Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205G256 + (21:15:15, 7 December 2024)
- IR 05000255/1985023 + (21:15:18, 7 December 2024)
- IR 05000461/1988025 + (21:15:19, 7 December 2024)
- ML20205G250 + (21:15:19, 7 December 2024)
- ML20205G249 + (21:15:20, 7 December 2024)
- ML20205G242 + (21:15:31, 7 December 2024)
- 05000483/LER-1985-044, :on 851003,07 & 08,ESF Actuated as Result of Steam Generator Levels Above hi-hi Trip Setpoint.Caused by Abnormal Component Conditions.Plant Placed in Stable Configuration.Startup Procedures to Be Revised + (21:15:33, 7 December 2024)
- ML20205G236 + (21:15:34, 7 December 2024)
- ML20205G235 + (21:15:35, 7 December 2024)
- 05000333/LER-1999-001-01, Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments + (21:15:38, 7 December 2024)
- ML20205G231 + (21:15:39, 7 December 2024)
- ML20205G229 + (21:15:41, 7 December 2024)
- RA-99-0071, Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld + (21:15:41, 7 December 2024)
- ML20205G224 + (21:15:42, 7 December 2024)
- ML20205G221 + (21:15:43, 7 December 2024)
- ML20205G217 + (21:15:44, 7 December 2024)
- ML20205G219 + (21:15:44, 7 December 2024)
- ML20205G216 + (21:15:45, 7 December 2024)
- ML20205G214 + (21:15:45, 7 December 2024)
- ML20205G212 + (21:15:46, 7 December 2024)
- ML20205G206 + (21:15:48, 7 December 2024)
- ML20205G207 + (21:15:48, 7 December 2024)
- 05000483/LER-1985-043, :on 851003,while Plant in Hot Standby,Hourly Firewatch Patrol Insp of Portion of Area Performed 1 H & 25 Minutes After Sprinkler Sys Declared Inoperable.Caused by Personnel Error.Personnel Retrained + (21:15:50, 7 December 2024)
- 05000334/LER-1988-014, :on 880923,steam Driven Auxiliary Feedwater Pump Spuriously Started.Caused by Personnel Error.Mod of Motor Driven Auxiliary Feedpump Starting Circuit to Prevent Similar Spurious Actions Performed + (21:15:54, 7 December 2024)
- ML20205G200 + (21:15:55, 7 December 2024)
- ML20205G201 + (21:15:55, 7 December 2024)
- ML20205G199 + (21:15:56, 7 December 2024)
- ML20205G197 + (21:15:56, 7 December 2024)
- ML20205G196 + (21:15:57, 7 December 2024)
- PNO-IV-87-013, discovered Evidence That UF6 Shipping Cylinders Have Stiffening Rings Fabricated from Matl Not Meeting Requirements of ANSI N 14.1-1971.Licensee Visual Insp of Cylinders Revealed No Defects + (21:15:58, 7 December 2024)
- ML20205G189 + (21:16:08, 7 December 2024)
- ML20205G187 + (21:16:09, 7 December 2024)
- ML20205G188 + (21:16:09, 7 December 2024)
- ML20205G185 + (21:16:11, 7 December 2024)
- ML20205G186 + (21:16:11, 7 December 2024)
- ML20205G180 + (21:16:13, 7 December 2024)
- ML20205G173 + (21:16:14, 7 December 2024)
- ML20205G175 + (21:16:14, 7 December 2024)
- B12470, Forwards Revised Responses to Generic Ltr 83-28,Items 3.1.1, 3.1.2,3.2.1,3.2.2 & 4.5.1 Re post-maint Testing (Reactor Trip Sys Components & All Other safety-related Components) & Reactor Trip Sys Reliability,Per NRC 870310 Request + (21:16:15, 7 December 2024)
- ML20205G172 + (21:16:15, 7 December 2024)
- ML20205G170 + (21:16:16, 7 December 2024)
- PNO-II-87-019A, on 870322,NRC Informed That Insp & NDT of Reactor Head Closure Studs Indicated Exterior Corrosion & Evidence of Internal Thread Wasting.Reactor Head Will Be Removed for Insp + (21:16:16, 7 December 2024)
- ML20205G166 + (21:16:17, 7 December 2024)
- ML20205G162 + (21:16:18, 7 December 2024)
- ML20205G159 + (21:16:19, 7 December 2024)
- ML20205G156 + (21:16:21, 7 December 2024)
- ML20205G154 + (21:16:48, 7 December 2024)
- ML20205G153 + (21:16:49, 7 December 2024)
- PNO-III-87-042, on 870322,reactor Scrammed Manually Due to Control Rod Movement Into Reactor Core.Caused by Unexpected Isolation Valve Closure in Instrument Air Sys.Plant Will Be Shutdown for Several Days for Maint + (21:16:50, 7 December 2024)
- ML20205G146 + (21:16:58, 7 December 2024)
- ML20205G144 + (21:16:58, 7 December 2024)
- ML20205G139 + (21:16:59, 7 December 2024)