See also: IR 05000361/1986011
Text
.
.
.
JUN 2 01986
Docket Nos. 50-361, 50-362
Southern California Edison Company
P. O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 92770
Attention:
Mr. Kenneth P. Baskin, Vice President
Nuclear Engineering Safety and Licensing
Gentlemen:
This refers to the routine inspection conducted by Messrs. F. R. Huey, J. P.
Stewart, A. D'Angelo, J. E. Tatum, and Ms. R. C. Tang of this office during
the period of March 28 through May 12, 1986 of activities authorized by NRC
License Nos. NPF-10 and NPF-15 and to the discussion of our findings held by
the inspectors with Mr. H. B. Ray and other members of the Southern California
Edison staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, enclosed herewith as Appendix A.
Your response to this Notice is to be submitted in accordance with the
provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.
In accordance with 10 CFR 2.790(a), a copy of this letter, the enclosure, and
your response will be placed in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
y.
pp
ADO
p
G _l N '
I(
\\
/
){LJ)
f
. - - - -
-
.
.
JUN 2 01986
-2-
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
L
h
,
A. E. Ch ffee, Chief
Reactor Projects Branch
Enclosures:
1.
2.
Inspection Reports:
Nos. 50-361/86-11
50-362/86-11
cc w/ Enclosures:
D. J. Fogarty, Executive Vice President
H. B. Ray, Vice President (San Clemente)
H. E. Morgan, Station Manager (San Clemente)
State of California
bec w/ enclosures:
RSB/ Document Control Desk (RIDS)
Resident Inspector
Project Inspector
G. Cook, RV
B. Faulkenberry, RV
J. Martin, RV
bec w/o enclosure 2:
LFMB
Region V/ dot
E
P
Ion
affee
um
y
i
art
elo
um
!
6/20/86
6/2o/86
6/3o/86
6/ Eg86
6/2o/86
6/>/86
6/oP/86
a
l
(
!
-
.
_
- _ .