CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME w
AUTHOR AFFILIATION ROGERS,S.
Carolina Power E Light Co; DONAHUE,J.W.
Carolina Power
&. Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operating rept for June 1998 for SHNP DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR'NCL TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.
980715 ltr.
SIZE:
T 05000400 E
RECIPIENT XD CODE/NAME PD2-1 PD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
'LANDERS,S COPIES LTTR ENCL 1
1 0
INTERNAL: ACR LE CENTER 01 RGN2 1
1 1
1 1
AEOD/SPD/RRAB OC/DBA/PAD 1
1 1
1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1
1 1
1 NOAC 1
1 D
N NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEZVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPXES REQUIRED:
LTTR 10 ENCL 10
0 T
Carolina Power & light Contpany Harris Nuclear Plant PO Box 165 New Hill NC 27562 JUL 1
S 1998 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Serial: HNP-98-096 SHEARON HARRIS NUCLEARPOWER PLANT DOCKETNO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report ofoperating statistics and shutdown experience for the month of June 1998 is provided.
Sincerely, J W. Donahue Director ofSite Operations Harris Plant SGR Enclosure c:
Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator
'st807220232
'st80630 PDR ADQCK 05000400 R
PDR State Road 1134 New Hill NC
Enclosure to Serial HNP-98-096 Sheet l of2 CP&L CO.
RUN DATE 07/06/98 RUN TIME 10:07:19 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1
RPD36-000 OPERATXNG STATUS DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.
UNIT NAME:
HARRIS UNIT 1 2.
REPORTING PERIOD:
JUNE 98 3.
LICENSED THERMAL POWER (MWT):
2775 4.
NAMEPLATE RATING (GROSS MWE):
950.9 5.
DESIGN ELECTRICAL RATING (NET MWE):
900.0 6.
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.
MAX DEPENDABLE CAPACITY (NET MWE):
860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10.
REASONS FOR RESTRICTION IF ANY:
THIS MONTH YR TO DATE CUMUL ATIVE 11.
HOURS IN REPORTING PERIOD 12.
NUMBER OF HOURS REACTOR CRITICAL 13.
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR ON LINE 15.
UNIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEN.
(MWH) 17.
GROSS ELEC.
ENERGY GEN (MWH) 18.
NET ELEC.
ENERGY GENERATED (MWH) 19.
UNXT SERVICE FACTOR 20.
UNXT AVAILABILITYFACTOR 21.
UNIT CAP.
FACTOR (USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 720.00 720.00
.00 720.00
.00 1993704.30 653799.00 614081.00 100.00 100. 00
- 99. 17 94.77
.00 4343.00 4343.00
.00 4343.00
.00 11969345.34 3991101.00 3749303.00 100.00 100.00 100.38 95.92
.00 97872.00 82652.71
.00 81836.54
.00 219804122.52 73172905.00 68274608.00 83.62 83.62 81.12 77.51 3.22 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Plant Refueling Outage number 8 is planned to begin October 24,
- 1998, and is scheduled for a duration of 34 days.
25.
1F SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS XN TEST STATUS (PRIOR TO COMMERCIAL OPERATXON):
FORECAST ACHIEVED INITIALCRITICALITY INITXALELECTRICITY COMMERCIAL OPERATION 1.16 -
9
\\
~
+
~
~I Enclosure to Serial: HNP-98-096 Sheet 2 of2 CP&L CO.
PLANT PERFORMANCE DATA SYSTEM RUN DATE 07/06/98 APPENDIX B " AVERAGE DAILY POWER LEVEL RUN TIME 10:07:18 HARRIS UNIT 1 PAGE 1
RPD39-000 JUNE 1998 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG. DAILY POWER LEVEL (MWE-NET)
DAY AVG. DAILY POWER LEVEL (MWE-NET) 10 12 13 15 16 851 854 850 861 858 865 871 868 863 857 854 848 850 858 849 845 17 18 19 20 21 22 23 24 25 26 27 28 29 30 852 853 849 853 853 850 850 850 849 843 846 848 845