Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18016A493 + (10:59:24, 7 January 2025)
- ML18016A496 + (10:59:24, 7 January 2025)
- HNP-98-103, Forwards Written Response to 980528 RAI Re GSI 165, Spring- Actuated Safety & Relief Valve Reliability + (10:59:25, 7 January 2025)
- IR 05000400/1998001 + (10:59:27, 7 January 2025)
- HNP-98-093, Responds to NRC Re Violations Noted in Insp Rept 50-400/98-04.Corrective Actions:Tag for Equipment Clearance 98-00444 Was Properly Hung for Valve 1MS-63 + (10:59:28, 7 January 2025)
- HNP-98-102, Requests Change to NRC Service/Distribution List to Reflect Recent Mgt Change at Cp&L.Personnel Changes & Dates Are Listed + (10:59:30, 7 January 2025)
- HNP-98-096, Monthly Operating Rept for June 1998 for Shnpp + (10:59:32, 7 January 2025)
- ML18016A485 + (10:59:34, 7 January 2025)
- 05000400/LER-1997-002, :on 970207,determined That Cold Weather Conditions Resulted in Mfiv Being Potentially Inoperable During Period 970117-20.Caused by Inadequate Design of HVAC Sys.Implemented Mods to Steam Tunnel HVAC Sys + (10:59:35, 7 January 2025)
- 05000400/LER-1997-002-01, Fowards LER 97-002-01,IAW 10CFR50.73.Rev Provides Addl Corrective Actions Taken to Address Low Temps in Area of Mfiv + (10:59:37, 7 January 2025)
- TAC:MA1285 + (10:59:39, 7 January 2025)
- ML18016A480 + (10:59:39, 7 January 2025)
- ML18016A479 + (10:59:40, 7 January 2025)
- ML18016A476 + (10:59:41, 7 January 2025)
- ML18016A475 + (10:59:42, 7 January 2025)
- IR 05000400/1998003 + (10:59:43, 7 January 2025)
- ML18016A473 + (10:59:45, 7 January 2025)
- ML18016A471 + (10:59:46, 7 January 2025)
- 05000400/LER-1997-021, :on 980210,discovered That SFP Water Level Had Not Been Verified Greater than 23 Feet Above BWR Fuel Assemblies.Caused by Misinterpretation of TS Requirements. Will Submit TS Change Request to Revise TS 3.9.1.11 + (10:59:47, 7 January 2025)
- 05000400/LER-1997-021-03, Forwards LER 97-021-03,per 10CFR50.73.Rev Provided New Scheduled Completion Date of 980901 for TS Change Request Described in Planned Correction Action Number 1 + (10:59:49, 7 January 2025)
- ML18016A466 + (10:59:53, 7 January 2025)
- HNP-98-092, Provides Revised Response to NRC Re Violations Noted in Insp Rept 50-400/98-01.Corrective Actions:Fire Seal P 3308 & Two Addl Fire Seals (P 661 & P 671) Have Been Evaluated & Determined Operable & Procedure CMP-010 Revised + (10:59:54, 7 January 2025)
- TAC:M98857 + (10:59:56, 7 January 2025)
- HNP-98-074, Forwards Response to 980225 RAI Re Proposed Amend to TS 3/4.6.2 Re Depressurization & Cooling Systems.Info Requested to Be Provided within 30 Days of End of Next Refueling Outage,Which Is Scheduled to Commence 981024 + (10:59:57, 7 January 2025)
- ML18016A461 + (10:59:59, 7 January 2025)
- TAC:M99996 + (11:00:00, 7 January 2025)
- HNP-98-025, Informs of Mod to Commitment to Perform Comprehensive Review of Implementation of TS Surveillance Requirements + (11:00:01, 7 January 2025)
- ML18016A458 + (11:00:01, 7 January 2025)
- HNP-98-082, Discusses Commitment to Joint Owners Group Program,MPR-1807, Rev 2 Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs + (11:00:03, 7 January 2025)
- HNP-98-085, Monthly Operating Rept for May 1998 for Shearon Harris Nuclear Power Plant + (11:00:05, 7 January 2025)
- ML18016A450 + (11:00:07, 7 January 2025)
- 05000400/LER-1998-006, :on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling Each + (11:00:08, 7 January 2025)
- ML18016A448 + (11:00:10, 7 January 2025)
- HNP-98-077, Forwards Response to Violations Noted in Insp Rept 50-400/98-03.Corrective Actions:Performed Review of Condition Repts Initiated in 1998 & Classified as Minor within Regulatory Affairs CAP Subprogram + (11:00:11, 7 January 2025)
- HNP-98-078, Forwards Response to 980507 RAI Re GL 97-04, Assurance of Sufficient NPSH for ECC & Containment Heat Removal Pumps + (11:00:12, 7 January 2025)
- HNP-98-081, Submits Info Re Estimated Effect of Error Identified in ECCS Model,Per 10CFR50.46(a)(3)(ii).Error Results in Reduction of PCT for Large Break LOCA Analysis to Be Amount Greater than 50 F.Topical Rept Will Be Submitted to NRC by 980831 + (11:00:14, 7 January 2025)
- ML18016A442 + (11:00:16, 7 January 2025)
- HNP-98-079, Forwards 1997 Automated Inservice Exam of RPV & Adjacent Piping Welds at Shearon Harris Nuclear Plant,Unit 1, Vol 1, Final Rept W/Appendices.Rept Provides Response to NRC 980413 RAI Re ISI Program Relief Request Submitted on 971216 + (11:00:17, 7 January 2025)
- ML18016A439 + (11:00:20, 7 January 2025)
- ML18016A440 + (11:00:20, 7 January 2025)
- IR 05000272/2018403 + (11:00:22, 7 January 2025)
- ML18016A431 + (11:00:23, 7 January 2025)
- ML18016A430 + (11:00:24, 7 January 2025)
- HNP-98-071, Forwards Revised Proposed TS Pages Re 980424 Request for Amend to License NPF-63.Listed Suppl Info Provided + (11:00:28, 7 January 2025)
- ML18016A427 + (11:00:30, 7 January 2025)
- ML18016A424 + (11:00:35, 7 January 2025)
- TAC:M98189 + (11:00:36, 7 January 2025)
- ML18016A423 + (11:00:37, 7 January 2025)
- ML18016A422 + (11:00:38, 7 January 2025)
- ML18016A414 + (11:00:39, 7 January 2025)
- ML18016A413 + (11:00:40, 7 January 2025)
- HNP-98-058, Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1997 & Rev 10 to ODCM for Shearon Harris Nuclear Power Plant + (11:00:41, 7 January 2025)