Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20206R945 + (04:36:51, 7 December 2024)
- ML20206R943 + (04:36:52, 7 December 2024)
- ML20206R942 + (04:36:52, 7 December 2024)
- ML20206R941 + (04:36:53, 7 December 2024)
- AECM-86-280, Forwards Application Fee for NRC Review of 860904 Licensed Operator Requalification Program + (04:36:54, 7 December 2024)
- ML20206R939 + (04:36:54, 7 December 2024)
- W3P86-2507, Forwards Check in Amount of $50,000 in Payment of Civil Penalty Per NRC 860827 Order.W/O Encl + (04:36:55, 7 December 2024)
- ML20206R937 + (04:36:55, 7 December 2024)
- TXX-4885, Third Interim Deficiency Rept CP-85-50 Re Improper Welding Processes in Mfg of Cable Tray Tee Fittings.Initially Reported on 851206.Applicant Awaiting Ebasco Evaluation.Next Rept Anticipated by 861021 + (04:36:56, 7 December 2024)
- ML20206R935 + (04:36:56, 7 December 2024)
- ML20206R933 + (04:36:57, 7 December 2024)
- ML20206R931 + (04:36:58, 7 December 2024)
- ML20206R927 + (04:36:59, 7 December 2024)
- ML20206R929 + (04:36:59, 7 December 2024)
- ML20206R926 + (04:37:00, 7 December 2024)
- ML20206R925 + (04:37:02, 7 December 2024)
- ML20206R923 + (04:37:03, 7 December 2024)
- ML20206R921 + (04:37:03, 7 December 2024)
- 05000423/LER-1987-014, :on 870322,while in Cold Shutdown Mode 5,during Surveillance Testing,Train Emergency Diesel Generator B Failed to Start within 10 S.Caused by Buildup of Dirt/Rust in Main Air Start Valves.Valves Replaced + (04:37:05, 7 December 2024)
- ML20206R919 + (04:37:07, 7 December 2024)
- ML20206R916 + (04:37:11, 7 December 2024)
- PNO-I-86-046, on 860627,two Packages Containing Two Dose Units of 20 Mci Xe-133 & One Dose Unit of 12 Mci Ga-67 Fell Out of Truck During Transport.Matl Believed to Be in Inaccessible Dense Underbrush.Safety Hazard Minimal + (04:37:11, 7 December 2024)
- ML20206R915 + (04:37:12, 7 December 2024)
- ML20206R914 + (04:37:13, 7 December 2024)
- ML20206R913 + (04:37:13, 7 December 2024)
- ML20206R912 + (04:37:14, 7 December 2024)
- ML20206R911 + (04:37:15, 7 December 2024)
- ML20206R910 + (04:37:15, 7 December 2024)
- ML20206R909 + (04:37:16, 7 December 2024)
- ML20206R908 + (04:37:16, 7 December 2024)
- ML20206R905 + (04:37:17, 7 December 2024)
- TXX-4877, Interim Deficiency Rept CP-85-26 Re Upper Lateral Restraint Embedment Design.Initially Reported on 850719.Concern Being Evaluated Under Comanche Peak Review Team Program Plan Item V.B.Next Rept Will Be Submitted by 860815 + (04:37:18, 7 December 2024)
- ML20206R904 + (04:37:18, 7 December 2024)
- ML20206R900 + (04:37:19, 7 December 2024)
- 05000423/LER-1987-013, :on 870321,discovered 120-volt Ac Nonvital Circuit Entering Containment Did Not Have Secondary Penetration Conductor Overcurrent Protection.Caused by Personnel Error.Protection Installed & Tested + (04:37:21, 7 December 2024)
- 05000482/LER-1986-030, :on 860604,feedwater Isolation Signal Initiated on High Water Level in Steam Generator C,Closing Feedwater Isolation Valves & Tripping Main Feedwater Pump B.Caused by Leakage in Main Feedwater Control Valves + (04:37:23, 7 December 2024)
- ML20206R896 + (04:37:24, 7 December 2024)
- ML20206R893 + (04:37:25, 7 December 2024)
- ML20206R890 + (04:37:25, 7 December 2024)
- ML20206R889 + (04:37:26, 7 December 2024)
- ML20206R888 + (04:37:27, 7 December 2024)
- ML20206R887 + (04:37:28, 7 December 2024)
- ML20206R885 + (04:37:28, 7 December 2024)
- ST-HL-AE-2082, Forwards Requested Addl Info & Justification for Proof & Review Tech Spec Sections 3.4.3/3/4 4-9,3.5.1/3/4 5-1 & 3.4.9.2/3/4 4-35 Re Fracture Toughness & Stress Analysis for Pressurizer to Delineate Basis for Accumulator Vol Range + (04:37:29, 7 December 2024)
- ML20206R883 + (04:37:30, 7 December 2024)
- W3P87-1010, Forwards Response to Violation 8628-01 Noted in Insp Rept 50-382/86-28.Corrective Actions:Procedure ME-7-002 Revised to Require Removal of Any Shorting Blocks That Could Have Been Previously Installed + (04:37:30, 7 December 2024)
- ML20206R880 + (04:37:31, 7 December 2024)
- ML20206R879 + (04:37:31, 7 December 2024)
- ML20206R878 + (04:37:32, 7 December 2024)
- ML20206R877 + (04:37:33, 7 December 2024)
- ML20206R874 + (04:37:34, 7 December 2024)