Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210B000 + (22:07:27, 6 December 2024)
- ML20210A999 + (22:07:28, 6 December 2024)
- ML20210A997 + (22:07:29, 6 December 2024)
- ML20210A995 + (22:07:35, 6 December 2024)
- ML20210A991 + (22:07:45, 6 December 2024)
- ML20210A989 + (22:07:48, 6 December 2024)
- B12500, Application for Amend to License NPF-49,changing License Condition 2.C.(6), Instrumentation for Monitoring Post- Accident Conditions Reg Guide 1.97,Rev 2... Re Schedule for Installation of Instrumentation.Fee Paid + (22:07:55, 6 December 2024)
- ML20210A987 + (22:07:55, 6 December 2024)
- ML20210A984 + (22:07:56, 6 December 2024)
- ML20210A983 + (22:07:57, 6 December 2024)
- ML20210A981 + (22:07:57, 6 December 2024)
- ML20210A980 + (22:07:58, 6 December 2024)
- BECO-87-034, Marine Ecology Studies Semiannual Rept 29 for 1986. W/ + (22:08:02, 6 December 2024)
- ML20210A978 + (22:08:08, 6 December 2024)
- ML20210A976 + (22:08:18, 6 December 2024)
- TXX-6427, Final Deficiency Rept CP-86-46 Re Design Change to Vendor Supplied Equipment Made W/O Formal Evaluation by Vendor. Initially Reported on 861021.Bolt Connection Voided & Original Design Requirements Reestablished + (22:08:21, 6 December 2024)
- ML20210A972 + (22:08:30, 6 December 2024)
- ML20210A969 + (22:08:43, 6 December 2024)
- ML20210A968 + (22:08:44, 6 December 2024)
- IR 05000029/1986011 + (22:08:52, 6 December 2024)
- ML20210A960 + (22:08:53, 6 December 2024)
- ML20210A961 + (22:08:53, 6 December 2024)
- ML20210A959 + (22:08:54, 6 December 2024)
- ML20210A957 + (22:09:01, 6 December 2024)
- ML20210A956 + (22:09:01, 6 December 2024)
- U-600817, Application for Amend to License NPF-55,providing Addl Changes to Clarify & Enhance Tech Specs Which Will Accompany Full Power OL for Plant.No Amend of Present Low Power License Requested.Changes Consistent W/Fsar as Amended + (22:09:09, 6 December 2024)
- IR 05000243/1987001 + (22:09:11, 6 December 2024)
- ML20210A949 + (22:09:11, 6 December 2024)
- ML20210A944 + (22:09:12, 6 December 2024)
- ML20210A947 + (22:09:12, 6 December 2024)
- ML20210A943 + (22:09:13, 6 December 2024)
- ML20210A942 + (22:09:13, 6 December 2024)
- ML20210A939 + (22:09:14, 6 December 2024)
- ML20210A937 + (22:09:15, 6 December 2024)
- ML20210A936 + (22:09:15, 6 December 2024)
- ML20210A935 + (22:09:16, 6 December 2024)
- ML20210A934 + (22:09:16, 6 December 2024)
- TAC:59756 + (22:09:17, 6 December 2024)
- ML20210A932 + (22:09:24, 6 December 2024)
- ML20210A931 + (22:09:24, 6 December 2024)
- ML20210A930 + (22:09:25, 6 December 2024)
- ML20210A928 + (22:09:26, 6 December 2024)
- ML20210A929 + (22:09:26, 6 December 2024)
- PY-CEI-NRR-0641, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-05.Corrective Actions:Planning & Control Functions for Plant Emergency Instructions Validation Performed Utilizing Other Documentation Methods + (22:09:37, 6 December 2024)
- ML20210A924 + (22:09:39, 6 December 2024)
- TXX-6414, Interim Deficiency Rept Re Seismic Design of Conduit. Initially Reported on 861021.Corrective Action Dependent on Results of Fiberglass Cloth/Resin Matl Testing for Loading Conditions.Next Rept Will Be Submitted by 870921 + (22:09:40, 6 December 2024)
- ML20210A923 + (22:09:40, 6 December 2024)
- ML20210A919 + (22:09:41, 6 December 2024)
- ML20210A921 + (22:09:41, 6 December 2024)
- ML20210A911 + (22:10:03, 6 December 2024)
- ML20210A910 + (22:10:03, 6 December 2024)
- ML20210A908 + (22:10:04, 6 December 2024)