Forwards IE Insp Repts 50-400/79-21,50-401/79-21, 50-402/79-20 & 50-403/79-20 on 791015-18 & Notice of Violation
ML18017A824
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 11/16/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML18017A820 List:
References
NUDOCS 8002200180
Download: ML18017A824 (4)


See also: IR 05000400/1979021

Text

~Q AKgy

+

0

'I

Cy

n

0 ++*++

In Reply Refer To:

RII:RDB

50"400/79-21

50-401/79-21

50-402/79-20

50-403/79-20

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

'101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

NOV I 6 t979

Carolina

Power and Light Company

Attn:

J.

A. Jones,

Senior Executive Vice President

and Chief Operating Officer

411 Fayetteville Street

Raleigh, North Carolina

27602

Gentlemen:

This refers to the inspection

conducted

by R.

D. Bradley of this office on

October 15-18,

1979 of activities authorized by NRC Construction Permit Nos.

CPPR-158,

CPPR-159,

CPPR-160

and

CPPR-161 for the Shearon Harris Nuclear Power

Plant facility, and to the discussion of our findings held with R.

M. Parsons

at

the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

We have

examined actions

you have taken with regard to previously reported

unresolved

items.

The status of these

items is discussed

in the enclosed report.

One new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed

herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal

Regulations.

Section 2.201 requires

you to submit to this office, within 20

days of your receipt of this notice,

a written statement

or explanation in reply

including:

(1) corrective steps

which have been taken by you, and the results

achieved;

(2) corrective steps

which will be taken to avoid further noncompliance;

and (3) the date

when full compliance will be achieved.

C

Carolina Power and Light Company

-2-

fi'OV 1 6 1979

e

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement

of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chic

Reactor Construction

and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-400/79-21,

50-.401/79-21,

50-402/79-20

and

50-403/79"20

cc w/enclosures:

R. Parsons,

Site Manager

Post Office Box 101

New Hill, North Carolina

27562