Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18017A938 + (10:41:45, 7 January 2025)
- ML18017A934 + (10:41:46, 7 January 2025)
- ML18017A933 + (10:41:47, 7 January 2025)
- ML18017A932 + (10:41:48, 7 January 2025)
- ML18017A931 + (10:41:51, 7 January 2025)
- ML18017A930 + (10:41:52, 7 January 2025)
- ML18017A929 + (10:41:53, 7 January 2025)
- ML18017A927 + (10:41:55, 7 January 2025)
- HNP-99-149, Application for Amend to License NPF-63,implementing Selected Improvements Described in GL 93-05 + (10:41:56, 7 January 2025)
- HNP-99-156, Provides Supplemental Info Re 981223 Lar,Placing Plant Spent Fuel Pools C & D in Service.Info Provided Does Not Change Util Initial Determination That Proposed License Amend Represents No Significant Hazards Consideration + (10:41:58, 7 January 2025)
- ML18017A922 + (10:42:01, 7 January 2025)
- 05000400/LER-1999-008-01, :on 991008,CR Emergency Filtration Sys Tech Specs Occurred.Caused by Site Personnel Failed to Recognize That Blocking Open CR Emergency Filtration Sys.Procedures Revised.With + (10:42:03, 7 January 2025)
- IR 05000400/1999007 + (10:42:05, 7 January 2025)
- HNP-99-151, Monthly Operating Rept for Sept 1999 for Shearon Harris Npp. with + (10:42:06, 7 January 2025)
- HNP-99-153, Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon + (10:42:08, 7 January 2025)
- HNP-99-148, Provides Notification That Three SROs Licensed at Shnpp Have Been Reassigned from Position for Which Util Previously Certified Need for SRO License.Name,Docket Number & License Number for Subject Sros,Encl.Encl Withheld + (10:42:10, 7 January 2025)
- ML18017A911 + (10:42:11, 7 January 2025)
- ML18017A907 + (10:42:13, 7 January 2025)
- ML18017A910 + (10:42:13, 7 January 2025)
- IR 05000400/1999005 + (10:42:15, 7 January 2025)
- ML18017A903 + (10:42:17, 7 January 2025)
- ML18017A902 + (10:42:18, 7 January 2025)
- ML18017A901 + (10:42:19, 7 January 2025)
- TAC:MA5209 + (10:42:19, 7 January 2025)
- ML18017A899 + (10:42:20, 7 January 2025)
- ML18017A898 + (10:42:21, 7 January 2025)
- TAC:M97053 + (10:42:22, 7 January 2025)
- ML18017A897 + (10:42:22, 7 January 2025)
- ML18017A895 + (10:42:23, 7 January 2025)
- HNP-99-142, Forwards Response to NRC 990414 RAI Re GL 95-07, Pressure- Locking & Thermal-Binding of SR Power-Operated Gate Valves + (10:42:27, 7 January 2025)
- ML18017A893 + (10:42:29, 7 January 2025)
- HNP-99-145, Submits Info Re Estimated Effect of Changes or Errors in ECCS Evaluation Models or in Application of Models,Per 10CFR50.46(a)(3)(ii) + (10:42:30, 7 January 2025)
- ML18017A891 + (10:42:30, 7 January 2025)
- HNP-99-143, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations + (10:42:32, 7 January 2025)
- TAC:MA0918 + (10:42:34, 7 January 2025)
- TAC:MA4432 + (10:42:35, 7 January 2025)
- ML18017A885 + (10:42:35, 7 January 2025)
- ML18017A884 + (10:42:36, 7 January 2025)
- HNP-99-140, Provides Notification That RO Licensed on Harris Plant No Longer Meets Requirements of 10CFR50.21,effective 990826. Name,Docket Number & License Number for Individual Provided in Encl.Encl Withheld,Per 10CFR2.790(a)(6) + (10:42:37, 7 January 2025)
- PMNS20171487, Pre-Subsequent License Renewal Application Meeting + (10:42:41, 7 January 2025)
- ML18017A880 + (10:42:43, 7 January 2025)
- ML18017A876 + (10:42:44, 7 January 2025)
- ML18017A874 + (10:42:47, 7 January 2025)
- 05000400/LER-1999-007-02, :on 990811,determined That Cvis ARMs High Alarm Setpoints Were Not within TS Limit.Caused by Not Having Procedure to Verify If Cvis ARM High Alarm Setpoints Were within TS Requirements.Revised Procedures.With + (10:42:49, 7 January 2025)
- HNP-99-127, Requests Relief from Section XI,IWA-5242(a) Requirement for HNP Class 2 Bolted Connections in Borated Sys.Compliance with Requirement Would Result in Unusual Difficulty Without Compensating Increase in Level of Quality & Safety + (10:42:50, 7 January 2025)
- HNP-99-137, Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With + (10:42:52, 7 January 2025)
- ML18017A861 + (10:42:55, 7 January 2025)
- ML18017A860 + (10:42:56, 7 January 2025)
- HNP-99-129, Provides Response to NRC 990805 RAI Re Amend Request to Increase Fuel Storage Capacity + (10:42:57, 7 January 2025)
- HNP-99-136, Forwards Marked Up Copy of Approved FSAR Section 17.3 with Applicable Duplicated TS Requirements,As Committed to in 990602 Application for Rev to TS + (10:43:02, 7 January 2025)
- HNP-99-130, Submits Closure Info for Rev 1,Suppl 1 to GL 92-01, Reactor Vessel Structural Integrity. Identified Discrepancies from Review of NRC Rvid Provided + (10:43:04, 7 January 2025)
- ML18017A853 + (10:43:05, 7 January 2025)