Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102B313 + (05:40:17, 6 January 2025)
- ML18102B311 + (05:40:18, 6 January 2025)
- ML18102B308 + (05:40:19, 6 January 2025)
- ML18102B307 + (05:40:20, 6 January 2025)
- ML18102B306 + (05:40:20, 6 January 2025)
- ML18102B304 + (05:40:21, 6 January 2025)
- LR-N970234, Forwards Description of Scope,Methodology & Schedule for Design/Licensing Bases Review Project + (05:40:25, 6 January 2025)
- LR-N970298, Forwards Description of Proposed TS Changes Identified by Pse&G Which Do Not Impact Restart or Operation of Units + (05:40:27, 6 January 2025)
- ML18102B295 + (05:40:34, 6 January 2025)
- IR 05000311/1996081 + (05:40:35, 6 January 2025)
- 05000272/LER-1996-038, :on 961210,switchgear Penetration Area Ventilation Could Not Maintain Design Temps.Caused Because Switchgear Penetration Area Ventilation Sys Failure Modes Not Properly Established.Room Temp Monitored + (05:40:37, 6 January 2025)
- LR-N970297, Notifies NRC of Commitment Rev Re Installation of Two Multipoint Recorders Supplied by Leads & Northrup, Including Backup CET Displays Into EOPs.NUREG-0737 II.F.2 Required Use of CET Temp in EOPs as Listed + (05:40:38, 6 January 2025)
- ML18102B287 + (05:40:40, 6 January 2025)
- TAC:M94448 + (05:40:41, 6 January 2025)
- ML18102B284 + (05:40:42, 6 January 2025)
- LR-N970299, Requests That Restart Assessment Team Insp Commence During Preceding Wk of 970608 + (05:40:43, 6 January 2025)
- 05000311/LER-1997-006-02, :on 970404,seismic Adequacy of Svc Water Header Was Invalidated Due to Unclear Work Instructions.Piping Has Been Reinstalled Correctly + (05:40:45, 6 January 2025)
- 05000311/LER-1997-004-02, :on 970408,failed to Comply W/Ts Action Statement,Dg Start & Inadequate Surveillance Testing Due to Inadequate Tracking of Inoperable Equipment by Shift Personnel.Procedures Were Revised + (05:40:48, 6 January 2025)
- ML18102B278 + (05:40:49, 6 January 2025)
- ML18102B275 + (05:40:50, 6 January 2025)
- ML18102B272 + (05:40:51, 6 January 2025)
- ML18102B269 + (05:40:52, 6 January 2025)
- ML18102B267 + (05:40:54, 6 January 2025)
- ML18102B265 + (05:40:55, 6 January 2025)
- ML18102B263 + (05:40:56, 6 January 2025)
- LR-N970269, Suppl Info to Util 970211 Application for Amends to Licenses DPR-70 & DPR-75,revising TS for Chilled Water Sys - Auxiliary Bldg Subsystem.Ref to Radiation Monitoring Signal Removed from Bases Section + (05:40:57, 6 January 2025)
- ML18102B260 + (05:41:00, 6 January 2025)
- ML18102B258 + (05:41:01, 6 January 2025)
- LR-N970271, Provides 30 Day Response to GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations. Written Response Items 1 & 2 of Requested Info Section Will Be Provided by 970730 + (05:41:02, 6 January 2025)
- ML18102B256 + (05:41:06, 6 January 2025)
- ML18102B255 + (05:41:07, 6 January 2025)
- ML18102B252 + (05:41:08, 6 January 2025)
- LR-N970273, Submits Suppl to 970131 & 0314 Applications for Amends to Licenses DPR-70 & DPR-75,revising TS on Pressurizer Power Operated Relief Valves.Suppl Issued to State That Conclusion of NSHC Remains Valid + (05:41:09, 6 January 2025)
- ML18102B250 + (05:41:11, 6 January 2025)
- BVY 18-012, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3), 10CFR71.106 and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G + (05:41:14, 6 January 2025)
- PMNS20180480, Clarification of AMP Changes for Seabrook License Renewal + (05:41:16, 6 January 2025)
- GO2-18-047, Registration of Spent Fuel Cask Use + (05:41:18, 6 January 2025)
- ML18102B236 + (05:41:19, 6 January 2025)
- ML18102B235 + (05:41:20, 6 January 2025)
- PMNS20180328, Pre-Subsequent License Renewal Application Meeting - Safety + (05:41:21, 6 January 2025)
- ML18102B225 + (05:41:24, 6 January 2025)
- ML18102B223 + (05:41:25, 6 January 2025)
- ML18102B221 + (05:41:26, 6 January 2025)
- RS-18-041, Response to Request for Additional Information Regarding Request for Relief (I4R-07) for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened . + (05:41:27, 6 January 2025)
- EPID:L-2018-LRM-0020 + (05:41:32, 6 January 2025)
- ML18102B212 + (05:41:33, 6 January 2025)
- ML18102B209 + (05:41:34, 6 January 2025)
- ML18102B203 + (05:41:35, 6 January 2025)
- ML18102B192 + (05:41:36, 6 January 2025)
- ML18102B179 + (05:41:38, 6 January 2025)
- NRC 2018-0001, Transmittal of Construction Truss License Amendment Request Document + (05:41:39, 6 January 2025)