Informs That Issue Documented in Insp Repts 50-373/96-11 & 50-374/96-11 Re Combination of Surveillances LTS-600-19 & LTS-600-23 w/LTS-1000-4,will Be Resolved as Listed
ML20211N277
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/10/1997
From: Subalusky W
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-373-96-11, 50-374-96-11, NUDOCS 9710160077
Download: ML20211N277 (2)


Text

_

ninununu. inn iuun n.n.3ini Ja:Nalle ( cntrating Atation 2601 North.tivt Ro.id Man.rslics, il 61.411CU o

1,l Hli.4UC6 4 1

October 10,1997 1

United States Nuclear Regulatory Commission l

Attention: Document Control Desk Washington, D.C. 20555

Subject:

Clarification to System Operational Performance inspection (NRC Inspection Report No. 50 373/96011(DRS); 50-374/96011(DRS))

LaSalle County Station, Units 1 and 2 Facility Operating License NPF 11 and NPF-18 NRC Docket Nos. 50 373 and 50 374

Reference:

G. E. Grant letter to W. T. Subalusky, dated November 15,1996, Transmitting NRC Inspection Report 50 373/374 96011 The subject inspection Report, in Section M3.3 b. Observations and Findinas, states that "The licensee... clarified the procedure to specify a maximum acceptable sedimentation height," and later, that "The licensee combined surveillances LTS 600-10 and LTS 600 23 with LTS 1000-4, and applied the surveillance requirement to the entire lake screen house, thereby including the service water tunnel and resolving the issue."

During a review by Site Quality Verification, it was identified that the subject procedures were not changed. Due to the amount of time that has elapsed since the inspection, we were unable to determine the cause of the apparent mis-communication between the Inspector and our staff, however, the issue documented in the Inspection Report will be resolved as indicated below:

j A Technical Specification change has been submitted to revise e

the inspection requirements for the Lake Screen House inlet Bays, Service Water Tunnel and CSCS Bypass Line. The i

procedures will be revised to implement the fechnical Specification change following approval, which is currently anticipated in December 1997 (NTS# 373 200 96 00150.05A) f LCDh )O yA *IE Ehd UlliIlll[llElllll!!!Blll

__ e -

LTS 60019, LTS 600 23 and LTS 1000 4 will be combined into a single surveillance procedure prior to Unit 1 restart (NTS# 373 200 96 00150.05A)

If there are any questions or comments conceming this letter, please refer them to Perry Barnes, Regulatory Assurance Supentisor, at (815) 357 6761, extension 2383.

Respectfully, f.%%-

W. T. Subalusky Site Vice President LaSalle County S',stlon cc: