Notice of Violation from Insp on 970614-0725.Violation noted:post-modification Test Procedures for Plant Advanced Digital Feedwater Control Sys Were Not Followed,As Evidenced by Listed Examples
ML18102B578
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/17/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML18102B577 List:
References
50-311-97-16, NUDOCS 9709220136
Download: ML18102B578 (2)


Text

NOTICE OF VIOLATION Public Service Electric and Gas Company Salem Nuclear Generating Station Docket No:

50-311 License No: DPR-75 Unit 2 During an NRC inspection conducted on June 14 to July 25, 1997, violations of NRC requirements were identified. In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," NUREG-1600, the violations are listed below:

Appendix 8, Criterion V of 10 CFR 50 requires that activities affecting quality be prescribed by procedures and shall be accomplished in accordance with those procedures.

Procedure SH.Pl-AP.ZZ-0012(0), Rev. 0, "Modification Tes~ Program,"

Section 5.2.1.I states that the Test Engineer is responsible for verifying that prerequisites are complete prior to testing. Section 5.2.2 states that test performers are responsible for performing test steps and making appropriate data entries.

Procedure SC.SE-AP.ZZ-0002(0), Rev. 0, "Conduct of Testing," Section 5.2.2 requires test instructions to be followed.

Contrary to the above, post-modification test procedures for the Salem Advanced Digital Feedwater *Control System were not followed, as evidenced by the following examples:

1.

On or about June 15, 1997, at the start of Procedure 2EC-3178, Package No. 1, STP-2, Revision 2, "Advanced Digital Feedwater Control System Power Ascension Testing," Section 5.5.1, "Mode 5 Signal Sampling," no prerequisites were signed off as having been verified.

2.

On June 15, 1997, prior to the start of Procedure 2EC-3178, Package No. 1, STP-2, Revision 2, "Advanced Digital Feedwater Control System Power Ascension Testing," Section 5.5.2, "MS 10 Dynamic Tuning," Prerequisite 5.2.1, requiring all pre-operational testing in accordance with [DCPJ test sections 10.1 through 10.9 and STP-001 was signed off indicating completion, even though STP-001 had not been completed.

This is a Severity Level IV problem (Supplement I).

9709220136 970917 PDR ADOCK 05000272 Q

PDR

Notice of Violation 2

Pursuant to the provisions of 10 CFR 2.201, Pubic Service Electric and Gas Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555 with a copy to the Regional Administrator, Region I, and a copy to the NRC Resident Inspector at the facility that is the subject of this Notice, within 30 days of the date of the-letter transmitting this Notice of Violation (Notice). This reply should be clearly marked as a "Reply to a Notice of Violation" and should inclu~e for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Your response may reference or include previous docket"ed correspondence, if the correspondence adequately addresses the required response. If an adequate reply is not received within the time specified in this Notice, an order or a Demand for Information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards information so that it can be placed in the PDR without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information. If you request withholding of such material, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2. 790(b) to support a request for withholding confidential commercial or financial information). If safeguards information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Dated at King of Prussia, Pennsylvania this ~day of.sept. 1997.