ML18016A442

From kanterella
Jump to navigation Jump to search
Amend 79 to License NPF-63,revises TS 3.3.2 Such That Surveillance of Undervoltage Relays May Be Performed W/O Entry Into TS 3.0.3
ML18016A442
Person / Time
Site: Harris 
(NPF-063)
Issue date: 06/03/1998
From: Kuo P
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18016A443 List:
References
NPF-63-A-079 NUDOCS 9806080240
Download: ML18016A442 (10)


Text

~R RE0ii

~o Cy A

~O

+a**+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555EO01 LINA E

8 G

Y al D

CKET 0

0 A

I LE MEND T

ERA Amendment No.

79 License No. NPF-63 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power 8 Light Company, (the licensee), dated April24, 1998, as supplemented by letter dated May 15, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facilitywilloperate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 ofthe Commission's regulations and all applicable requirements have been satisfied.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-63 is hereby amended to read as follows:

9806080240 980603 PDR ADQCK 05000400 P

PDR

(2)

Tec n'cal S ecii

'o E v' e

io a

The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, as revised through Amendment No. 79, are hereby incorporated into this license.

Carolina Power 8 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.'his license amendment is effective as of the date of its issuance and shall be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORYCOMMISSION

'ao-Tsin Kuo, Acting Director Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

June 3, 1998

C E

D S

OAO Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.

The revised areas are indicated by marginal lines.

ov P

s s

3/4 3-25 3/4 3-26 3/4 3-25 3/4 3-26

TABLE 3.3-3 Continued ENGINEERED SAFETY. FEATURES ACTUATION SYSTEM INSTRUMENTATION FUNCTIONAL UNIT 8.

Containment Spray Switch-over to Containment Sump (Continued) b.

RWST--Low Low Coincident With Containment Spray 9.

Loss-of-Offsite Power a.

6.9 kV Emergency Bus--

Undervoltage Primary b.

6.9 kV Emergency Bus--

Undervoltage Secondary 10.

Engineered Safety Features Actuation System Interlocks a.

Pressurizer Pressure.

P-11 Not P-11 b.

Low-Low T,,, P-12 c.

Reactor Trip, P-4 d.

Steam Generator Water Level P-14 TOTAL NO.

OF CHANNELS CHANNELS TO TRIP HINIMUN CHANNELS APPLICABLE OPERABLE NODES ACTION 3/bus 3/bus 2/bus 2/bus 2/bus 2/bus 1, 2, 3, 4

1. 2, 3, 4

15a*

t 15a" I

3 2

2

1. 2.

3 3

2 2

l. 2.'3 3

2 2

l. 2, 3

2 2

2

1. 2, 3

See Item 5.b.

above for all P-14 initiating functions and requirements'0 20 20 22 See Item 7.b.

above for all RWST--Low Low initiating functions and requirements.

See Item 2 above for all Containment Spray initiating functions and requirements.

0

'HEARON HARRIS - UNIT 1 3/4 3-25 Amendment Na.

79

'1

TABLE 3.3-3 Continued TABLE NOTATIONS

'The provisions of Specification 3.0.4 are not applicable.

PTrip f'unction may be blocked in this MODE below the P-11 (Pressurizer Pressure Interlock) Setpoint.

~During CORE ALTERATIONS or movement of irradiated fuel in containment, refer to Specification 3.9.9.

~~Trip function automatically blockedabove P-11 and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.

ACTION STATEMENTS ACTION 14-ACTION 15-ACTION 15a-ACTION 16-ACTION 17-ACTION 18-With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirements be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however

. one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1, provided the other channel is OPERABLE.

With the number of OPERABLE channels one less than the Total Number of'hannels, operation may proceed until performance of'he next required CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

With the number of OPERABLE channels one less than the Total Number of Channels.

operation may proceed provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

With less than the minimum channels OPERABLE, operation may proceed provided the minimum number of channels is restored within one hour. otherwise declare the affected diesel generator inoperable.

When performing surveillance testing of either primary or secondary undervoltage

relays, the redundant emergency bus and associated primary and secondary relays shall be OPERABLE.

With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the Minimum Channels OPERABLE requirement is met.

One additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1.

With less than the Minimum Channels OPERABLE requirement.

operation may continue provided the Containment Purge Makeup and Exhaust Isolation valves are maintained closed while in MODES l.

2, 3 and 4 (refer to Specification 3.6. 1.7).

For MODE 6. refer to Specification 3.9.4.

With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement.

restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SHEARON HARRIS - UNIT 1 3<4 3-26 Amendment No. 79