both ISI and Inservice Testing Programs by Four Months by Extending Current Interval End Date of 970501 to 970901 + (11:09:01, 7 January 2025)
- ML18012A605 + (11:09:03, 7 January 2025)
- 05000400/LER-1997-004, :on 970304,in-plant Spent Fuel Cask Handling Activities Conducted Outside Design Basis.Caused by Lack of Understanding of Requirements.Operations Placed on Hold Pending NRC Review & Approval of Procedures + (11:09:05, 7 January 2025)
- 05000400/LER-1997-003-01, :on 970227,steam Generator Low Level Protection Circuitry Outside Design Basis Occurred.Caused by Inadequate Failure Modes & Effects Analysis Performed as-built Piping Configuration for S/G Level.Review Performed + (11:09:07, 7 January 2025)
- ML18012A602 + (11:09:09, 7 January 2025)
- IR 05000400/1996003 + (11:09:10, 7 January 2025)
- ML18012A599 + (11:09:11, 7 January 2025)
- IR 05000400/1997300 + (11:09:13, 7 January 2025)
- ML18012A595 + (11:09:14, 7 January 2025)
- ML18012A594 + (11:09:15, 7 January 2025)
- IR 05000400/1996009 + (11:09:16, 7 January 2025)
- IR 05000400/1996011 + (11:09:20, 7 January 2025)
- ML18012A589 + (11:09:22, 7 January 2025)
- ML18012A587 + (11:09:23, 7 January 2025)
- IR 05000373/2018010 + (11:09:24, 7 January 2025)
- ML18012A586 + (11:09:24, 7 January 2025)
- HNP-97-061, Monthly Operating Rept for Feb 1997 for Shearon Harris Nuclear Power Plant + (11:09:26, 7 January 2025)
- ML18012A581 + (11:09:28, 7 January 2025)
- 05000400/LER-1996-020, :on 960906,inadvertent RWST Boron Dilution Event Occurred.Caused by Personnel Error.Operating Procedure Was Revised to Reflect locked-closed Designation for RWST Fill Valve 1DW-5 + (11:09:30, 7 January 2025)
- HNP-97-056, Application for Amend to License NPF-63,revising Tech Specs Surveillances 4.1.2.2.c,4.5.2.e,4.6.2.1.c,4.6.2.2.c,4.6.3.2, 4.7.1.2.1.b,4.7.3b & 4.7.4.b to Delete Specific Restrictions in Text of Surveillances + (11:09:31, 7 January 2025)
- ML18012A570 + (11:09:34, 7 January 2025)
- ML18012A573 + (11:09:34, 7 January 2025)
- ML18012A568 + (11:09:35, 7 January 2025)
- ML18012A562 + (11:09:36, 7 January 2025)
- HNP-97-064, Provides Addl Info to Support Evaluation of Potential Cask Drop Scenario While Reactor at Power,In Response to NRC Bulletin 96-002 + (11:09:37, 7 January 2025)
- HNP-97-032, Provides 180-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (11:09:39, 7 January 2025)
- HNP-97-060, Confirms 970214 Telcon Re Potential Inability to Completely Satisfy Requirements of Augmented Reactor Pressure Vessel Shell Weld Exams Scheduled for Upcoming Apr 1997 Refueling Outage at HNP + (11:09:41, 7 January 2025)
- HNP-97-057, Responds to RAI Re Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over SR Equipment + (11:09:43, 7 January 2025)
- TAC:M96760 + (11:09:44, 7 January 2025)
- ML18012A554 + (11:09:45, 7 January 2025)
- ML18012A551 + (11:09:47, 7 January 2025)
- ML18012A548 + (11:09:48, 7 January 2025)
- TAC:M96533 + (11:09:49, 7 January 2025)
- ML18012A547 + (11:09:49, 7 January 2025)
- ML18012A545 + (11:09:50, 7 January 2025)
- 05000400/LER-1997-001-01, :on 970131,automatic Reactor Tripped Resulting from SG low-low Level.Caused by Inadvertent Closure of Mfiv (1FW-159) & Faulty Hydraulic Relays.Shuttle Valves Replaced, SG Level Discrepancy Investigated + (11:09:52, 7 January 2025)
- HNP-97-054, Provides Addl Info Re 970110 License Amend Request to Clarify Pressure Testing Requirements for Isolable & non- Isolable Diesel Fuel Oil Piping + (11:09:56, 7 January 2025)
- HNP-97-039, Forwards Response to NRC Re Violations Noted in Insp Rept 50-400/96-11.Corrective Actions:Sg a Feed Flow Red Pen Was Reprimed to Allow Trace to Be Read + (11:09:58, 7 January 2025)
- HNP-97-051, Numbers of Personnel & Man-Rem by Work & Job Function,1996 Harris Plant + (11:10:00, 7 January 2025)
- HNP-97-047, Submits Supplemental Response to Insp Rept 50-400/96-09 Re Corrective Action to Violation of Failure to Scope Required Systems & Components within Maint Rule + (11:10:02, 7 January 2025)