ML18017A907
| ML18017A907 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/20/1999 |
| From: | Landis K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Scarola J CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18017A908 | List: |
| References | |
| 50-400-99-11, NUDOCS 9910120271 | |
| Download: ML18017A907 (7) | |
See also: IR 05000400/1999011
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:9910120271
DOC.DATE: 99/09/20
NOTARIZED- NO
ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
LANDIS,K.D.
Region
2 (Post
820201)
RECIP.NAME
.
RECIPIENT AFFILIATION
SCAROLA,J.
Carolina Power
tc Light Co.
DOCKET
05000400
SUBJECT: Forwards insp rept 50-400/99-11
on 990719-23
violations noted.Insp
found that engineering
supported
safe
6 reliable operation of sys.
5: 0802-06.No
activites
DISTRIBDTION CODE: IEOIP
COPIES
RECEIVED:LTRI ENCLl SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
05000400 E
RECIPIENT
ID CODE/NAME
LPD2-2
INTERNAL: ACRS
DEDRO
NRR/DIPM/IIPB
NRR/DRIP/REXB
RGN2
FILE
0 1
TERNAL: LMITCO MARSHALL
NRC PDR
COPIES
LTTR ENCL
1
1
2
~
2
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
LAUFER,R.
NR~RDTP~
NUDOCS-ABSTRACT
OGC/RP
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
.1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
R
0
LOAOEOFgog
ELECTRONlC FllE
I
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
18
ENCL
18
SEPTZmZZ 20,
1999
Carolina Power and Light Company
ATTN: Mr. James Scarola
Vice President - Harris Plant
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Code: Zone
1
New Hill, NC 27562-0165
SUBJECT:
SAFETY SYSTEM DESIGN AND PERFORMANCE CAPABILITYINSPECTION
(NRC INSPECTION REPORT NO. 50-400/99-11)
Dear Mr. Scarola:
This refers to the inspection conducted on July 19 - 23 and August 2 - 6, 1999, at your Harris
facility. This was a Safety System Design and Performance Capability Inspection which was
performed in accordance with Inspection Procedure 71111.21 under the pilot plant study for the
new inspection oversight process.
The primary objective of this inspection was to assess
the
adequacy of calculations, analyses, and other engineering activities used to support operability
and reliability of the high head safety injection (HHSI) and low head safety injection (LHSI)
systems in the performance of the safety functions required by their design bases.
The results
of this inspection were discussed on August 6, 1999, with you and other members of your staff,
The inspection found that engineering activities supported the safe and reliable operation of the
systems.
No violations of NRC requirements were identified during the inspection.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures willbe placed in the NRC Public Document Room.
Docket Nos. 50<00
License Nos. NPF-63
Enclosure: NRC Inspection Report
cc w/encl: (See page 2)
Sincerely,
ORIGINAL SIGNED BY
KERRY D. LAPIS
Kerry D. Landis, Chief
Engineering Branch
Division of Reactor Safety
i012027i
9mi0920
DR
ADQCK 05000400
8
CP8L
cc w/encl:
Terry C. Morton, Manager
Performance Evaluation and
Regulatory Affairs
CPB 9
Carolina Power 8 Light Company
Electronic Mail Distribution
Chris L. Burton
Director of Site Operations
Carolina Power 8 Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
Bo Clark
Plant General Manager-Harris Plant
Carolina Power 8 Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
Donna B. Alexander, Manager
Regulatory Affairs
Carolina Power 8 Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
Johnny H. Eads, Supervisor
Licensing/Regulatory Programs
Carolina Power 8 Light Company
Shearon Harris Nuclear Power Plant
Electronic Mail Distribution
William D. Johnson
Vice President & Corporate Secretary
Carolina Power 8 Light Company
Electronic Mail Distribution
John H. O'eill, Jr.
Shaw, Pittman, Potts &Trowbridge
2300 N. Street, NW
Nfashington, DC 20037-1128
(cc w/encl cont'd - See page 3)
CP8L
(cc w/encl cont'd)
Mel Fry, Director
Division of Radiation Protection
N. C. Department of Environmental
Commerce 8 Natural Resources
Electronic Mail Distribution
Peggy Force
Assistant Attorney General
State of North Carolina
Electronic Mail Distribution
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC 29211
Chairman of the North Carolina
Utilities Commission
P. O. Box 29510
Raleigh, NC 27626-0510
Robert P. Gruber
Executive Director
Public Staff NCUC
P. O. Box29520
=
Raleigh, NC 27626
Vernon Malone, Chairman
Board of County Commissioners
of Wake County
P. O. Box 550
Raleigh, NC 27602
Richard H. Givens, Chairman
Board of County Commissioners
of Chatham County
Electronic Mail Distribution
Distribution w/encl:
R. Laufer, NRR
PUBLIC
Distribution w/encl: (See page 4)
CP8L
Distribution w/encl:
U. S. Nuclear Regulatory Commission
5421 Shearon Harris Rd.
New Hill, NC'27562-9998
OFFICE
SIGNATURE
NAME
DATE
COPYT
RI I:DRS
J
na an
/ ~ /
YES
NO
RII:
R
KLa
ls
/
/
YES
NO
RI I:DRP
BBonsar
/
/
NO
RI I:DRS
Csml t
/Ri /
YES
HO
RI I:DRS
HT omas
/ ta
/
HO
RI I:DRS
'NK olhsor9c
/ ~
/
NO
RI I:DRS
ANU'tt
/
/
YES
HO
OFFICIAL RECORD
DOCUNEHT NAHE:
SIGNATURE
NAME
DATE
OLEY
/Pc) /99
9/
/99
9/
/99
9/
/99
9/
/99
OFFICIALRECORD COPY
DOCUMENT NAME: S:>DRSIEB>HAR99115.wpd