Forwards Insp Repts 50-272/97-15 & 50-311/97-15 on 970727-0907.No Violations Noted.Maint Planning Weaknesses Noted During Troubleshooting of Pressurizer Level Transmitter.Understands That Util Initiated Review of Plan
ML18102B588
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/24/1997
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18102B589 List:
References
50-272-97-15, 50-311-97-15, NUDOCS 9710010427
Download: ML18102B588 (3)


See also: IR 05000272/1997015

Text

'""-

-;., ,.

  • -

Mr. Leon R. Eliason

Chief Nuclear Officer and President

Nuclear Business Unit

Public Service Electric and Gas Company

Post Office Box 236

Hancocks Bridge, NJ 08038

September 24, 1997

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-272/97-15, 50-311/97-15

Dear Mr. Eliason:

On September 7, 1997, the NRC completed an inspection at your Salem 1 & 2 reactor

facilities. The enclosed report presents the results of that inspection.

During the 6-week period covered by this inspection report, your conduct of activities at

the Salem facilities was generally characterized by safety-conscious operations, sound

engineering and maintenance practices, and careful radiological work controls. On August

6, * 1997, you gained NRC approval for the restart of Salem Unit 2 and Confirmatory Action

Letter 1-95-009 was modified. Unit 2 achieved criticality on August 17. Overall,

personnel and plant management controlled the reactor start-up evolutions well. The

operating crews were attentive, used excellent communication skills and appropriately

addressed all issues and challenges. In addition, management provided strong oversight

and self assessment of plant activities. However, maintenance planning weaknesses were

identified during the troubleshooting of a pressurizer level transmitter. We were particularly

concerned about the decision to enter the Unit 2 biological shield to isolate the .level

transmitter when acceptable alternatives were available that would have significantly

reduced the workers' exposure. We understand that you acknowledge that the decision

was not appropriate and have initiated an action request to review the troubleshooting

plan.

  • No reply to this letter is required, and your cooperation with us is appreciated.

In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosures. will be placed in the NRC Public Document Room (PDR).

9710010427 970924

PDR

ADOCK 05000272

G

PDR

Sincerely,

rejects Branch

Division of Reactor Projects

I llllll 111111111111111111111111111111111

  • QQ6C9B*

IE01

Mr. Leon R. Eliason

Docket Nos.: 50-272, 50-311

License Nos: DPR-70, DPR-75

2

Enclosure:

Inspection Report 50-272/97-15, 50-311/97-15

cc w/encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

A. F. Kirby, Ill, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

J. J. Keenan, Esquire

M. Wetterhahn, Esquire

J. A. Isabella, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

Mr. Leon R. Eliason

Distribution w/encl:

Region I Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

H. Miller, RA

W. Axelson, DRA

C. O'Daniell, DRP

J. Linville, DRP

S. Barber, DRP

L. Harrison, DRP

G. Kelly, DRS

N. Della Greca, DRS

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

L. Olshan, NRR

W. Dean, OEDO

J. Stolz, PDl-2, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR

D. Taylor, NRR

DOCDESK

3

. DOCUMENT NAME: G:\\BRANCH3\\IR971515.SAL

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment/enclosure

"E" = Copy with attachment/enclosure

"N" = No copy

NAME

Evans/meo

DATE

9/24/97