Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205S085 + (19:26:24, 7 December 2024)
- ML20205S087 + (19:26:24, 7 December 2024)
- ML20205S082 + (19:26:25, 7 December 2024)
- ML20205S083 + (19:26:25, 7 December 2024)
- ML20205S079 + (19:26:26, 7 December 2024)
- ML20205S076 + (19:26:27, 7 December 2024)
- ML20205S077 + (19:26:27, 7 December 2024)
- 05000250/LER-1986-021, :on 860502,reactor Trip Occurred During Performance of Operating Procedure OP 1004.2.Caused by Operator at Trip Override Switch Not Instructing Second Operator to Proceed to Other Train + (19:26:29, 7 December 2024)
- ML20205S071 + (19:26:30, 7 December 2024)
- ML20205S068 + (19:26:31, 7 December 2024)
- ML20205S066 + (19:26:32, 7 December 2024)
- ML20205S065 + (19:26:32, 7 December 2024)
- ML20205S062 + (19:26:33, 7 December 2024)
- ML20205S064 + (19:26:33, 7 December 2024)
- 05000352/LER-1986-021, :on 860503,inadvertent Initiation of ESF Occurred During Surveillance Testing.Caused by Improper Use of Jumpers.Jumper Removed & Fuse Replaced + (19:26:35, 7 December 2024)
- ML20205S060 + (19:26:36, 7 December 2024)
- PNO-III-87-046, on 870228,radwaste Shipment Driver Arrested for Driving While Intoxicated After Truck Slid Off Roadway While Being Parked.Replacement Driver Sent.Truck Surveyed & Escorted Back to Plant Site + (19:26:37, 7 December 2024)
- ML20205S058 + (19:26:37, 7 December 2024)
- ML20205S056 + (19:26:38, 7 December 2024)
- TXX-4840, Interim Deficiency Rept CP-86-35 Re Motor Operators for Several Valves in Main Steam Sys Procured as Manual Valves. Initially Reported on 860507.Mod of Valves & Retest of Operator Assemblies Underway.Next Rept by 860721 + (19:26:38, 7 December 2024)
- PNO-I-99-019, on 990420,Limerick Unit 1 Automatically Shutdown from 100% Power on Low Rwl Due to Loss of Mfw. Normal Feedwater Sys Has Been Restored,Which Allowed for Securing of RCIC & HPCI Systems.Licensee Issued Pr + (19:26:39, 7 December 2024)
- ML20205S054 + (19:26:40, 7 December 2024)
- ML20205S052 + (19:26:40, 7 December 2024)
- ML20205S050 + (19:26:42, 7 December 2024)
- PNO-III-99-024, on 990416,licensee Commenced Controlled Power Reduction to Approx 10% to Identify & Repair Main Generator Field Ground.Troubleshooting Efforts Are Still in Progress. Ris Monitored SD & Troubleshooting & Will Review Activities + (19:26:42, 7 December 2024)
- TXX-4833, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which Could Invalidate Portions of Jet Impingment Load Review for High Energy Piping.Initially Reported on 860305. Next Rept Expected by 860703 + (19:26:43, 7 December 2024)
- ML20205S046 + (19:26:44, 7 December 2024)
- ML20205S047 + (19:26:44, 7 December 2024)
- ML20205S045 + (19:26:45, 7 December 2024)
- ML20205S044 + (19:26:46, 7 December 2024)
- ML20205S042 + (19:26:46, 7 December 2024)
- ML20205S041 + (19:26:47, 7 December 2024)
- ML20205S039 + (19:26:47, 7 December 2024)
- ML20205S037 + (19:26:48, 7 December 2024)
- ML20205S036 + (19:26:49, 7 December 2024)
- ML20205S033 + (19:26:50, 7 December 2024)
- ML20205S035 + (19:26:50, 7 December 2024)
- ML20205S031 + (19:26:51, 7 December 2024)
- ML20205S032 + (19:26:51, 7 December 2024)
- ML20205S030 + (19:26:53, 7 December 2024)
- ML20205S029 + (19:26:53, 7 December 2024)
- ML20205S027 + (19:26:54, 7 December 2024)
- ML20205S026 + (19:26:54, 7 December 2024)
- ML20205S025 + (19:26:55, 7 December 2024)
- ML20205S024 + (19:26:56, 7 December 2024)
- ML20205S023 + (19:26:56, 7 December 2024)
- ML20205S021 + (19:26:57, 7 December 2024)
- ML20205S020 + (19:26:58, 7 December 2024)
- ML20205S018 + (19:26:58, 7 December 2024)
- ML20205S012 + (19:26:59, 7 December 2024)
- ML20205S013 + (19:26:59, 7 December 2024)
- ML20205S010 + (19:27:00, 7 December 2024)