Forwards SE Authorizing Relief Request Through End of Second 10-yr ISI
ML18012A545
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/10/1997
From: Reinhart M
NRC (Affiliation Not Assigned)
To: Robinson W
CAROLINA POWER & LIGHT CO.
Shared Package
ML18012A546 List:
References
TAC-M96533, NUDOCS 9703130324
Download: ML18012A545 (4)


Text

March 10, 1997 Mr.

W.

R. Robinson, Vice President Shearon Harris Nuclear Power Plant Carolina Power

& Light Company Post Office Box 165 - Mail Code:

Zone 1

New Hill, North Carolina 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1

REQUEST FOR APPROVAL TO USE ASME CODE CASE N-522 (TAC NO. M96533)

Dear Mr. Robinson:

On September 9,

1996, as supplemented January 24,
1997, the Carolina Power Light Company (CP&L) requested relief from performing certain examinations at Shearon Harris Nuclear Power Plant, Unit 1

(SHNPP).

In place of certain system pressure tests required by the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel

Code, CP&L proposed the alternative to use ASME Code Case N-522 in conjunction with two proposed provisions, i.e.,
1) the tests shall be conducted at maximum containment calculated pressure (Pa),

and

2) when using air or gas as testing
medium, the test procedures shall include methods for locating and detecting through-wall leakage in components of the system being tested.

On the basis of the enclosed Safety Evaluation, the relief request is authorized through the end of the second 10-year inservice inspection interval.

Code Case N-522 has not been endorsed in Regulatory Guide

1. 147, Rev.

11, and thus the use of ASME Code Case N-522 is authorized until such time when it is endorsed in a future revision of Regulatory Guide 1, 147.

At that time, if a licensee'ntends to continue to implement this Code Case, it must follow all its provisions in Code Case N-522, with the limitations issued in Regulatory Guide

1. 147, if any.

If you have any questions, please contact your NRR Project Manager',

Mr. N.

B.

Le, at 301-415-1458.

Sincerely, (Original Signed By)

Mark Reinhart, Acting Director Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

Safety Evaluation cc w/enclosure:

See next page DOCUMENT NAME: G: iHARRISiHAR96533. RLF

(*See SER memo dated 2/19/97 from ECGB's GBa chi to PDII-1's Reinhart)

OFFICE PM: PDI I-1 NAME NLe LA:PDI I-1 Dunnin ton ECGB*

GBa chi OGC D: PDI I-1 Reinha DATE 02 R/97 02 P/97 02/

97 8<s s~

//a COPY Yes No es No Yes/No Yes/

o Yes/No OFFICIAL RECORD COPY 9'703i30324 9'70310 PDR ADOCK 05000400 PDR mweeK C+lIS'~

f J f'-t~

Ip, k'

'I l E.l 5

"'< 4 I'I g

Mr.

W. R. Robinson Carolina Power

& Light Company CC:

Mr. William D. Johnson Vice President and Senior Counsel Carolina Power

& Light Company Post Office Box 1551

Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission 5421 Shearon Harris Road New Hill, North Carolina 27562-9998 Ms. Karen E.

Long Assistant Attorney General State of North Carolina-Post Office Box 629

Raleigh, North Carolina 27602 Public Service Commission State of South Carolina Post Office Drawer 11649
Columbia, South Carolina 29211 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta St.,

N.W. Suite 2900 Atlanta, Georgia 30323 Mr. Dayne H. Brown, Director Division of Radiation Protection N.C. Department of Environmental Division of Radiation Protection Commerce

& Natural Resources Post Office Box 27687

Raleigh, North Carolina 27611-7687 Mr. J.

Cowan Vice President Nuclear Services and Environmental Support Department Carolina Power

& Light Company Post Office Box 1551 - Mail OHS7

Raleigh, North Carolina 27602 Mr. Bo Clark Plant General Manager - Harris Plant Carolina Power

& Light Company Shearon Harris Nuclear Power Plant P.O.

Box 165 New Hill, North Carolina 27562-0165 Shearon Harris Nuclear Power Plant Unit" 1 Mr. J.

W. Donahue Director of Site Operations Carolina Power

&. Light Company Shearon Harris Nuclear Power Plant Post Office Box 165, MC: Zone 1

New Hill, North Carolina 27562-0165 Mr. Robert P. Gruber Executive Director Public Staff NCUC Post Office Box 29520

Raleigh, North Carolina 27626 Chairman. of the North Carolina Utilities Commission Post Office Box 29510 Raleigh, North Carolina 27626-0510 Mr. T. D. Walt
Manager, Regulatory Affairs.

Carolina Power

& Light Company Shearon Harris Nuclear Power Plant P. 0.

Box 165, Mail Zone 1

New Hill, North Carolina 27562-0165 Mr. Vernon Malone, Chairman Board of County Commissioners of Wake County P. 0.

Box 550

Raleigh, North Carolina 27602 Margaret Bryant Pollard, Chairman Board of County Commissioners of Chatham County P. 0.

Box 87 Pittsboro, North Carolina 27312

'r. Milton Shymlock U.S. Nuclear Regulatory Comm.

101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323-0199

C