Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18102B637 + (05:30:53, 6 January 2025)
- LR-N970664, Responds to 970919 RAI Re Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis-Accident Conditions + (05:30:54, 6 January 2025)
- ML18102B635 + (05:30:57, 6 January 2025)
- ML18102B634 + (05:30:58, 6 January 2025)
- ML18102B633 + (05:30:59, 6 January 2025)
- ML18102B632 + (05:31:00, 6 January 2025)
- ML18102B629 + (05:31:01, 6 January 2025)
- LR-N970682, Monthly Operating Rept for Sept 1997 for Salem,Unit 2 + (05:31:03, 6 January 2025)
- ML18102B628 + (05:31:03, 6 January 2025)
- LR-N970681, Monthly Operating Rept for Sept 1997 for Salem,Unit 1 + (05:31:05, 6 January 2025)
- LR-N970652, Discusses Status of Proposed TS Changes Re Component Cooling Water Pump + (05:31:07, 6 January 2025)
- ML18102B624 + (05:31:09, 6 January 2025)
- LR-N970660, Submits Response to Violations Noted in Insp Repts 50-272/97-16 & 50-311/97-16.Corrective Actions:Appropriate Personnel Being Held Accountable for Actions in Accordance W/Util Disciplinary Policy + (05:31:10, 6 January 2025)
- ML18102B622 + (05:31:10, 6 January 2025)
- ML18102B620 + (05:31:12, 6 January 2025)
- LR-N970619, Application for Amend to License DPR-70,modifying Pressure Isolation Valve Lco,Lco Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 + (05:31:13, 6 January 2025)
- 05000311/LER-1997-003-03, :on 970909,loss of Fire Protection Water to Auxiliary Bldgs & Containments Was Noted.Caused by Human Error Due to Inattention to Detail.Loss Prevention Tours Have Been Revised + (05:31:17, 6 January 2025)
- ML18102B616 + (05:31:19, 6 January 2025)
- ML18102B614 + (05:31:22, 6 January 2025)
- IR 05000272/1997009 + (05:31:23, 6 January 2025)
- ML18102B611 + (05:31:25, 6 January 2025)
- ML18102B610 + (05:31:26, 6 January 2025)
- 05000311/LER-1997-012-03, :on 970907,declared Reactor Coolant Loop 24 Overtemperature Differential Temp Inoperable Due to Differential Temp Being Lower than Acceptable.Returned Loop 23 Pressure Instrumentation to Service + (05:31:29, 6 January 2025)
- ML18102B608 + (05:31:31, 6 January 2025)
- LR-N970627, Application for Amend to License DPR-70,changing TS for LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys + (05:31:32, 6 January 2025)
- LR-N970645, Provides Current Status of Actions Implemented in Response to NRC Readiness Assessment Team Insp Rept,Conducted 970609- 23 & 0709-11.Commitment Matrix Re Closure of Insp,Encl + (05:31:35, 6 January 2025)
- 05000311/LER-1997-013-01, :on 970902,unplanned Entry Into TS 3.0.3 Was Noted Due to Two Inoperable Pressurizer Level Channels. Caused by Error in RCS P&ID Drawing.Pressurizer Channel I Was Restored within Six Minutes of Event + (05:31:38, 6 January 2025)
- IR 05000272/1997014 + (05:31:40, 6 January 2025)
- 05000311/LER-1997-011-01, :on 970902,improper Scheduling of Staggered Surveillance Testing Was Noted.Caused by Personnel Error. Personnel Involved Have Been Held Accountable IAW Disciplinary Policies & Addl Training Provided + (05:31:42, 6 January 2025)
- LR-N970649, Special Rept 97-02:on 970909,isolation of Fire Protection Water to Plant Auxiliary Bldgs & Containments Occurred Due to Closure of Valves 1PF186 & 1PF187.Valves Opened on 970916 & Locally Verified Open by Loss Prevention Personnel + (05:31:43, 6 January 2025)
- ML18102B599 + (05:31:46, 6 January 2025)
- LR-N970644, Submits Response to Violations Noted in Insp Repts 50-272/97-12 & 50-311/97-12.Corrective Actions:Util Revising Commitment to Implement Rev & Training on Procedure Changes from 970930 to 971114 + (05:31:48, 6 January 2025)
- ML18102B597 + (05:31:48, 6 January 2025)
- LR-N970625, Submits Startup Repts for Salem Unit 1 Cycles 9 & 10 & Salem Unit 2 Cycles 6 & 7.Summary Rept of Plant Startup & Power Escalation Testing for Cycles Generated & Provided as Attachment 1 to Ltr + (05:31:51, 6 January 2025)
- ML18102B592 + (05:31:54, 6 January 2025)
- ML18102B591 + (05:31:55, 6 January 2025)
- IR 05000272/1997015 + (05:31:59, 6 January 2025)
- ML18102B588 + (05:32:01, 6 January 2025)
- ML18102B587 + (05:32:02, 6 January 2025)
- ML18102B586 + (05:32:03, 6 January 2025)
- 05000272/LER-1997-010-01, :on 970819,position Indication Sys Were Shutdown as Required by Ts.Caused by Deficiencies in Design, Mfg Const/Installation.Successfully Recalibrated Rod Position Indication Sys + (05:32:05, 6 January 2025)
- LR-N970620, Monthly Operating Rept for Aug 1997 for Salem Unit 1.W/ + (05:32:07, 6 January 2025)
- LR-N970621, Monthly Operating Rept for Aug 1997 for Salem,Unit 2 + (05:32:09, 6 January 2025)
- IR 05000272/1997005 + (05:32:14, 6 January 2025)
- IR 05000272/1997016 + (05:32:39, 6 January 2025)
- ML18102B578 + (05:32:41, 6 January 2025)
- ML18102B576 + (05:32:42, 6 January 2025)
- IR 05000272/1997002 + (05:32:43, 6 January 2025)
- LR-N970542, Forwards Response to NRC Re Violations Noted in Insp Repts 50-272/97-14 & 50-311/97-14 on 970622-0726. Corrective Actions:On 970702 Follow Up Test Was Performed Satisfactorily + (05:32:45, 6 January 2025)
- ML18102B573 + (05:32:48, 6 January 2025)
- LR-N970566, Requests That 13 Listed Candidates Take PWR Gfes of Operator Licensing Exam to Be Administered 971008.All Candidates Are Enrolled in Sngs SRO & RO Initial License Training Program + (05:32:49, 6 January 2025)