Suppls 861203 Request for Exemption Re Emergency Lighting for Control Room as Required by Section Iii.J of App R.Cost Estimate for Installing 8 h,battery-powered Emergency Lighting Units in Control Room Encl,Per 870107 Telcon
ML20211H374
Person / Time
Site: Brunswick  
Issue date: 02/20/1987
From: Cutter A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS-87-013, NLS-87-13, NUDOCS 8702260154
Download: ML20211H374 (2)


Text

- - ____________________________ __

O e

~

Cp&L Carolina Power & Light Company FEB 2 01987 SERIAL: NLS-87-013 10 CFR 50 Appendix R I

United States Nuclear Regulatory Commission ATTENTION: Document Control Desk,

Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS.1 AND 2 DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 SUPPLEMENT TO EXEMPTION REQUEST SECTION III.3 OF APPENDIX R Gentlemen:

A conference call was held on January 7,1987 regarding the Company's December 3, 1986 exemption request. This exemption request concerned emergency lighting for the Brunswick Control Room as required by Section 111.3 of Appendix R.

Enclosure i documents the information provided in this call. In accordance with 10 CFR 50.12, the December 3,1986 exemption request demonstrated that the present control room lighting meets the underlymg purpose of 10 CFR 50, Appendix R.

In addition, the Staff requested a cost estimate of installing eight-hour, battery-powered emergency lighting units in the control room as literally required by Appendix R.

Enclosure I also includes this estimate.

Please refer any further questions regarding this matter to Mr. Stephen D. Floyd at (919) 836-6901.

Yours very tr h

/<

(

A. B. Cutter - Vice%

President Nuclear Engineering & Licensing MAT / mmh (5118 MAT)

Enclosure cc:

Dr. 3. Nelson Grace (NRC-Ril)

Mr. W. H. Ruland (NRC-BNP)

Mr. E. Sylvester (NRC) g2260154870220 F

ADOCK 05000324 PDR m Fayettevdle street

  • P. O Box 1551
  • Raleigh. N C 27602

,b c

.u=-__-

~n

to SERIAL: NLS-87-013 NRC Question Will the station batteries switch on automatically given a loss of offsite power, and are the control room lights automatically powered by the station batteries? If not, what operator actions must be taken to provide power to the lights?

Response

Although the preferred source of emergency power to the control room lights is the diesel generators, the station batteries will automatically supply power to the control room lights, 'vith no time delay or operator action, given a loss of offsite power and failure of the diesel generators.

NRC Question i

How long will the batteries alone provide power for control room lighting in conjunction with other station loads?

Response

l As stated above, the emergency power supply for the control room lights is the diesel generators; however, a fire protection load study indicates that each unit's batteries will provide lighting for a minimum of two hours.

NRC Question What is the cost of installing eight-hour, battery-powered emergency lighting units in the control room?

Response

l This modification would cost approximately $112,000.

f i

l l

l (5118 MAT /meh)

...