Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209C745 + (23:27:50, 6 December 2024)
- ST-HL-AE-2080, Forwards Responses to Comments Made During 870325 & 0406 Telcons Re Review of Util 870211 Responses to NRC 870116 Comments on Procedures Generation Package + (23:27:51, 6 December 2024)
- ML20209C742 + (23:27:51, 6 December 2024)
- ML20209C740 + (23:27:52, 6 December 2024)
- ML20209C737 + (23:27:53, 6 December 2024)
- ML20209C738 + (23:27:53, 6 December 2024)
- ML20209C736 + (23:27:54, 6 December 2024)
- ML20209C735 + (23:27:55, 6 December 2024)
- ML20209C734 + (23:27:56, 6 December 2024)
- ML20209C732 + (23:27:56, 6 December 2024)
- NRC-86-8739, Forwards Semiannual Monitoring Rept for Jan-June 1986, Per Tech Spec 15.7.8.4.A.Plant Releases,Environ Monitoring, Circulating Water Sys Operations & Leak Testing Included in Rept + (23:27:57, 6 December 2024)
- ML20209C729 + (23:27:58, 6 December 2024)
- B17820, Annual Rept for Jan- Dec 1998. with + (23:27:59, 6 December 2024)
- ML20209C725 + (23:27:59, 6 December 2024)
- NOC-AE-000573, Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure + (23:28:00, 6 December 2024)
- ML20209C721 + (23:28:01, 6 December 2024)
- ML20209C720 + (23:28:02, 6 December 2024)
- ML20209C718 + (23:28:03, 6 December 2024)
- NOC-AE-000498, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule + (23:28:03, 6 December 2024)
- ML20209C716 + (23:28:04, 6 December 2024)
- ML20209C715 + (23:28:05, 6 December 2024)
- ML20209C713 + (23:28:06, 6 December 2024)
- ML20209C712 + (23:28:06, 6 December 2024)
- ML20209C710 + (23:28:07, 6 December 2024)
- ML20209C707 + (23:28:08, 6 December 2024)
- ML20209C705 + (23:28:09, 6 December 2024)
- ML20209C703 + (23:28:10, 6 December 2024)
- ST-HL-AE-2099, Forwards FSAR Section 7.5-1,reflecting Downgrading to D3 Variable for Reactor Containment Fan Cooler Dp Switches for post-accident Monitoring Purposes + (23:28:10, 6 December 2024)
- IR 05000305/2008025 + (23:28:11, 6 December 2024)
- 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation + (23:28:12, 6 December 2024)
- ML20209C699 + (23:28:13, 6 December 2024)
- ML20209C698 + (23:28:14, 6 December 2024)
- ST-HL-AE-2110, Lists Interlocks Applicable to Reactor Trip & ESFAS Functions Not Shown on Proof & Review Tech Specs.Proposed marked-up Tech Spec Table 3.3-1 Incorporating Interlocks Encl + (23:28:15, 6 December 2024)
- ML20209C692 + (23:28:16, 6 December 2024)
- ML20209C693 + (23:28:16, 6 December 2024)
- NOC-AE-000574, Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 990428 + (23:28:17, 6 December 2024)
- ML20209C687 + (23:28:18, 6 December 2024)
- B12349, Forwards Nonproprietary Vols 1 & 2 & Proprietary Vol 3 to Isap,Haddam Neck Plant,Final Rept. Proprietary Vol Withheld (Ref 10CFR2.790).Affidavit Encl + (23:28:21, 6 December 2024)
- ML20209C683 + (23:28:22, 6 December 2024)
- ML20209C681 + (23:28:23, 6 December 2024)
- ML20209C682 + (23:28:23, 6 December 2024)
- ML20209C678 + (23:28:24, 6 December 2024)
- ML20209C676 + (23:28:25, 6 December 2024)
- ML20209C675 + (23:28:26, 6 December 2024)
- ML20209C674 + (23:28:28, 6 December 2024)
- NOC-AE-000557, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached + (23:28:29, 6 December 2024)
- ML20209C672 + (23:28:29, 6 December 2024)
- ML20209C669 + (23:28:30, 6 December 2024)
- ML20209C668 + (23:28:31, 6 December 2024)
- TXX-6405, Interim Deficiency Rept CP-86-51 Re Hilti Anchor Bolts Which Do Not Meet Average Ultimate Tensile Loads in Certain Sizes as Published by Supplier.Initially Reported on 860717. Evaluation Continuing.Next Rept Expected by 870708 + (23:28:32, 6 December 2024)
- ML20209C662 + (23:28:33, 6 December 2024)