Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- HNP-99-145, Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) + (10:42:30, 7 January 2025)
- ML18017A891 + (10:42:30, 7 January 2025)
- HNP-99-143, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations + (10:42:32, 7 January 2025)
- TAC:MA0918 + (10:42:34, 7 January 2025)
- TAC:MA4432 + (10:42:35, 7 January 2025)
- ML18017A885 + (10:42:35, 7 January 2025)
- ML18017A884 + (10:42:36, 7 January 2025)
- HNP-99-140, Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) + (10:42:37, 7 January 2025)
- PMNS20171487, Pre-Subsequent License Renewal Application Meeting + (10:42:41, 7 January 2025)
- ML18017A880 + (10:42:43, 7 January 2025)
- ML18017A876 + (10:42:44, 7 January 2025)
- ML18017A874 + (10:42:47, 7 January 2025)
- 05000400/LER-1999-007-02, :on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With + (10:42:49, 7 January 2025)
- HNP-99-127, Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety + (10:42:50, 7 January 2025)
- HNP-99-137, Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With + (10:42:52, 7 January 2025)
- ML18017A861 + (10:42:55, 7 January 2025)
- ML18017A860 + (10:42:56, 7 January 2025)
- HNP-99-129, Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity + (10:42:57, 7 January 2025)
- HNP-99-136, Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS + (10:43:02, 7 January 2025)
- HNP-99-130, Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided + (10:43:04, 7 January 2025)
- ML18017A853 + (10:43:05, 7 January 2025)
- HNP-99-111, Application for Amend to License NPF-63,revising TS 3/4.9.4 & Associated Bases to Allow Penetrations Which Provide Direct Access from Containment Atmosphere to Outside Atmosphere to Remain Open During Refueling Operations + (10:43:06, 7 January 2025)
- ML18017A848 + (10:43:08, 7 January 2025)
- IR 05000400/1999004 + (10:43:13, 7 January 2025)
- ML18017A844 + (10:43:15, 7 January 2025)
- HNP-99-126, Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With + (10:43:16, 7 January 2025)
- HNP-99-128, Corrects Statement Made in ,By Clarifying That Operation of Inner & Outer Pal Doors Can Be Operated by Control Panels Located Inside & Outside Containment + (10:43:18, 7 January 2025)
- ML18017A834 + (10:43:20, 7 January 2025)
- ML18017A833 + (10:43:21, 7 January 2025)
- ML18017A832 + (10:43:22, 7 January 2025)
- ML18017A829 + (10:43:23, 7 January 2025)
- ML18017A830 + (10:43:23, 7 January 2025)
- ML18017A827 + (10:43:25, 7 January 2025)
- IR 05000400/1979021 + (10:43:26, 7 January 2025)
- ML18017A825 + (10:43:28, 7 January 2025)
- ML18017A824 + (10:43:29, 7 January 2025)
- ML18017A823 + (10:43:29, 7 January 2025)
- ML18017A822 + (10:43:30, 7 January 2025)
- ML18017A821 + (10:43:37, 7 January 2025)
- ML18017A819 + (10:43:38, 7 January 2025)
- ML18017A818 + (10:43:39, 7 January 2025)
- ML18017A816 + (10:43:39, 7 January 2025)
- ML18017A813 + (10:43:41, 7 January 2025)
- ML18017A812 + (10:43:42, 7 January 2025)
- ML18017A811 + (10:43:43, 7 January 2025)
- ML18017A807 + (10:43:45, 7 January 2025)
- PNO-II-80-010, on 790117,meeting Occurred Between News Media & Electricians.Caused by Concern Over Theft of Personal Tools Required by Util.Previous Occurrence Reported 791024 + (10:43:45, 7 January 2025)
- IR 05000400/1979023 + (10:43:47, 7 January 2025)
- ML18017A803 + (10:43:48, 7 January 2025)
- ML18017A802 + (10:43:49, 7 January 2025)
- ML18017A801 + (10:43:50, 7 January 2025)