Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6290, Interim Deficiency Rept CP-86-67 Re Preoperational Vibrational Test Criteria.Initially Reported on 860926. Evaluation Continuing.Next Rept Expected by 870319 + (04:10:55, 6 December 2024)
- ML20211H393 + (04:10:55, 6 December 2024)
- ML20211H392 + (04:10:56, 6 December 2024)
- U-602826, Requests Withdrawal of License Amend Application & Exemption from Requirements of 10CFR50,App a General Design Criterion 17, Electric Power Systems + (04:10:57, 6 December 2024)
- ML20211H387 + (04:10:57, 6 December 2024)
- TXX-6296, Interim Deficiency Rept CP-86-36 Re Large Bore Piping & Supports.Initially Reported on 860609.Continued Engineering Evaluation Has Not Identified Addl Reportable Instances.Next Rept Will Be Submitted by 870410 + (04:10:58, 6 December 2024)
- ML20211H383 + (04:10:59, 6 December 2024)
- ML20211H384 + (04:10:59, 6 December 2024)
- ML20211H381 + (04:11:00, 6 December 2024)
- 05000286/LER-1986-004-01, :on 860519,source-range (SR) high-flux Reactor Trip Initiated Automatically by Nuclear Instrumentation Sys. Caused by Operator Failure to Block SR Instrumentation During Startup.Operator Counseled + (04:11:01, 6 December 2024)
- ML20211H379 + (04:11:02, 6 December 2024)
- ML20211H377 + (04:11:03, 6 December 2024)
- ML20211H374 + (04:11:04, 6 December 2024)
- ML20211H376 + (04:11:04, 6 December 2024)
- ML20211H373 + (04:11:05, 6 December 2024)
- NG-97-1348, Submits QA Program Description for DAEC in Accordance W/ Requirements of 10CFR50.54(a)(3).Program Description Relocates Listed Info from Current Ts,None of Which Is Reduction in Commitment + (04:11:06, 6 December 2024)
- U-602843, Provides Revised Response to Violations Noted in Insp Rept 50-461/97-06.Corrective Actions:Replaced Deformed Piping on B RR Loop Drain Line,Performed Review of Similar Freeze Seal Incidents & Contracted Freeze Seal Activity to Vendor + (04:11:07, 6 December 2024)
- 05000249/LER-1986-005-09, :on 860519,emergency Diesel Generator Automatically Started & Closed 4-kV Bus 34-1 Due to Undervoltage Condition on Bus.Caused by Personnel Error. Individual Counseled + (04:11:09, 6 December 2024)
- ML20211H362 + (04:11:10, 6 December 2024)
- ML20211H357 + (04:11:11, 6 December 2024)
- ML20211H359 + (04:11:11, 6 December 2024)
- 05000423/LER-1986-036, :on 860519,facility Operating Under Tech Spec 3.8.2.1.b Action Statement W/Battery Bank 301a-2 Inoperable Due to Unperformed Mod to Battery Charger.Seismic Bracing Designed & Installed on Battery Charger + (04:11:13, 6 December 2024)
- ML20211H355 + (04:11:14, 6 December 2024)
- ML20211H353 + (04:11:21, 6 December 2024)
- ML20211H350 + (04:11:21, 6 December 2024)
- ML20211H349 + (04:11:22, 6 December 2024)
- ML20211H346 + (04:11:26, 6 December 2024)
- ML20211H345 + (04:11:27, 6 December 2024)
- 05000318/LER-1986-004, :on 860521 & 27,reactor Manually Tripped from 100% Power Due to Low Steam Generator Water Level. Caused by Erroneous Control Signal from Double Ground. Grounded Components Repaired + (04:11:29, 6 December 2024)
- ML20211H340 + (04:11:30, 6 December 2024)
- B12416, Discusses Implementation Status of App R Mods Required by Current App R Fire Protection Analysis.All Nonoutage Mods Completed & Remaining Mods to Be Completed Prior to End of 1987/1988 Refueling Outage + (04:11:31, 6 December 2024)
- ML20211H333 + (04:11:32, 6 December 2024)
- ML20211H334 + (04:11:32, 6 December 2024)
- ML20211H332 + (04:11:33, 6 December 2024)
- TXX-6282, Final Deficiency Rept CP-86-66 Re Noncontact Lap Splices in Auxiliary Bldg.Initially Reported on 860926.Engineering Calculations & Review of Applicable Quality Documents Completed.Issue Not Reportable Per 10CFR50.55(e) + (04:11:34, 6 December 2024)
- HBL-86-032, Forwards PG&E Responses to Public Comments on Des for Decommissioning Humboldt Bay Unit 3. Ack Receipt of Matl on Encl Ltr Requested + (04:11:35, 6 December 2024)
- ML20211H322 + (04:11:36, 6 December 2024)
- ML20211H321 + (04:11:36, 6 December 2024)
- TXX-6291, Interim Deficiency Rept CP-86-54 Re Design & Installation of Control Room Ceiling.Initially Reported on 861003.Resolution of Open QC Insp Items Continuing & Scheduled for Completion by 870630.Next Rept Will Be Submitted by 870721 + (04:11:37, 6 December 2024)
- ML20211H315 + (04:11:38, 6 December 2024)
- ML20211H312 + (04:11:38, 6 December 2024)
- 05000458/LER-1986-057, :on 860923,during Surveillance Test Procedure STP-207-4210,RCWU Sys Isolated.Caused by Inadvertent Grounding of Electrical Jumper Resulting in Blown Fuse.Fuse Replaced.Rcwu Isolation Reset + (04:11:40, 6 December 2024)
- 05000338/LER-1986-008-02, :on 860520,reactor Trip Occurred Due to Closure of All Three Main Feedwater Regulating Valves.Caused by Spurious Actuation of Feedwater Isolation Relay for Feedwater Regulating Valves + (04:11:42, 6 December 2024)
- L-86-491, Forwards Comments on Exam Administered on 861117.Attachment Suppls & Replaces Comments Provided at 861120 Exam Exit Meeting & Contained in Util + (04:11:43, 6 December 2024)
- ML20211H308 + (04:11:44, 6 December 2024)
- 05000250/LER-1987-005, :on 870119,w/unit in Mode 2,control Room Ventilation Isolated & Switched to Recirculation Mode & Containment Vent Isolated.Caused by Process Radiation Monitor Spike.Equipment Being Evaluated + (04:11:45, 6 December 2024)
- 05000220/LER-1986-013, :on 860518,reactor Bldg Emergency Ventilation Sys Initiated Due to Blown Fuse.Caused by Damaged Timer Relay.Timer Repaired,Fuse Replaced & Sys Returned to Svc.W/ + (04:11:47, 6 December 2024)
- ML20211H302 + (04:11:49, 6 December 2024)
- ML20211H299 + (04:11:49, 6 December 2024)
- ML20211H298 + (04:11:50, 6 December 2024)
- ML20211H291 + (04:11:51, 6 December 2024)