Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205K008 + (20:41:49, 7 December 2024)
- SVP-99-025, Transmits Remediation Plan for Plant Intergranular Stress Corrosion Cracking Susceptible Welds,Per GL 88-01.Encl Includes Util Assessment of Recirculation Suction Valve, 1-0202-4A + (20:41:49, 7 December 2024)
- ML20205K006 + (20:41:50, 7 December 2024)
- SVP-99-062, Informs NRC of Rev to Schedule for Analytically Demonstrating That Cumulative Usage Factor for Reactor Vessel Head Closure Studs Will Remain Below 1.0 for Remainder of Current License Period + (20:41:51, 7 December 2024)
- 05000498/LER-1988-053, :on 880920,NRC Notified That Gaseous Effluent Radiation Monitor Alarm Setpoints Not Calculated in Accordance W/Offsite Dose Calculation Manual.Caused by Inadequate Review of Manual Rev + (20:41:53, 7 December 2024)
- 05000423/LER-1986-004, :on 860123,plant Went from Hot Standby Mode to Startup Mode Contrary to Tech Spec Action Statement.Caused by Operator Misinterpretation of Tech Specs.Event Reviewed W/Licensed Senior Operator + (20:41:55, 7 December 2024)
- 05000388/LER-1986-001-01, :on 860121,during Startup,Reactor Scrammed When Vessel Water Level Dropped to Plus 13 Inches.Caused by Operator Failing to Notice Turbine Bypass Valves Opened. Procedures Revised.Alarms Will Be Installed + (20:41:58, 7 December 2024)
- ML20205J991 + (20:41:59, 7 December 2024)
- ML20205J993 + (20:41:59, 7 December 2024)
- SVP-99-038, Application for Amends to Licenses DPR-29 & DPR-30,allowing Alternate Methodology for Quantifying RCS Leakage When Normal RCS Leakage Detection Sys Is Inoperable + (20:42:00, 7 December 2024)
- ML20205J984 + (20:42:01, 7 December 2024)
- ML20205J982 + (20:42:01, 7 December 2024)
- ML20205J980 + (20:42:02, 7 December 2024)
- ML20205J974 + (20:42:03, 7 December 2024)
- ML20205J969 + (20:42:04, 7 December 2024)
- ML20205J966 + (20:42:05, 7 December 2024)
- SVP-99-001, Application for Amends to Licenses DPR-29 & DPR-30,deleting Various License Conditions That Have Been Completed,Making Editorial Changes & Providing Clarifying Info + (20:42:06, 7 December 2024)
- ML20205J964 + (20:42:06, 7 December 2024)
- ML20205J959 + (20:42:07, 7 December 2024)
- ML20205J955 + (20:42:08, 7 December 2024)
- ML20205J954 + (20:42:08, 7 December 2024)
- ML20205J951 + (20:42:09, 7 December 2024)
- ML20205J953 + (20:42:09, 7 December 2024)
- ML20205J950 + (20:42:10, 7 December 2024)
- ML20205J949 + (20:42:10, 7 December 2024)
- IR 05000483/1999001 + (20:42:12, 7 December 2024)
- ML20205J946 + (20:42:13, 7 December 2024)
- ML20205J945 + (20:42:13, 7 December 2024)
- ML20205J944 + (20:42:14, 7 December 2024)
- NG-87-1015, Responds to Violations Noted in Insp Rept 50-331/86-19 on 861202-870116.Corrective Actions:Maint Procedure MD-017 Revised to Require That Maint Engineering Be Notified of Measuring & Test Equipment Found to Be out-of-calibr + (20:42:18, 7 December 2024)
- ML20205J940 + (20:42:19, 7 December 2024)
- ML20205J938 + (20:42:20, 7 December 2024)
- ML20205J936 + (20:42:20, 7 December 2024)
- ML20205J933 + (20:42:21, 7 December 2024)
- ML20205J932 + (20:42:22, 7 December 2024)
- ML20205J931 + (20:42:22, 7 December 2024)
- ML20205J928 + (20:42:23, 7 December 2024)
- ML20205J930 + (20:42:23, 7 December 2024)
- ML20205J927 + (20:42:24, 7 December 2024)
- SVP-99-032, Application for Amend to License DPR-29,changing SR 4.6.E.2 to Allow one-time Extension of 18-month Requirement to Pressure Set Test or Replace One Half of MSSVs to Interval of 24 Months + (20:42:25, 7 December 2024)
- ML20205J924 + (20:42:25, 7 December 2024)
- ML20205J922 + (20:42:26, 7 December 2024)
- ML20205J918 + (20:42:27, 7 December 2024)
- ML20205J921 + (20:42:27, 7 December 2024)
- ML20205J915 + (20:42:29, 7 December 2024)
- L-87-140, Special Rept:On 870225,electric Driven Fire Pump Exceeded 7- Day Tech Spec Limit for Permissible Time Pump May Remain Out of Svc W/O NRC Notification.Caused by Leakage of Bearing Grease Past Seal.Shaft,Sleeves & Bearings Replaced + (20:42:30, 7 December 2024)
- ML20205J912 + (20:42:30, 7 December 2024)
- ML20205J908 + (20:42:31, 7 December 2024)
- ML20205J899 + (20:42:32, 7 December 2024)
- ML20205J895 + (20:42:33, 7 December 2024)
- ML20205J894 + (20:42:34, 7 December 2024)