Forwards IE Insp Repts 50-400/79-23,50-401/79-23, 50-402/79-22 & 50-403/79-22 on 791106-09 & Notice of Violation
ML18017A802
Person / Time
Site: Harris  
Issue date: 12/05/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017A799 List:
References
NUDOCS 8002060401
Download: ML18017A802 (4)


See also: IR 05000400/1979023

Text

~S Rangy

y

+

0

Cy

no

I

Cy

+

gO

++*++

In Reply Refer To:

RII:RDB

50-400/79-23

50-401/79-23

50-402/79-22

50-403/79-22

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 IVIARIETTA ST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

DEt:

51979

'arolina

Power and Light Company

ATTN: Mr. J. A. Jones,

Senior Executive Vice President

and Chief Operating Officer

411 Fayetteville Street

Raleigh,

NC

27602

Gentlemen:

Qs

This refers

to the

inspection

conducted

by .R. D. Bradley of this office on

November 6-9,

1979,

of activities authorized

by

NRC Construction Permit Nos.

CPPR-158,

CPPR-159,

CPPR-160,

CPPR-161,

for the

Shearon

Harris Nuclear

Power

Plant facility, and to the discussion of our'indings held with R.

M. Parsons

at

the conclusion of the inspection.

Areas

examined

during

the inspection

and

our findings

are

discussed

in the

enclosed

inspection report.'ithin

these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

We have

examined

actions

you

have

taken with regard

to previously, reported

unresolved items.

The status of these items is discussed in the enclosed report.

C

During the inspection, it was

found that certain activities under your license

appear

to be in noncompliance

with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2:201 requires

you to submit to this office, within 20 days of

your receipt of this notice,

a written statement

or explanation in reply including:

(1) corrective steps

which have been taken by you and the results'chieved;

(2)

corrective steps

which will be taken to avoid further noncompliance;

and (3) the

date when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2, Title

'0, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. Ifthis report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application

must

include

a full statement of the reasons

on the basis of which it is claimed 'that

the information is proprietary,

and

should

be prepared

so that proprietary

information identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report willbe placed in the Public Document Room,

800@ 06"

0

Carolina

Power and Light Company

DPC

5 1919

V

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murph

,

C

Reactor Construction

and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-400/79-23

50-401/79-23,

50-402/79-22,

and 50-403/79-22

cc w/encl:

R. Parsons,

Site Manager

P. 0.

Box 101

New Hill, NC

27562