Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1996-006-01, :on 960717,determined That non-radioactive Liquid Basin Radwaste Monitor Inoperable During Low Head Conditions.Caused by Inadequate Design Change Package.Design Change 1EC3663-01 Has Been Installed.With + (05:11:53, 6 January 2025)
- ML18106A878 + (05:11:54, 6 January 2025)
- LR-N980358, Application for Amends to Licenses DPR-70 & DPR-75,modifying TSs 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity + (05:11:55, 6 January 2025)
- LR-N98-0436, Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With + (05:11:56, 6 January 2025)
- LR-N98-0435, Monthly Operating Rept for Aug 1998 for Salem Unit 1.With + (05:11:58, 6 January 2025)
- ML18106A873 + (05:12:00, 6 January 2025)
- ML18106A872 + (05:12:01, 6 January 2025)
- TAC:MA1968 + (05:12:02, 6 January 2025)
- ML18106A870 + (05:12:03, 6 January 2025)
- IR 05000272/1998099 + (05:12:05, 6 January 2025)
- ML18106A866 + (05:12:07, 6 January 2025)
- ML18106A865 + (05:12:08, 6 January 2025)
- LR-N980419, Forwards for NRC Approval,Request Change to Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Pse&G Requests Approval of Change by 981015 + (05:12:09, 6 January 2025)
- ML18106A861 + (05:12:11, 6 January 2025)
- LR-N980422, Special Rept:On 980816,RMS Channel 1R15 Inoperable for Greater than Seven Days.Cause Is Under Investigation. Replacement of Detector Assembly W/Higher Temperature Rated Detector to Mitigate Effects to Be Completed by 981019 + (05:12:12, 6 January 2025)
- TAC:MA0489 + (05:12:14, 6 January 2025)
- ML18106A857 + (05:12:15, 6 January 2025)
- LR-N980409, Forwards FFD Performance Data Rept for Six Month Period Ending 980630,IAW Requirements of 10CFR26.71(d) + (05:12:16, 6 January 2025)
- 05000311/LER-1998-007-01, :on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Cause of Event Has Not Yet Been Determined.Assembled Root Cause Team & Replaced Affected Tubing + (05:12:19, 6 January 2025)
- 05000311/LER-1998-011-01, :on 980803,ESFA During a 4KV Automatic Transfer Test Was Noted.Caused by Premature Release of Control Console Pushbutton Due to Inadequate Procedural Step.Revised Procedure + (05:12:21, 6 January 2025)
- ML18106A850 + (05:12:22, 6 January 2025)
- ND-18-0433, Voggle Electric Generating Plant Unit 3 and Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.3.10.05a.1 (Index Number 437) + (05:12:23, 6 January 2025)
- IR 05000272/1998005 + (05:12:24, 6 January 2025)
- LR-N980364, Requests That Investigation Rept Re Salem LER 272/94-016-00 Be Returned in Sealed Envelope Marked Confidential to Listed Address + (05:12:25, 6 January 2025)
- ML18106A844 + (05:12:28, 6 January 2025)
- 05000311/LER-1998-009-01, :on 980810,failure to Post Continuous Firewatch as Required by Fire Protection Plan Noted.Caused by Failure to Recognize Concurrent Conditions.Continuous Firewatch Was Posted Immediately & Repaired Smoke Detectors + (05:12:29, 6 January 2025)
- 05000311/LER-1998-012-01, :on 980725,discovered That Plant Had Operated in Modes 1 & 2 w/twenty-two AFW Pumps Inoperable.Caused by Failure to Restore Pump Runout Protection Pressure Device to Svc.Returned Subject Device to Svc + (05:12:31, 6 January 2025)
- LR-N980379, Forwards Rev 33 to Nuclear Business Unit Emergency Plan, Incorporating Rev 5 of Emergency Plan Section 15.Basis for No Reduction in Effectiveness of Plan Included in Attachment to Ltr + (05:12:32, 6 January 2025)
- ML18106A837 + (05:12:34, 6 January 2025)
- LR-N980350, Application for Amends to Licenses DPR-70 & DPR-75,modifying TS for Containment Air Locks for Salem Units 1 & 2 + (05:12:35, 6 January 2025)
- IR 05000272/1998006 + (05:13:06, 6 January 2025)
- ML18106A831 + (05:13:08, 6 January 2025)
- ML18106A829 + (05:13:09, 6 January 2025)
- ML18106A828 + (05:13:10, 6 January 2025)
- ML18106A826 + (05:13:10, 6 January 2025)
- LR-N980331, Forwards Revs 1 & 2 to Qualification Guide, Reactivity Manipulations Documentation Guide & Page from Training Procedure NC.TQ-TP.ZZ-0302, Nuclear Control Operator Training Program + (05:13:11, 6 January 2025)
- ML18106A823 + (05:13:13, 6 January 2025)
- ML18106A821 + (05:13:14, 6 January 2025)
- 05000272/LER-1998-012, :on 980715,potential to Exceed Rating of Piping Due to Isolation of Overpressure Protection Line Was Noted. Caused by Inadequate Procedural Guidance.Appropriate Operations Dept Procedures Have Been Revised + (05:13:16, 6 January 2025)
- LR-N98-0392, Monthly Operating Rept for July 1998 for Salem,Unit 1 + (05:13:17, 6 January 2025)
- LR-N98-0393, Monthly Operating Rept for July 1998 for Salem,Unit 2 + (05:13:18, 6 January 2025)
- 05000311/LER-1998-010-01, :on 980714,determined That Leakage from Boron Injection Tank Exceeded Max Allowable ECCS Leakage from Sources Outside Containment.Caused by Leaking 2SJ404 Manual Sample valve.2SJ404 Valve Repaired + (05:13:21, 6 January 2025)
- LR-N980348, Submits Response to NRC 980611 RAI Re GL 92-01,rev 1, Suppl 1, Reactor Vessel Structural Integrity. Supporting Info & Rept CENPSD-1119,rev 1,encl + (05:13:23, 6 January 2025)
- ML18106A806 + (05:13:25, 6 January 2025)
- ML18106A805 + (05:13:27, 6 January 2025)
- IR 05000272/1998007 + (05:13:40, 6 January 2025)
- ML18106A802 + (05:13:41, 6 January 2025)
- LR-N980367, Responds to NRC Re Violations Noted in Insp Repts 50-272/98-06,50-311/98-06 & 50-354/98-06,respectively. Corrective Actions:Personnel Involved in Events Will Be Held Accountable IAW Pse&G Policies & Revised Procedures + (05:13:42, 6 January 2025)
- LR-N980385, Documents Agreement That Response to RAI Re GL 96-06,will Be Submitted within 90 Days of Receipt of Request Instead of 60 Days + (05:13:44, 6 January 2025)
- ML18106A799 + (05:13:46, 6 January 2025)
- TAC:M99361 + (05:13:47, 6 January 2025)