Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205F209 + (23:39:03, 7 December 2024)
- ML20205F207 + (23:39:04, 7 December 2024)
- ML20205F206 + (23:39:04, 7 December 2024)
- ST-HL-AE-1509, Forwards Response to Draft SER or FSAR Item C 3.7-1 Re Seismic Design Confirming Frequencies of Floor Subsystems in Each Bldg Higher than Corresponding Limit.Encl marked-up FSAR Pages Will Be Incorporated in Future Amend + (23:39:05, 7 December 2024)
- ML20205F203 + (23:39:06, 7 December 2024)
- ML20205F199 + (23:39:07, 7 December 2024)
- ML20205F201 + (23:39:07, 7 December 2024)
- ML20205F198 + (23:39:08, 7 December 2024)
- ML20205F197 + (23:39:08, 7 December 2024)
- 05000352/LER-1987-006, :on 870218 & 19,control Room Ventilation Sys Isolated & Control Room Emergency Fresh Air Supply Sys Train B Initiated.Caused by Chlorine Analyzer D Falsely Indicating Chlorine Present.Ventilation Isolation Reset + (23:39:11, 7 December 2024)
- ML20205F195 + (23:39:12, 7 December 2024)
- ML20205F193 + (23:39:13, 7 December 2024)
- ML20205F191 + (23:39:14, 7 December 2024)
- ML20205F192 + (23:39:14, 7 December 2024)
- ML20205F189 + (23:39:15, 7 December 2024)
- ML20205F188 + (23:39:15, 7 December 2024)
- ML20205F184 + (23:39:16, 7 December 2024)
- ML20205F186 + (23:39:16, 7 December 2024)
- ML20205F183 + (23:39:17, 7 December 2024)
- 05000282/LER-1985-016, :on 851016,minor Leakage Occurred from Cooling Water Pipe.Caused by Crack from Cyclic Fatigue.Temporary Patch in Place.Permanent Repairs Formulated,Per IE Bulletin 80-24 + (23:39:18, 7 December 2024)
- ML20205F181 + (23:39:19, 7 December 2024)
- 05000348/LER-1983-029-03, /03L-0:on 830601,overpower Delta Temp Channel I Declared Inoperable Upon Receipt of Overpower Delta T Single Input Alert.Caused by Failure of Overpower Delta Temp Bistable Card.Card Replaced + (23:39:21, 7 December 2024)
- ML20205F178 + (23:39:22, 7 December 2024)
- ML20205F177 + (23:39:23, 7 December 2024)
- IR 05000387/1987004 + (23:39:24, 7 December 2024)
- ML20205F174 + (23:39:26, 7 December 2024)
- ML20205F172 + (23:39:27, 7 December 2024)
- ML20205F173 + (23:39:27, 7 December 2024)
- ML20205F171 + (23:39:28, 7 December 2024)
- ML20205F165 + (23:39:29, 7 December 2024)
- ML20205F166 + (23:39:29, 7 December 2024)
- ML20205F164 + (23:39:30, 7 December 2024)
- ML20205F163 + (23:39:31, 7 December 2024)
- ML20205F161 + (23:39:32, 7 December 2024)
- ML20205F160 + (23:39:33, 7 December 2024)
- ML20205F159 + (23:39:34, 7 December 2024)
- ML20205F158 + (23:39:35, 7 December 2024)
- ML20205F156 + (23:39:36, 7 December 2024)
- ML20205F151 + (23:39:37, 7 December 2024)
- ML20205F153 + (23:39:37, 7 December 2024)
- ML20205F150 + (23:39:38, 7 December 2024)
- ML20205F149 + (23:39:39, 7 December 2024)
- 05000281/LER-1999-001-02, :on 990301,RPS Relay Not Placed in Trip Resulted in Violation of TS 3.7.Caused by Lack of Procedural Guidance.Developed New Procedure to Provide More Explicit Instructions for Placing Stop Valve in Relay Trip + (23:39:41, 7 December 2024)
- ML20205F146 + (23:39:42, 7 December 2024)
- ML20205F145 + (23:39:43, 7 December 2024)
- ML20205F144 + (23:39:43, 7 December 2024)
- ML20205F141 + (23:39:44, 7 December 2024)
- ML20205F139 + (23:39:45, 7 December 2024)
- ML20205F136 + (23:39:58, 7 December 2024)
- ML20205F135 + (23:39:59, 7 December 2024)
- ML20205F133 + (23:40:05, 7 December 2024)