Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211N351 + (02:39:31, 6 December 2024)
- ML20211N349 + (02:39:32, 6 December 2024)
- ML20211N350 + (02:39:32, 6 December 2024)
- ML20211N348 + (02:39:33, 6 December 2024)
- ML20211N347 + (02:39:34, 6 December 2024)
- ML20211N346 + (02:39:34, 6 December 2024)
- ML20211N345 + (02:39:35, 6 December 2024)
- ML20211N343 + (02:39:35, 6 December 2024)
- ML20211N342 + (02:39:36, 6 December 2024)
- ST-HL-AE-1693, Forwards Response to SER Confirmatory Item 12 Re Max Discharge Pressure of High Head Safety Injection (HHSI) Pumps.Loca Analyses Performed Using Most Conservative Value for HHSI Discharge Pressure.Item 12 Considered Closed + (02:39:37, 6 December 2024)
- ML20211N340 + (02:39:38, 6 December 2024)
- ML20211N339 + (02:39:38, 6 December 2024)
- ML20211N338 + (02:39:39, 6 December 2024)
- ML20211N337 + (02:39:39, 6 December 2024)
- NG-99-1205, Forwards FFD Rept of Program Performance Info for DAEC During Six Month Period from 990101-0630 + (02:39:40, 6 December 2024)
- ML20211N333 + (02:39:41, 6 December 2024)
- ML20211N334 + (02:39:41, 6 December 2024)
- ML20211N331 + (02:39:42, 6 December 2024)
- ML20211N332 + (02:39:42, 6 December 2024)
- ML20211N330 + (02:39:43, 6 December 2024)
- ML20211N329 + (02:39:43, 6 December 2024)
- ML20211N328 + (02:39:44, 6 December 2024)
- ML20211N327 + (02:39:45, 6 December 2024)
- ML20211N325 + (02:39:47, 6 December 2024)
- ML20211N326 + (02:39:47, 6 December 2024)
- A06182, Responds to 861029 Request for util-proposed Tech Spec Changes Re Reporting of Safety Valve & Relief Valve Failure & Challenges,Control Room Habitability & Secondary Water Chemistry.Schedule for Submittal of Amend Requests Encl + (02:39:48, 6 December 2024)
- ML20211N320 + (02:39:49, 6 December 2024)
- ML20211N318 + (02:39:50, 6 December 2024)
- ML20211N315 + (02:39:51, 6 December 2024)
- ML20211N317 + (02:39:51, 6 December 2024)
- ML20211N314 + (02:39:52, 6 December 2024)
- ML20211N313 + (02:39:53, 6 December 2024)
- IR 05000395/1987003 + (02:39:56, 6 December 2024)
- ML20211N311 + (02:39:56, 6 December 2024)
- ML20211N305 + (02:39:57, 6 December 2024)
- NPL-97-0633, Forwards Revised Detailed Fire Protection/App R Rebaselining Project Schedule Re Commitments Made to Insp Repts 50-266/97-15 & 50-301/97-15.Routine Project Status Updates & Any Significant Scope or Schedule Changes Will Be Provided + (02:39:58, 6 December 2024)
- 05000336/LER-1986-015-01, :on 861114,diesel Generator Differential Relays Not Seismically Qualified for Class IE Svc.Caused by Installation of Nonqualified Relays.Relays Removed from Svc & Replaced + (02:39:59, 6 December 2024)
- B12321, Forwards Fire Protection Evaluation Discussing Shutdown Sys Availability in Event of Fire.Exemption Requests for Containment Liner & Reactor Bldg Instrument Racks Planned. W/O Encl + (02:40:00, 6 December 2024)
- ML20211N297 + (02:40:01, 6 December 2024)
- ML20211N299 + (02:40:01, 6 December 2024)
- ML20211N292 + (02:40:02, 6 December 2024)
- ML20211N294 + (02:40:02, 6 December 2024)
- ML20211N289 + (02:40:03, 6 December 2024)
- IR 05000280/1997011 + (02:40:04, 6 December 2024)
- ML20211N287 + (02:40:04, 6 December 2024)
- ML20211N284 + (02:40:05, 6 December 2024)
- ML20211N278 + (02:40:06, 6 December 2024)
- ML20211N280 + (02:40:06, 6 December 2024)
- ML20211N275 + (02:40:07, 6 December 2024)
- ML20211N277 + (02:40:07, 6 December 2024)
- ML20211N274 + (02:40:08, 6 December 2024)