ML18012A599
| ML18012A599 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/13/1997 |
| From: | Shymlock M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robinson W CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18012A600 | List: |
| References | |
| NUDOCS 9704010284 | |
| Download: ML18012A599 (9) | |
See also: IR 05000400/1997001
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
~ 't
ACCESSION NBR:9704010284
DOC.DATE: 97/03/13
NOTARIZED:
NO
~
~
FACIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1,
Carolina'UTH.
NAME
AUTHOR AFFILIATION
SHYMLOCK,M.B.
Region
2 (Post
820201)
RECZP.NAME
RECIPIENT AFFILIATION
ROBINSON,W.R.
Carolina
Power
6 Light Co.
SUBJECT:
Forwards
insp rept 50-400/97-01
on 970105-0215
& NOV.
DISTRIBUTION CODE:
ZE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
DOCKET
05000400
(W3Z
c
05000400
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
FILE CE
R DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN2
FILE
01
EXTERNAL: LITCO BRYCE,J
H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
LE,N
AEOD/SPD/RAB
DEDRO
NRR/DISP/PIPB
NRR/DRPM/PECB
NUDOCS-ABSTRACT
OGC/HDS2
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
D
0
U
egg~
~wc~'>~o~
Lopp
E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE ~
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
March 13,
1997
Carolina
Power
8 Light Company
ATM:
Hr .
W. R. Robinson
Vice President
- Harris Plant
Shearon Harris Nuclear Power Plant
P. 0.
Box 165, Hail.Code:
Zone
1
New Hill, NC
27562-0165
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-400/97-01
Dear Hr. Robinson:
On February
15,
1997, the
NRC completed
an inspection at your Harris reactor
facility.
The enclosed report presents
the results of that inspection.
During the six weeks covered
by this inspection period, our inspectors
found
that your staff generally took a safety conscious
approach to the activities
conducted at the Harris Plant.
Our special
assessment
of operator
performance,
which included requalification examinations,
did not find any
problems
above
and beyond those that your staff had already identified.
We
found that your staff had accomplished
an extensive evaluation of operator
performance
and that your corrective actions are extensive.
Since your
corrective actions
have only been in place for a short period of time,
we will
continue to follow their implementation
and make
a determination
on their
eff'ectiveness
at
a later date.
Two violations were identified during the
period.
The first is of particular concern
because
you attempted to change
a
Technical Specification by changing the Technical Specification Basis.
These violations are cited in the enclosed
Notice of Violation, and the
circumstances
surrounding the violations are described in detail in the
enclosed report.
Please
note that you are required to respond to this letter
and should follow the instructions specified in the enclosed
Notice when
preparing your response.
The
NRC will use your response,
in part, to
determine whether further enforcement action is necessary
to ensure
compliance
with regulatory requirements.
9'704010284
97033.3
ADQCK 05000400
8
llll:IBllNllt)lIll
GIIlllHlill
ACc(
b
CP8L
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room
(PDR).
Sincerely,
Docket No. 50-400
License
No.
Enclosures:
1.
2.
NRC Inspection Report
cc w/encls:
J.
Cowan,
Manager
Operations
5 Environmental
Support
HS OHS7
Carolina
Power 5 Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
J.
W. Donahue
Director of Site Operation."
Carolina
Power
8 Light Company
Shearon Harris Nuclear
Power
Plant
P. 0.
Box 165,
HC:
Zone
1
New Hill. NC
27562-0165
Bo Clark
Plant General
Manager
- Harris Plant
Carolina
Power
8 Light Company
Shearon Harris Nuclear
Power
Plant
P. 0.
Box 165
New Hill, NC
27562-0165
T.
D. Walt, Hanager
Regulatory Affairs
Carolina
Power
8 Light Company
Shearon Harris Nuclear
Power
Plant
P. 0.
Box 165, Hail Zone
1
New Hill, NC
27562-0165
(cc w/encls cont'd
- See
page 3)
Hilton B. Shymlock, Chief
Reactor Projects
Branch 4
Division of Reactor Projects
(cc w/encls cont'd)
W. D. Johnson,
Vice President
and Senior Counsel
Carolina
Power
8 Light Company
P. 0.
Box 1551
Raleigh,
NC
27602
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environmental
'ealth
5 Natural
Resources
P. 0.
Box 27687
Raleigh,
NC
27611-7687
Karen E.
Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh,
NC
27602
Public Service
Commission
State of South Carolina
P. 0.
Box 11649
Columbia,
SC
29211
Chairman of the North Carolina
Utilities Commission
P. 0. Box 29510
Raleigh,
NC
27626-0510
Robert
P.
Gruber
Executive Director
Public Staff NCUC
P..O.
Box 29520
Raleigh,
NC
27626
Hargaret Bryant Pollard,
Chairman
Board of County Commissioners
of Chatham County
P. 0. Box 87
Pittsboro,
NC
27312
(Distribution w/encls
- See
a
e 4)
CPSL
Distribution w/encls:
H. Shymlock, RII
J. Coley, RII
R. Aiello, RII
J.
Lenahan,
RII
W. Rankin, RII
D. Thompson,
RII
N. Le,
PUBLIC
NRC Resident
Inspector
U. S. Nuclear Regulatory Commission
5421 Shearon Harris Road
New Hill, NC
27562-9998
- (See previous concurrence)
SIGNATWE
OATE
COPY2
GHaeOonald alt
JBrady
03 /
/ 97
03 I
/ 97
YES
HO
YES
HO
DRoberts
03 I
I 97
YES
NO
RAlello
CPayne
HHlller
03 /
/ 97
03 /
/ 97
03 I
/ 97
YES
HO
YES
HO
YES
NO
LED, NR-12-S't
11:38AN
VS NRG
91S 362 8648
P. 91
rib
w encl
3.
Co ey, RII
J.
Lenahan,
R1I
W. Rankin, RjI
0. Thompson,
RIT
N. Le.
PUBLIC
NRC Resident
Inspector
U. S. Nut:lear Regula".ory Cmmission
5421 Shearon Harris Road
New Hill, tie
27562-9998
~It
DOPI IAp0ngy
Phone I
~hLFlu 99 P.~
FAX TRANSZ>yYAL
4 C
~ct'10H
7)40 PI 017 7000
00N IOI
OENNML04IIYICE8 ADhtAIS1RATIOH
>1C
s
Sim700S
<Zeta>4 AS
RA)Ll'0
CPa/IIa
DATE
03 / /M 9
0: l 2 / 97
03 / t2-
~
03 /
/ 9)
03 I
/ 97
03 /
/ 97
C0773
YES
HD
TES
HO
YES
aft
IIO
Tl)TAL P. '81
CPSL
Distribution w/encls:
J. Coley, RII
J.
Lenahan,
RII
W. Rankin, RII
D. Thompson,
RII
N. Le,
P,UBLIC
NRC Resident
Inspector
U. S. Nuclear Regulatory Commission
5421 Shearon Harris Road
New Hill, NC
27562-9998
SIGNATURE
NANE
BNaeDonald alt
DATE
03 /
/ 97
JBrady
ORoberts
RAiello
03 /
/ 97
03 /
/ 97
03 /
/ 9
03 //4 / 97
03 /
I 4'7
COPYT
YES
NO
YES
NO
YES
NO
E
YES
NO
YES
NO
- p'5