Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P940 + (19:53:02, 7 December 2024)
- IR 05000397/1986016 + (19:53:03, 7 December 2024)
- IR 05000245/1988015 + (19:53:04, 7 December 2024)
- ML20205P933 + (19:53:05, 7 December 2024)
- ML20205P932 + (19:53:11, 7 December 2024)
- ML20205P929 + (19:53:15, 7 December 2024)
- SNRC-1329, LILCO,1986 Annual Rept,Including 1987 Internal Cash Flow Projection for Facility + (19:53:16, 7 December 2024)
- ML20205P927 + (19:53:16, 7 December 2024)
- ML20205P926 + (19:53:17, 7 December 2024)
- ML20205P925 + (19:53:18, 7 December 2024)
- ML20205P924 + (19:53:18, 7 December 2024)
- ML20205P923 + (19:53:19, 7 December 2024)
- ML20205P922 + (19:53:19, 7 December 2024)
- ML20205P919 + (19:53:27, 7 December 2024)
- ML20205P916 + (19:53:28, 7 December 2024)
- IR 05000293/1986017 + (19:53:31, 7 December 2024)
- ML20205P913 + (19:53:32, 7 December 2024)
- ML20205P912 + (19:53:33, 7 December 2024)
- ML20205P910 + (19:53:33, 7 December 2024)
- ML20205P909 + (19:53:34, 7 December 2024)
- ML20205P906 + (19:53:34, 7 December 2024)
- ML20205P905 + (19:53:35, 7 December 2024)
- ML20205P904 + (19:53:36, 7 December 2024)
- ML20205P903 + (19:53:36, 7 December 2024)
- ML20205P902 + (19:53:37, 7 December 2024)
- ML20205P901 + (19:53:38, 7 December 2024)
- ML20205P900 + (19:53:39, 7 December 2024)
- ML20205P899 + (19:53:40, 7 December 2024)
- 05000352/LER-1988-030, :on 881003,determined That Unit Operating in Unanalyzed Condition from Receipt of OL Until 880419.Caused by Personnel Error Due to Design Change Not Implemented During Const.Fire Damper Doors Inspected + (19:53:46, 7 December 2024)
- ML20205P897 + (19:53:47, 7 December 2024)
- ML20205P892 + (19:53:48, 7 December 2024)
- ML20205P889 + (19:53:49, 7 December 2024)
- ML20205P890 + (19:53:49, 7 December 2024)
- ML20205P888 + (19:53:50, 7 December 2024)
- ML20205P887 + (19:53:50, 7 December 2024)
- ML20205P886 + (19:53:51, 7 December 2024)
- ML20205P885 + (19:53:52, 7 December 2024)
- ML20205P884 + (19:53:52, 7 December 2024)
- ML20205P880 + (19:53:59, 7 December 2024)
- ML20205P882 + (19:53:59, 7 December 2024)
- IR 05000309/1988017 + (19:54:00, 7 December 2024)
- ML20205P877 + (19:54:01, 7 December 2024)
- ML20205P878 + (19:54:01, 7 December 2024)
- ST-HL-AE-2819, Advises That Facility Will Be Ready to Load Fuel During Wk of 881219.Ongoing Work Will Be Planned & Controlled That No Effect on Fuel Load & Subsequent Testing Anticipated.Status of Facility at Fuel Load Encl + (19:54:02, 7 December 2024)
- ML20205P875 + (19:54:03, 7 December 2024)
- ML20205P873 + (19:54:03, 7 December 2024)
- ML20205P872 + (19:54:04, 7 December 2024)
- ML20205P871 + (19:54:14, 7 December 2024)
- ML20205P870 + (19:54:14, 7 December 2024)
- ML20205P869 + (19:54:15, 7 December 2024)
- 05000498/LER-1988-056, :on 880930,determined That Two Primary Penetration Protection Circuit Breakers Not Included in Surveillance Test Program as Required by Tech Spec.Caused by Use of Licensing Basis Document + (19:54:17, 7 December 2024)